← Back
One story retail building
6424 4 AVENUE
BROOKLYN · Bay Ridge · BIN 3144148
💬 Discuss this project
1931Year Built
1Stories
K1Building Class
R5BZoning
1,175 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One story retail building · Owner of record: 65TH STREET, LLC · 3,503 sf lot · 0.34 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
65 ST LLC203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHRAF CORP207/18/2023
IAA ARCHITECTS PLLC108/16/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TASHEED BUILDING CONSULTANTS303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
IQ CONTRACTORSGeneral Contractor303/21/2026
JOHN FITZGERALD PLBG &HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASHRAF CORPORATION1973107/18/2023
MJE CONSULTING ENGINEERIN8522104/22/2022
Building Lifecycle
All (25)Filed (3)Permit Issued (2)Signed Off (2)Violation (4)Inspection (8)Special Inspection (6)
08/22/2023
Signed off — Alteration
FILING FOR INTERIOR ALTERATION OF THE EXISTING COMMERCIAL STORE FOR DELI GROCERY ( USE GROUP 6 ) FLOORING, CEILING , NON-BEARING PARTITIONS, CARPENTRY AND FINISHES, AND HOOD FOR DELI KITCHEN NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00709763-I1
07/24/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/19/2023
Special inspection requirement — Mechanical Systems
Evodia Ibrahim
07/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Evodia Ibrahim
07/19/2023
Special inspection requirement — Final
BRIAN MCCAFFREY
07/18/2023
Filed — Alteration
FILING FOR INTERIOR ALTERATION OF THE EXISTING COMMERCIAL STORE FOR DELI GROCERY ( USE GROUP 6 ) FLOORING, CEILING , NON-BEARING PARTITIONS, CARPENTRY AND FINISHES, AND HOOD FOR DELI KITCHEN NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00709763-P1
07/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
AKM HOQUE
07/10/2023
Special inspection requirement — Mechanical Systems
AKM HOQUE
07/10/2023
Special inspection requirement — Final
BRIAN MCCAFFREY
06/27/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
06/22/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
06/05/2023
Signed off — Alteration
FILING FOR PLUMBING WORK AT THE EXISTING RETAIL DELI STORE , IN CONJUNCTION WITH APPLICATION # B00709763, COMMERCIAL COOKING EQUIPMENTS, AND SINKS.
B00716054-I1
02/22/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/15/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/13/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/04/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/04/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/23/2022
Permit issued — Plumbing
B00716054-I1-PL
08/16/2022
Filed — Alteration
FILING FOR PLUMBING WORK AT THE EXISTING RETAIL DELI STORE , IN CONJUNCTION WITH APPLICATION # B00709763, COMMERCIAL COOKING EQUIPMENTS, AND SINKS.
B00716054-I1
04/29/2022
Permit issued — Mechanical Systems
B00709763-I1-GC-CX
04/22/2022
Filed — Alteration
FILING FOR INTERIOR ALTERATION OF THE EXISTING COMMERCIAL STORE FOR DELI GROCERY ( USE GROUP 6 ) FLOORING, CEILING , NON-BEARING PARTITIONS, CARPENTRY AND FINISHES, AND HOOD FOR DELI KITCHEN NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00709763-I1
04/13/2010
Violation issued (ECB, closed)
Construction
04/11/2008
Violation issued (ECB, closed)
Construction
11/26/2004
Violation issued (ECB, closed)
Construction
10/31/2003
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG09/23/2022
DOB NOWMechanical SystemsSigned-offIQ CONTRACTORS04/29/2022
2 projects · most recent 08/12/2022
General Wiring
FiledStatusContractorScope
08/12/2022Permit IssuedWCK ELECTRIC CORP.4 meters, 1 new_meters
08/02/2022Permit IssuedWCK ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
07/24/2023Pass-Final General Construction Non-Directive 14PassView ↗
06/27/2023Fail-Final General Construction Non-Directive 14FailView ↗
06/22/2023Fail-Final General Construction Non-Directive 14FailView ↗
02/22/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/15/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/13/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/04/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/04/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
07/19/2023Mechanical SystemsEvodia Ibrahimspecial
07/19/2023Fire-Resistant Penetrations and JointsEvodia Ibrahimspecial
07/19/2023FinalBRIAN MCCAFFREYprogress
07/10/2023Fire-Resistant Penetrations and JointsAKM HOQUEspecial
07/10/2023Mechanical SystemsAKM HOQUEspecial
07/10/2023FinalBRIAN MCCAFFREYprogress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/29/2026B00709763-P1Request digital key ↗
08/29/2026B00709763-I1Request digital key ↗
08/28/2026B00716054-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/29/2026B00709763-P1Open ↗
08/29/2026B00709763-I1Open ↗
08/28/2026B00716054-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026B00709763-I1Open ↗
09/01/2026B00709763-P1Open ↗
09/01/2026B00709763-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/02/2026B00709763-I1Open ↗
09/01/2026B00709763-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/29/2026B00709763-P1Open ↗
08/29/2026B00709763-I1Open ↗
08/28/2026B00716054-I1Open ↗