← Back
Three families
645 40 STREET
BROOKLYN · BIN 3017870
💬 Discuss this project
1910Year Built
2Stories
C0Building Class
R6BZoning
3,240 sfGross Floor Area
3Units
Rent Stabilized2 Open Violations ▸FDNY Report ↗
Three families · Owner of record: GEELY REALTY INC. · 2,504 sf lot · 1.29 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Floor 33p · 1 filing · 10 docs
Floor 21p · 1 filing · 10 docs
Floor 14p · 2 filings · 14 docs
Cellar2p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GEELY REALTY INC203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/10/2016$1.6M—— → —$478/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BASSIRI506/07/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KALE CONSTRUCTION INCGeneral Contractor107/08/2026
JOHN FITZGERALD PLBG &HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394306/07/2025
Building Lifecycle
All (64)Filed (5)Permit Issued (2)Signed Off (2)Violation (45)Inspection (4)Special Inspection (6)
05/01/2026
Violation issued (HPD, open)
A
06/26/2025
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW WASHER, DRYER, BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01144410-I1
06/17/2025
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01144409-I1
06/16/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
06/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
06/11/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
06/07/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01144409-P2
06/06/2025
Violation issued (HPD, closed)
A
05/23/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/16/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01144409-P1
05/16/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW WASHER, DRYER, BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01144410-P1
05/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
05/16/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
05/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
04/17/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/17/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/06/2024
Permit issued — Plumbing
B01144410-I1-PL
12/02/2024
Permit issued — General Construction
B01144409-I1-GC
11/27/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW WASHER, DRYER, BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01144410-I1
11/27/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01144409-I1
04/08/2024
Violation issued (HPD, closed)
A
03/20/2023
Violation issued (HPD, closed)
A
11/14/2022
Violation issued (HPD, closed)
I
02/22/2022
Violation issued (HPD, closed)
A
04/06/2021
Violation issued (HPD, closed)
I
04/06/2021
Violation issued (HPD, closed)
A
09/06/2019
Violation issued (HPD, closed)
B
09/06/2019
Violation issued (HPD, closed)
B
09/06/2019
Violation issued (HPD, closed)
A
06/29/2019
Violation issued (HPD, open)
A
06/29/2019
Violation issued (HPD, closed)
C
06/29/2019
Violation issued (HPD, closed)
C
06/29/2019
Violation issued (HPD, closed)
C
04/10/2019
Violation issued (HPD, closed)
A
04/10/2019
Violation issued (HPD, closed)
B
10/17/2018
Violation issued (HPD, closed)
B
10/17/2018
Violation issued (HPD, closed)
C
10/17/2018
Violation issued (HPD, closed)
B
10/17/2018
Violation issued (HPD, closed)
B
11/16/2017
Violation issued (HPD, closed)
I
11/08/2017
Violation issued (HPD, closed)
B
11/08/2017
Violation issued (HPD, closed)
A
11/08/2017
Violation issued (HPD, closed)
A
11/08/2017
Violation issued (HPD, closed)
B
11/08/2017
Violation issued (HPD, closed)
B
11/08/2017
Violation issued (HPD, closed)
A
11/08/2017
Violation issued (HPD, closed)
A
11/08/2017
Violation issued (HPD, closed)
B
11/08/2017
Violation issued (HPD, closed)
C
11/08/2017
Violation issued (HPD, closed)
A
11/08/2017
Violation issued (HPD, closed)
A
11/08/2017
Violation issued (HPD, closed)
C
11/08/2017
Violation issued (HPD, closed)
C
11/08/2017
Violation issued (HPD, closed)
C
11/08/2017
Violation issued (HPD, closed)
C
11/08/2017
Violation issued (HPD, closed)
C
11/08/2017
Violation issued (HPD, closed)
A
11/08/2017
Violation issued (HPD, closed)
A
11/08/2017
Violation issued (HPD, closed)
B
Latest 60 of 64 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG12/06/2024
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC12/02/2024
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/16/2025Pass-Final General Construction Non-Directive 14PassView ↗
05/23/2025Fail-Final General Construction Non-Directive 14FailView ↗
04/17/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/17/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
06/11/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
06/11/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
06/11/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
05/16/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
05/16/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
05/16/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/23/2026B01144410-I1Request digital key ↗
08/23/2026B01144410-P1Request digital key ↗
08/23/2026B01144409-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/23/2026B01144410-P1Open ↗
08/23/2026B01144410-I1Open ↗
08/23/2026B01144409-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026B01144409-P1Open ↗
08/28/2026B01144409-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B01144409-P1Open ↗
08/28/2026B01144409-I1Open ↗