← Back
Four families
645 ALABAMA AVENUE
BROOKLYN · East New York-New Lots · BIN 3096318
💬 Discuss this project
1924Year Built
2Stories
C3Building Class
R6Zoning
3,933 sfGross Floor Area
4Units
Rent Stabilized19 Open Violations 5 unresolved · 14 paperwork only ▸FDNY Report ↗
Four families · Owner of record: MNB ALABAMA LLC · 3,682 sf lot · 1.07 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbingGeneral
Floor 22p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
Cellar7p · 1 filing · 20 docs
Site & exterior4p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MNB ALABAMA LLC203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/18/2019$275K—— → —$70/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIC 88 CORP509/18/2025
FL&M ENGINEERING DESIGN &INSPECTION102/17/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS403/21/2026
GREEN STUDIO203/21/2026
SRG603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUBE BUILDERS GROUP NYGeneral Contractor104/09/2026
MANHATTAN D ENTERPRISESGeneral Contractor107/08/2026
PIPESTYLISTS, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIC 88 CORP8371509/18/2025
Building Lifecycle
All (113)Filed (6)Permit Issued (3)Violation (60)Inspection (4)Objection (10)Special Inspection (30)
05/01/2026
Violation issued (HPD, closed)
A
01/23/2026
Violation issued (ECB, open)
Construction
10/10/2025
Special inspection requirement — Mechanical Systems
Eric Sun
10/10/2025
Special inspection requirement — Final
Eric Sun
10/10/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
10/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
Eric Sun
10/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
09/22/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/18/2025
Filed — Alteration
INTERIOR RENOVATION OF CELLAR, 1ST AND 2ND FLOOR OF EXISTING 2 STORY BUILDING. INSTALL NEW HVAC, NEW PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT, WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01201392-P3
09/15/2025
Special inspection requirement — Insulation placement and R values
Eric Sun
09/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Sun
09/15/2025
Special inspection requirement — HVAC-R and service water heating equipment
Eric Sun
09/15/2025
Special inspection requirement — Maintenance information
Eric Sun
09/15/2025
Special inspection requirement — Fenestration air leakage
Eric Sun
09/15/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Eric Sun
09/15/2025
Special inspection requirement — Interior lighting power
Eric Sun
09/15/2025
Special inspection requirement — HVAC-R and service water heating system controls
Eric Sun
09/15/2025
Special inspection requirement — Air barrier - visual inspection
Eric Sun
09/15/2025
Special inspection requirement — Fenestration areas
Eric Sun
09/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
09/15/2025
Special inspection requirement — Mechanical Systems
Eric Sun
09/15/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
09/15/2025
Special inspection requirement — Final
Eric Sun
09/15/2025
Special inspection requirement — Fire-Resistance Rated Construction
Eric Sun
09/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/10/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/04/2025
Special inspection requirement — HVAC-R and service water heating equipment
Eric Sun
09/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
09/04/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
09/04/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Sun
09/04/2025
Special inspection requirement — HVAC-R and service water heating system controls
Eric Sun
08/26/2025
Objection resolved — Addressed
08/26/2025
Objection resolved — Addressed
08/26/2025
Objection resolved — Addressed
08/22/2025
Objection raised — Plumbing
08/22/2025
Objection raised — Other
08/22/2025
Objection raised — Cost
08/11/2025
Filed — Alteration
INTERIOR RENOVATION OF CELLAR, 1ST AND 2ND FLOOR OF EXISTING 2 STORY BUILDING. INSTALL NEW HVAC, NEW PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT, WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01201392-P2
08/04/2025
Permit issued — Plumbing
B01201392-S1-PL
07/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
07/25/2025
Special inspection requirement — HVAC-R and service water heating system controls
Eric Sun
07/25/2025
Special inspection requirement — HVAC-R and service water heating equipment
Eric Sun
07/25/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Sun
07/25/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
07/24/2025
Permit issued — General Construction
B01201392-I1-GC-CX
06/26/2025
Filed — Alteration
INTERIOR RENOVATION OF CELLAR, 1ST AND 2ND FLOOR OF EXISTING 2 STORY BUILDING. INSTALL NEW HVAC, NEW PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT, WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01201392-S1
06/25/2025
Filed — Alteration
INTERIOR RENOVATION OF CELLAR, 1ST AND 2ND FLOOR OF EXISTING 2 STORY BUILDING. INSTALL NEW HVAC, NEW PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT, WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01201392-P1
06/06/2025
Violation issued (HPD, closed)
A
05/12/2025
Objection resolved — Addressed
04/29/2025
Objection resolved — Addressed
04/18/2025
Objection raised — Admin
04/18/2025
Objection raised — Cost
04/11/2025
Filed — Alteration
INTERIOR RENOVATION OF CELLAR, 1ST AND 2ND FLOOR OF EXISTING 2 STORY BUILDING. INSTALL NEW HVAC, NEW PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT, WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01201392-I1
03/05/2025
Violation issued (ECB, closed)
Construction
03/05/2025
Violation issued (ECB, closed)
Construction
01/14/2025
Violation issued (HPD, closed)
C
01/14/2025
Violation issued (HPD, closed)
C
04/08/2024
Violation issued (HPD, closed)
A
12/13/2023
Violation issued (HPD, closed)
C
Latest 60 of 113 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offT & T PLUMBING INC08/04/2025
DOB NOWGeneral ConstructionPermit IssuedCUBE BUILDERS GROUP NY07/24/2025
DOB NOWSidewalk ShedPermit IssuedMANHATTAN D ENTERPRISES02/17/2023
1 project · most recent 09/18/2025
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/18/2025Permit IssuedCUBE BUILDERS GROUP NYAir Conditioning Systems
Cooling
Apower AP4M30HP230VMO 30,000 BTU · Condensing Unit ×6
AP3M24HP230VMO 24,000 BTU · Condensing Unit ×2
Daikin MXZ-3C24NA 24,000 BTU · Condensing Unit ×5
1 project · most recent 09/18/2025
Gas Water/Sanitary
FiledStatusContractorScope
09/18/2025Signed-offT & T PLUMBING INCGas, Water/Sanitary
1 project · most recent 02/16/2023
FiledStatusContractorScope
02/16/2023Permit IssuedSOLAS ELECTRICAL CORP—
1 project · most recent 02/17/2023
Sidewalk Shed
FiledStatusContractorScope
02/17/2023Permit IssuedMANHATTAN D ENTERPRISESSidewalk Shed
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/22/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/12/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/10/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
10/10/2025Mechanical SystemsEric Sunspecial
10/10/2025FinalEric Sunprogress
10/10/2025Energy Code Compliance InspectionsEric Sunprogress
10/10/2025Fire-Resistance Rated ConstructionEric Sunprogress
10/10/2025Fire-Resistant Penetrations and JointsEric Sunspecial
09/15/2025Insulation placement and R valuesEric Sunenergy_progress
09/15/2025HVAC-R and service water piping design and insulationEric Sunenergy_progress
09/15/2025HVAC-R and service water heating equipmentEric Sunenergy_progress
09/15/2025Maintenance informationEric Sunenergy_progress
09/15/2025Fenestration air leakageEric Sunenergy_progress
09/15/2025Fenestration and door U-factor and product ratingsEric Sunenergy_progress
09/15/2025Interior lighting powerEric Sunenergy_progress
09/15/2025HVAC-R and service water heating system controlsEric Sunenergy_progress
09/15/2025Air barrier - visual inspectionEric Sunenergy_progress
09/15/2025Fenestration areasEric Sunenergy_progress
09/15/2025Fire-Resistant Penetrations and JointsEric Sunspecial
09/15/2025Mechanical SystemsEric Sunspecial
09/15/2025Energy Code Compliance InspectionsEric Sunprogress
09/15/2025FinalEric Sunprogress
09/15/2025Fire-Resistance Rated ConstructionEric Sunprogress
09/04/2025HVAC-R and service water heating equipmentEric Sunenergy_progress
09/04/2025Fire-Resistant Penetrations and JointsEric Sunspecial
09/04/2025Energy Code Compliance InspectionsEric Sunprogress
09/04/2025HVAC-R and service water piping design and insulationEric Sunenergy_progress
09/04/2025HVAC-R and service water heating system controlsEric Sunenergy_progress
Latest 25 of 30.
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/27/2026B00830534-I1Request digital key ↗
08/20/2026B01201392-S1Request digital key ↗
08/20/2026B01201392-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/20/2026B01201392-S1Open ↗
08/20/2026B01201392-I1Open ↗
08/20/2026B01201392-P4Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026B01201392-P2Open ↗
09/01/2026B01201392-P2Open ↗
08/31/2026B01201392-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B01201392-P2Open ↗
08/31/2026B01201392-S1Open ↗
08/27/2026B01201392-P3Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/20/2026B01201392-S1Open ↗
08/20/2026B01201392-I1Open ↗
08/20/2026B01201392-P4Open ↗
Showing 3 of 6 on file for this type