← Back
Large suburban residence
645 EAST 17 STREET
BROOKLYN · Flatbush (West)-Ditmas Park-Parkville · BIN 3121302
💬 Discuss this project
1912Year Built
2.5Stories
A3Building Class
R1-2Zoning
2,506 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Large suburban residence · 3,600 sf lot · 0.7 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Attic6p · 1 filing · 4 docs
Floor 32p · 1 filing · 4 docs
Floor 214p · 2 filings · 20 docs
Floor 114p · 2 filings · 20 docs
Cellar6p · 1 filing · 4 docs
Basement2p · 1 filing · 4 docs
Sub-Basement8p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/18/2019$1.8M—Private party → Private party$714/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
URBAN PIONEERING ARCHITECTURE407/12/2021
GUTH DECONZO CONSULTING ENGINEERS,105/21/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
URBAN PIONEERING ARCHITECTURE DPC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CRESCO ELECTRICAL CORPElectrical103/22/2026
STIVAN PLUMBING & HTG INCGeneral Contractor107/08/2026
STIVAN PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
URBAN PIONEERING ARCHITEC6521507/12/2021
Building Lifecycle
All (32)Filed (5)Permit Issued (2)Signed Off (2)Violation (2)Special Inspection (21)
07/29/2021
Signed off — Alteration
Replace exist sink & HWH at cellar. Replace existing kitchen fixtures & appliances at first floor. Replace existing bath fixtures at second floor. Install new bath at second floor. Install new washer & dryer at second floor.
B00279178-I1
07/14/2021
Special inspection requirement — HVAC and service water heating system controls
James Hill
07/14/2021
Special inspection requirement — Maintenance information
James Hill
07/14/2021
Special inspection requirement — HVAC and service water heating equipment
James Hill
07/14/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Hill
07/14/2021
Special inspection requirement — HVAC insulation and sealing
James Hill
07/14/2021
Special inspection requirement — Fire-Resistance Rated Construction
James Hill
07/14/2021
Special inspection requirement — Energy Code Compliance Inspections
James Hill
07/12/2021
Filed — Alteration
Replace exist sink & HWH at cellar. Replace existing kitchen fixtures & appliances at first floor. Replace existing bath fixtures at second floor. Install new bath at second floor. Install new washer & dryer at second floor.
B00279178-P3
03/31/2021
Filed — Alteration
Replace exist sink & HWH at cellar. Replace existing kitchen fixtures & appliances at first floor. Replace existing bath fixtures at second floor. Install new bath at second floor. Install new washer & dryer at second floor.
B00279178-P2
03/30/2021
Special inspection requirement — Maintenance information
James Hill
03/30/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Hill
03/30/2021
Special inspection requirement — Energy Code Compliance Inspections
James Hill
03/30/2021
Special inspection requirement — Fire-Resistance Rated Construction
James Hill
03/30/2021
Special inspection requirement — HVAC insulation and sealing
James Hill
03/30/2021
Special inspection requirement — HVAC and service water heating system controls
James Hill
03/30/2021
Special inspection requirement — HVAC and service water heating equipment
James Hill
03/08/2021
Signed off — Alteration
B00283307-I1
12/10/2020
Filed — Alteration
Replace exist sink & HWH at cellar. Replace existing kitchen fixtures & appliances at first floor. Replace existing bath fixtures at second floor. Install new bath at second floor. Install new washer & dryer at second floor.
B00279178-P1
12/09/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Hill
12/09/2020
Special inspection requirement — HVAC and service water heating system controls
James Hill
12/09/2020
Special inspection requirement — Maintenance information
James Hill
12/09/2020
Special inspection requirement — HVAC and service water heating equipment
James Hill
12/09/2020
Special inspection requirement — HVAC insulation and sealing
James Hill
12/09/2020
Special inspection requirement — Fire-Resistance Rated Construction
James Hill
12/09/2020
Special inspection requirement — Energy Code Compliance Inspections
James Hill
09/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/03/2020
Permit issued — Mechanical Systems
B00283307-I1-MS
08/03/2020
Permit issued — Plumbing
B00279178-I1-PL
05/21/2020
Filed — Alteration
B00283307-I1
05/14/2020
Filed — Alteration
Replace exist sink & HWH at cellar. Replace existing kitchen fixtures & appliances at first floor. Replace existing bath fixtures at second floor. Install new bath at second floor. Install new washer & dryer at second floor.
B00279178-I1
03/06/2020
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offSTIVAN PLUMBING & HTG INC08/03/2020
DOB NOWPlumbingSigned-offSTIVAN PLBG & HTG INC08/03/2020
BISOTISSUEDKALINIC CONSTRUCTION INC07/30/2020
1 project · most recent 01/26/2021
General Wiring
FiledStatusContractorScope
01/26/2021CompleteCRESCO ELECTRICAL CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
07/14/2021HVAC and service water heating system controls James Hillenergy_progress
07/14/2021Maintenance informationJames Hillenergy_progress
07/14/2021HVAC and service water heating equipment James Hillenergy_progress
07/14/2021Fire-Resistant Penetrations and JointsJames Hillspecial
07/14/2021HVAC insulation and sealing James Hillenergy_progress
07/14/2021Fire-Resistance Rated ConstructionJames Hillprogress
07/14/2021Energy Code Compliance InspectionsJames Hillprogress
03/30/2021Maintenance informationJames Hillenergy_progress
03/30/2021Fire-Resistant Penetrations and JointsJames Hillspecial
03/30/2021Energy Code Compliance InspectionsJames Hillprogress
03/30/2021Fire-Resistance Rated ConstructionJames Hillprogress
03/30/2021HVAC insulation and sealing James Hillenergy_progress
03/30/2021HVAC and service water heating system controls James Hillenergy_progress
03/30/2021HVAC and service water heating equipment James Hillenergy_progress
12/09/2020Fire-Resistant Penetrations and JointsJames Hillspecial
12/09/2020HVAC and service water heating system controls James Hillenergy_progress
12/09/2020Maintenance informationJames Hillenergy_progress
12/09/2020HVAC and service water heating equipment James Hillenergy_progress
12/09/2020HVAC insulation and sealing James Hillenergy_progress
12/09/2020Fire-Resistance Rated ConstructionJames Hillprogress
12/09/2020Energy Code Compliance InspectionsJames Hillprogress
▾Documents — 66 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch - Plumbing4
09/02/2026B00279178-I1Request digital key ↗
09/02/2026B00279178-P2Request digital key ↗
08/15/2026B00279178-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00283307-I1Request digital key ↗
▸Applications & Permits9
▸DOB NOWLPC Approval/Permit5
08/13/2026B00279178-P2Open ↗
08/13/2026B00283307-I1Open ↗
08/13/2026B00279178-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
12/10/2020340710564Open ↗
01/31/2020340710564Open ↗
12/19/2019340710564Open ↗
▸BISWORK PERMIT APPLICATION1
07/30/2020340710564Open ↗
▸Seals & Professional Certifications27
▸DOB NOWProgress Inspector Seal & Signature18
09/22/2026B00279178-P1Open ↗
09/22/2026B00279178-P1Open ↗
09/22/2026B00279178-P1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/13/2026B00279178-P1Open ↗
08/13/2026B00279178-P3Open ↗
08/13/2026B00279178-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/22/2026B00279178-P1Open ↗
08/27/2026B00279178-P2Open ↗
08/23/2026B00279178-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/19/2019340710564Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
12/19/2019340710564Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/13/2026B00279178-P2Open ↗
08/13/2026B00283307-I1Open ↗
08/13/2026B00279178-P3Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/19/2019340710564Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
01/26/2021340710564Open ↗
12/19/2019340710564Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/26/2021340710564Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
01/26/2021340710564Open ↗
03/17/2020340710564Open ↗
02/13/2020340710564Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION2
03/17/2020340710564Open ↗
03/17/2020340710564Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/26/2021340710564Open ↗
▸BISLANDMARKS SIGNOFF1
01/26/2021340710564Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
01/26/2021340710564Open ↗
03/31/2020340710564Open ↗
12/19/2019340710564Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION3
12/10/2020340710564Open ↗
03/17/2020340710564Open ↗
02/13/2020340710564Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/19/2019340710564Open ↗