← Back
Two family brick
645 MARCY AVENUE
BROOKLYN · BIN 3413810
💬 Discuss this project
2010Year Built
3Stories
B1Building Class
R7AZoning
5,995 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family brick · Owner of record: 645 MARCY LLC · 1,740 sf lot · 3.45 FAR built · Flood zone X
Locations of Work
StructuralMechanicalFire ProtectionGeneral
Roof3p · 2 filings · 20 docs
Bulkhead1p · 1 filing · 20 docs
Penthouse3p · 2 filings · 20 docs
Floor 41p · 1 filing · 17 docs
Floor 32p · 1 filing · 17 docs
Floor 25p · 2 filings · 20 docs
Floor 12p · 2 filings · 20 docs
Cellar2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNER'S REP703/22/2026
645 MARCY LLC103/22/2026
SOLAS ELECTRICAL CORP103/22/2026
MANHATTAN D ENTERPRISES203/22/2026
KANDOS CONSTRUCTION103/22/2026
24 STANHOPE1103/21/2026
573 ELTON COURT103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREEN STUDIO203/21/2026
BAC Developers Group803/21/2026
ADVANCED BUILDERS SERVICES203/21/2026
GEIGER E A GROUP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BB EMPIRE CORPGeneral Contractor2407/08/2026
MANHATTAN D ENTERPRISESGeneral Contractor1007/08/2026
GWT ENTERPRISES INCGeneral Contractor603/21/2026
NEU, RICHARDElectrical103/21/2026
RICHARD NEUElectrical103/21/2026
SERGIO GIANNACHIElectrical103/21/2026
DOWNEY, CONORElectrical103/21/2026
F.S. WORKS INCFire Protection107/08/2026
S & J INDUSTRIAL CORPFire Protection107/08/2026
EMPIRE ID CONSTRUCTION COGeneral Contractor103/26/2026
SOLAS ELECTRICAL CORPElectrical103/22/2026
GENARO URUETAElectrical103/21/2026
LELIS, ARILSONElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REGIONAL TESTING CORP.394802/29/2024
Building Lifecycle
All (85)Filed (14)Permit Issued (18)Signed Off (8)Violation (7)Inspection (2)Objection (6)Special Inspection (30)
12/05/2025
Violation issued (ECB, closed)
Construction
09/08/2025
Signed off — Alteration
B01145988-I1
08/28/2025
Violation issued (ECB, closed)
Construction
08/28/2025
Violation issued (ECB, closed)
Construction
08/28/2025
Violation issued (ECB, closed)
Construction
08/27/2025
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01160106-I1
01/28/2025
Permit issued — Construction Fence
B01145988-I1-FN
01/23/2025
Permit issued — General Construction
B01123632-I1-GC
12/26/2024
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01160106-I1
12/26/2024
Permit issued — Supported Scaffold
B01160106-I1-SH
12/26/2024
Permit issued — Supported Scaffold
B01160106-I1-SF
11/25/2024
Permit issued — Construction Fence
B01145988-I1-FN
11/21/2024
Filed — Alteration
B01145988-I1
10/30/2024
Permit issued — General Construction
B01123632-I1-GC
10/14/2024
Filed — Alteration
B01123632-I1
04/01/2024
Signed off — Alteration
Sprinkler filed in conjunction with Alt 1 Job Number 321779063.
B00194121-I1
03/15/2024
Special inspection requirement — HVAC and service water heating equipment
Paul Raymond
03/15/2024
Special inspection requirement — Maintenance information
Paul Raymond
03/15/2024
Special inspection requirement — Mechanical Systems
Paul Raymond
03/15/2024
Special inspection requirement — Final
Paul Raymond
03/15/2024
Special inspection requirement — HVAC insulation and sealing
Paul Raymond
03/15/2024
Special inspection requirement — Shutoff dampers
Paul Raymond
03/15/2024
Special inspection requirement — HVAC and service water heating system controls
Paul Raymond
03/11/2024
Objection resolved — Addressed
03/07/2024
Objection raised — Other
03/05/2024
Signed off — Alteration
B00215276-I1
02/29/2024
Filed — Alteration
Sprinkler filed in conjunction with Alt 1 Job Number 321779063.
B00194121-P3
02/22/2024
Special inspection requirement — Final
Paul Raymond
02/22/2024
Special inspection requirement — Maintenance information
Paul Raymond
02/22/2024
Special inspection requirement — Mechanical Systems
Paul Raymond
02/22/2024
Special inspection requirement — HVAC and service water heating system controls
Paul Raymond
02/22/2024
Special inspection requirement — HVAC and service water heating equipment
Paul Raymond
02/22/2024
Special inspection requirement — HVAC insulation and sealing
Paul Raymond
02/22/2024
Special inspection requirement — Shutoff dampers
Paul Raymond
02/06/2024
Signed off — Alteration
Sprinkler filed in conjunction with Alt 1 Job Number 321779063.
B00194121-S1
01/17/2024
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
01/04/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
12/19/2023
Special inspection requirement — Sprinkler Systems
Paul Raymond
12/11/2023
Filed — Alteration
Sprinkler filed in conjunction with Alt 1 Job Number 321779063.
B00194121-P2
12/08/2023
Permit issued — Sprinklers
B00194121-S1-EW-SP
11/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
11/27/2023
Special inspection requirement — Sprinkler Systems
Paul Raymond
08/03/2023
Permit issued — Construction Fence
B00215276-I1-FN
07/12/2023
Signed off — Alteration
B00591537-I1
07/12/2023
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS, PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER # 33 OF THE CODE 2014, NO CHANGES IN USE, EGRESS AND OCCUPANCY UNDER THIS APPLICATION.
B00610583-I1
03/17/2023
Permit issued — Mechanical Systems
B00194121-I1-MS
03/14/2023
Signed off — Alteration
Structure filed in conjunction with Alt 1 job number 321779063.
B00197719-I1
03/03/2023
Permit issued — Structural
B00197719-I1-ST
01/13/2023
Permit issued — Sprinklers
B00194121-S1-EW-SP
10/03/2022
Permit issued — Supported Scaffold
B00610583-I1-SF
09/12/2022
Permit issued — Sidewalk Shed
B00591537-I1-SH
08/03/2022
Permit issued — Construction Fence
B00215276-I1-FN
05/26/2022
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS, PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER # 33 OF THE CODE 2014, NO CHANGES IN USE, EGRESS AND OCCUPANCY UNDER THIS APPLICATION.
B00610583-P1
04/06/2022
Violation issued (ECB, closed)
Construction
04/06/2022
Violation issued (ECB, closed)
Construction
11/08/2021
Special inspection requirement — Final
Paul Raymond
11/08/2021
Special inspection requirement — Post-installed Anchors
Paul Raymond
11/08/2021
Special inspection requirement — Masonry
Paul Raymond
11/08/2021
Special inspection requirement — Structural Steel - Welding
Paul Raymond
Latest 60 of 85 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offBB EMPIRE CORP01/28/2025
DOB NOWGeneral ConstructionPermit IssuedBB EMPIRE CORP01/23/2025
DOB NOWSupported ScaffoldSigned-offGWT ENTERPRISES INC12/26/2024
DOB NOWSupported ScaffoldSigned-offGWT ENTERPRISES INC12/26/2024
DOB NOWConstruction FenceSigned-offBB EMPIRE CORP11/25/2024
DOB NOWGeneral ConstructionPermit IssuedBB EMPIRE CORP10/30/2024
DOB NOWSprinklersSigned-offF.S. WORKS INC12/08/2023
DOB NOWConstruction FenceSigned-offBB EMPIRE CORP08/03/2023
DOB NOWMechanical SystemsSigned-offBB EMPIRE CORP03/17/2023
DOB NOWStructuralSigned-offBB EMPIRE CORP03/03/2023
DOB NOWSprinklersSigned-offS & J INDUSTRIAL CORP01/13/2023
DOB NOWSupported ScaffoldSigned-offMANHATTAN D ENTERPRISES10/03/2022
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES09/12/2022
DOB NOWConstruction FenceSigned-offBB EMPIRE CORP08/03/2022
DOB NOWSupported ScaffoldSigned-offMANHATTAN D ENTERPRISES10/19/2021
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES09/14/2021
DOB NOWConstruction FenceSigned-offBB EMPIRE CORP08/18/2021
DOB NOWConstruction FenceSigned-offBB EMPIRE CORP05/13/2021
BIS—ISSUEDBB EMPIRE CORP01/29/2024
BIS—ISSUEDBB EMPIRE CORP08/18/2023
BISPLISSUEDP.H. WORKS INC07/06/2023
BIS—ISSUEDBB EMPIRE CORP08/03/2022
BIS—ISSUEDBB EMPIRE CORP08/03/2022
BISPLISSUEDP.H. WORKS INC07/11/2022
BIS—ISSUEDBB EMPIRE CORP08/12/2021
BIS—ISSUEDBB EMPIRE CORP08/12/2021
BIS—ISSUEDBB EMPIRE CORP06/08/2021
BIS—ISSUEDBB EMPIRE CORP06/04/2021
BISCCISSUEDSANDO BUILDING CONTRACTOR09/28/2012
BIS—ISSUEDMRM DEVELOPMENT CORP03/14/2012
BISEQISSUEDMRM DEVELOPMENT CORP03/14/2012
BISEQISSUEDMRM DEVELOPMENT CORP11/04/2011
BIS—ISSUEDMRM DEVELOPMENT CORP11/04/2011
BISPLISSUEDFERNANDEZ HTG & MECH CORP.08/04/2011
BISEQISSUEDMRM DEVELOPMENT CORP03/02/2011
BIS—ISSUEDMRM DEVELOPMENT CORP03/02/2011
BIS—ISSUEDMRM DEVELOPMENT CORP03/02/2011
BIS—ISSUEDKANDOS CONSTRUCTION OF NY11/17/2010
BIS—ISSUEDKANDOS CONSTRUCTION OF NY11/17/2010
BISEQISSUEDKANDOS CONSTRUCTION OF NY11/17/2010
4 projects · most recent 09/20/2025
General Wiring
FiledStatusContractorScope
09/20/2025CompleteRICHARD NEU—
01/06/2025CompleteSOLAS ELECTRICAL CORP—
01/24/2024CompleteTRUE POWER ELECL CONT LLCGeneral Wiring
06/02/2021CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
01/17/2024Pass-Final SP - Up to 9 Requested FloorsPassView ↗
01/04/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
03/15/2024HVAC and service water heating equipment Paul Raymondenergy_progress
03/15/2024Maintenance informationPaul Raymondenergy_progress
03/15/2024Mechanical SystemsPaul Raymondspecial
03/15/2024FinalPaul Raymondprogress
03/15/2024HVAC insulation and sealing Paul Raymondenergy_progress
03/15/2024Shutoff dampersPaul Raymondenergy_progress
03/15/2024HVAC and service water heating system controls Paul Raymondenergy_progress
02/22/2024FinalPaul Raymondprogress
02/22/2024Maintenance informationPaul Raymondenergy_progress
02/22/2024Mechanical SystemsPaul Raymondspecial
02/22/2024HVAC and service water heating system controls Paul Raymondenergy_progress
02/22/2024HVAC and service water heating equipment Paul Raymondenergy_progress
02/22/2024HVAC insulation and sealing Paul Raymondenergy_progress
02/22/2024Shutoff dampersPaul Raymondenergy_progress
12/19/2023Fire-Resistant Penetrations and JointsPaul Raymondspecial
12/19/2023Sprinkler SystemsPaul Raymondspecial
11/27/2023Fire-Resistant Penetrations and JointsPaul Raymondspecial
11/27/2023Sprinkler SystemsPaul Raymondspecial
11/08/2021FinalPaul Raymondprogress
11/08/2021Post-installed AnchorsPaul Raymondspecial
11/08/2021MasonryPaul Raymondspecial
11/08/2021Structural Steel - WeldingPaul Raymondspecial
11/08/2021Structural Steel - DetailsPaul Raymondspecial
11/08/2021Structural Cold-Formed SteelPaul Raymondspecial
11/08/2021Concrete - Cast-In-PlacePaul Raymondspecial
Latest 25 of 33.
▾Documents — 332 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch5
09/01/2026B00591537-I1Request digital key ↗
09/01/2026B00610583-I1Request digital key ↗
09/01/2026B00610583-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/02/2026B00194121-I1Request digital key ↗
08/14/2026B00194121-P3Request digital key ↗
08/14/2026B00194121-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
09/02/2026B00194121-P2Request digital key ↗
09/02/2026B00194121-S1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
09/01/2026B00197719-I1Request digital key ↗
08/15/2026B00197719-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00215276-I1Request digital key ↗
▸Applications & Permits61
▸BISPLAN / WORK APPROVAL APPLICATION47
05/16/2024321779063Open ↗
05/07/2024321779063Open ↗
04/19/2024321779063Open ↗
Showing 3 of 47 on file for this type
▸BISWORK PERMIT APPLICATION9
08/23/2023321779063Open ↗
07/11/2022321779063Open ↗
06/09/2021321779063Open ↗
Showing 3 of 9 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
08/23/2012320124156Open ↗
Showing 1 of 3 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
01/09/2024321779063Open ↗
07/05/2012320020482Open ↗
▸Zoning, Tax Lot & Property Records10
▸BISZONING DIAGRAM3
08/23/2021321779063Open ↗
01/27/2021321779063Open ↗
04/22/2020321779063Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION3
06/04/2020321779063Open ↗
04/22/2020321779063Open ↗
Showing 2 of 3 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
06/04/2020321779063Open ↗
04/22/2020321779063Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
12/13/2023321779063Open ↗
04/22/2020321779063Open ↗
▸Seals & Professional Certifications54
▸DOB NOWSpecial Inspector Seal & Signature13
08/31/2026B00194121-I1Open ↗
08/26/2026B00194121-P3Open ↗
08/25/2026B00197719-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
08/31/2026B00194121-I1Open ↗
08/31/2026B00194121-I1Open ↗
08/31/2026B00194121-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/01/2026B00591537-I1Open ↗
08/23/2026B01123632-I1Open ↗
08/23/2026B01160106-I1Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
06/07/2021321779063Open ↗
01/30/2019321779063Open ↗
10/22/2012320020482Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
10/03/2012320545353Open ↗
Showing 1 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
10/03/2012320545353Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment26
▸BISSCHEDULE B - PLUMBING13
12/27/2023321779063Open ↗
12/26/2023321779063Open ↗
12/20/2023321779063Open ↗
Showing 3 of 13 on file for this type
▸BISSEWER CONNECTION: DEP SD1 & SD24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
06/07/2019321779063Open ↗
06/04/2019321779063Open ↗
01/30/2019321779063Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
07/10/2012320020482Open ↗
04/30/2012320020482Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0212
07/10/2012320020482Open ↗
04/26/2012320020482Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
01/18/2024321779063Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
01/18/2024321779063Open ↗
▸Safety & Tenant Protection8
▸BISSTREET TREE CHECKLIST8
02/10/2021321955595Open ↗
06/24/2020321779063Open ↗
04/22/2020321779063Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/13/2026B00194121-I1Open ↗
08/13/2026B00194121-P2Open ↗
08/13/2026B00194121-S1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
10/03/2012320545353Open ↗
Showing 1 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
06/04/2020321779063Open ↗
01/30/2019321779063Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
04/22/2020321779063Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
01/30/2019321779063Open ↗
10/03/2012320545353Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
06/24/2020321779063Open ↗
04/22/2020321779063Open ↗
▸BISINTERIOR LIGHTING POWER1
01/18/2024321779063Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
01/18/2024321779063Open ↗
▸BISFENESTRATION AREAS1
01/18/2024321779063Open ↗
▸BISFENESTRATION AIR LEAKAGE1
01/18/2024321779063Open ↗
▸Inspections & Test Reports24
▸BISTECHNICAL REPORT: RESPONSIBILITY6
10/29/2020321779063Open ↗
06/24/2020321779063Open ↗
06/24/2020321779063Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER5
05/21/2024321779063Open ↗
06/07/2021321779063Open ↗
10/22/2012320020482Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX4
06/07/2021321779063Open ↗
06/07/2021321779063Open ↗
Showing 2 of 4 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION3
10/29/2020321779063Open ↗
06/24/2020321779063Open ↗
04/22/2020321779063Open ↗
▸BISSOIL REPORT2
01/27/2021321779063Open ↗
04/22/2020321779063Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/18/2024321779063Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
01/18/2024321779063Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
01/18/2024321779063Open ↗
▸BISMASONRY1
01/18/2024321779063Open ↗
▸Approvals, Objections & Sign-offs34
▸BISSCHEDULE A - OCCUPANCY / USE15
05/07/2024321779063Open ↗
02/01/2024321779063Open ↗
11/05/2020321779063Open ↗
Showing 3 of 15 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
04/23/2024321779063Open ↗
04/23/2024321779063Open ↗
11/10/2021321779063Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
10/03/2012320545353Open ↗
Showing 1 of 5 on file for this type
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL3
02/10/2021321955595Open ↗
06/24/2020321779063Open ↗
04/22/2020321779063Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
11/09/2012320020482Open ↗
11/05/2012320545353Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
07/10/2012320020482Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT6
11/10/2020321779063Open ↗
06/24/2020321779063Open ↗
04/22/2020321779063Open ↗
Showing 3 of 6 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE2
08/23/2023321779063Open ↗
06/07/2021321779063Open ↗
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
08/28/2012320124156Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
03/13/2024321779063Open ↗
▸Filing & Intake Forms24
▸BISADDITIONAL INFORMATION12
04/23/2024321779063Open ↗
04/17/2024321779063Open ↗
04/05/2024321779063Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING COVER SHEET8
04/01/2020321779063Open ↗
11/08/2019321955595Open ↗
01/30/2019321779063Open ↗
Showing 3 of 8 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT34
02/10/2021321955595Open ↗
10/31/2019321955595Open ↗
08/28/2012320124156Open ↗
Showing 3 of 4 on file for this type
▸Other Documents11
▸BISPLOT DIAGRAM4
06/24/2020321779063Open ↗
04/22/2020321779063Open ↗
Showing 2 of 4 on file for this type
▸DOB NOWStructural Peer Review Report2
08/13/2026B00197719-P1Open ↗
08/13/2026B00197719-I1Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
11/05/2020321779063Open ↗
▸BISPRELIMINARY1
01/18/2024321779063Open ↗
▸BISSEISMIC ISOLATION SYSTEMS1
01/18/2024321779063Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1