← Back
BuildNYC
Shopping center, with or without parking
Island Condominium
645 ROSSVILLE AVENUE · BIN 5079745
💬 Discuss this project
1983Year Built
1Stories
K6Building Class
R3XZoning
18,717 sfGross Floor Area
9Units
0 Active ViolationsFDNY Report ↗
Shopping center, with or without parking · Owner of record: Woodrow Village · 87,520 sf lot · 0.21 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 53 filings
Floor 43 filings
Floor 33 filings
Floor 23 filings
Floor 15 filings
Sub-Basement1 filing
Site & exterior9 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Woodrow Plaza5003/21/2026
Pina Development1007/08/2026
All Saints Animal Hospital603/21/2026
RHC Development603/21/2026
Dish307/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KMB Design Group109/03/2024
HC Engineering312/01/2023
Leon Skvirsky PE310/19/2023
A Saxon Design Group104/04/2023
The MTM Design Group102/08/2021
M B Kim Architect P C101/11/2021
Albert Montoya Architect202/24/2020
Jose L. Pena, P.E103/31/2019
Norman C. Lok, PE203/12/2018
Jung H. Choi, Architect111/03/2017
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Louis Striar603/21/2026
Construction Permit Services303/21/2026
CSMR Designs203/21/2026
Building Brothers603/21/2026
JP Expedite603/21/2026
Youn Design203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A1 SpecializedSign hanger307/08/2026
Neptune Signs & AwningsSign hanger307/08/2026
Signs CadSign hanger307/08/2026
L.e.c.incGeneral Contractor203/21/2026
TristruxGeneral Contractor203/21/2026
Active SignsSign hanger207/08/2026
Ace Electrical ConstructionElectrical203/21/2026
City SignsSign hanger107/08/2026
Mack Signs & AwningsSign hanger107/08/2026
Wasoff Plumbing & Utility CoPlumbing107/08/2026
Capitol Awning Cospecialty_contractor107/08/2026
J.A. Lee Electricspecialty_contractor107/08/2026
A.M.A. HoldingsSign hanger107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KMB Design Group513109/03/2024
R Marsac Consulting329104/04/2023
M B Kim Architect P C4257101/11/2021
Building Lifecycle
04/21/2026
Boiler inspection report filed
Initial · no defects · Accepted
04/01/2026
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
S00460702-I1-GC
12/05/2025
Permit renewed — General Construction
Renewed with changes
S00460702-I1-GC
11/03/2025
Boiler inspection report filed
Initial · no defects · Accepted
04/23/2025
Boiler inspection report filed
Initial · no defects · Accepted
91 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Tristrux—
DOB NOW—Mic General Contracting—
DOB NOW—Signs Cad—
DOB NOW—Signs Cad—
DOB NOW—Signs Cad—
DOB NOW—Active Signs—
DOB NOW—Active Signs—
DOB NOW—Capitol Awning Co—
DOB NOW—A.M.A. Holdings—
DOB NOW—L.e.c.inc—
DOB NOW—Wasoff Plumbing & Utility Co—
DOB NOW—Mack Signs & Awnings—
DOB NOW—Neptune Signs & Awnings—
DOB NOW—Elmer Dawson—
DOB NOW—Mad Signs—
DOB NOW—Neptune Signs & Awnings—
DOB NOW—Mad Signs—
DOB NOW—Mad Signs—
DOB NOW—Neptune Signs & Awnings—
BIS—D.C.F. Contracting—
BIS—JB Buzco Plumbing—
BIS—D.R. Contracting—
BIS—JB Buzco Plumbing—
BIS—D.R. Contracting—
BIS—Cool Runnings—
BIS—Mad Signs—
BIS—J. and F. Refrigeration, *—
BIS—William Hird & Co—
BIS—Mad Signs—
BIS—Mad Signs—
BIS—Neptune Signs & Awnings—
BIS—Neptune Signs & Awnings—
BIS—Neptune Signs & Awnings—
BIS—Capital Contracting P&H—
BIS—Five Borough NYC—
BIS—Mad Signs—
BIS—Lemazia Construction—
BIS—Cello Builders—
BIS—Mad Signs—
BIS—Cello Builders—
+ 29 more permits on file
Nothing on file for this building.
Nothing on file for this building.
560 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account