← Back
BuildNYC
Training school
645 ST NICHOLAS AVENUE
MANHATTAN · BIN 1061014
💬 Discuss this project
1977Year Built
3Stories
W4Building Class
R7AZoning
16,210 sfGross Floor Area
2Units
0 Active Violations
Training school · Owner of record: Harlem School of Arts · 14,290 sf lot · 1.13 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbingFire ProtectionEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 313p · 1 filing · 20 docs
Floor 213p · 1 filing · 20 docs
Floor 1Harlem School of the Arts the Herb Alpert Center24p · 2 filings · 20 docs
Site & exteriorHarlem School of the Arts the Herb Alpert Center12p · 3 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Harlem School of Arts3903/22/2026
NYC Department of Design and Construction403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Eric K. Daniels Architect508/23/2023
Odc Associates207/14/2023
KZ Engineering208/15/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sol Building Consulting Services303/21/2026
Greenman Pedersen403/21/2026
Synergy Building Consultants203/21/2026
Yona Love Consulting Services203/21/2026
March Associates203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Ceprine ConstructionScaffold407/08/2026
Service Sign Erectors CoSign hanger207/08/2026
Nationwide MechanicalPlumbing203/22/2026
Allstate Electrical ContElectrical103/22/2026
Nationwide MechanicalFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Universal Testing and Ins400207/14/2023
Building Lifecycle
All (76)Filed (9)Permit Issued (5)Signed Off (4)Violation (3)Inspection (3)Objection (44)Special Inspection (8)
05/13/2025
Signed off — Alteration
Install one new sprinkler head at the elevator hoistway connected to the existing wet sprinkler system.
M00828777-I1
09/22/2023
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
08/31/2023
Special inspection requirement — Public Assembly Emergency Lighting
MARCH CHADWICK
08/23/2023
Filed — No Work
M00322690-P4
07/14/2023
Filed — Alteration
Install one new sprinkler head at the elevator hoistway connected to the existing wet sprinkler system.
M00828777-P1
07/05/2023
Special inspection requirement — Public Assembly Emergency Lighting
MARCH CHADWICK
06/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
06/05/2023
Special inspection requirement — Sprinkler Systems
NELSON LOPEZ
05/03/2023
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
04/26/2023
Inspection — No Access-Final SP - Up to 3 Requested Floors
No Access
View inspection ↗
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/20/2023
Permit issued — Sprinklers
M00828777-I1-EW-SP
03/13/2023
Filed — Alteration
Install one new sprinkler head at the elevator hoistway connected to the existing wet sprinkler system.
M00828777-I1
09/08/2022
Objection resolved — Addressed
06/28/2022
Objection resolved — Addressed
06/28/2022
Objection resolved — Addressed
06/28/2022
Objection resolved — Addressed
06/24/2022
Objection raised — Other
06/24/2022
Objection raised — Other
06/24/2022
Objection raised — Other
06/23/2022
Objection raised — Other
06/21/2022
Filed — No Work
M00322690-P3
05/19/2022
Special inspection requirement — Public Assembly Emergency Lighting
MARCH CHADWICK
04/08/2022
Filed — No Work
M00322690-P2
03/23/2022
Special inspection requirement — Public Assembly Emergency Lighting
MARCH CHADWICK
03/19/2021
Signed off — Alteration
sign
M00353414-I1
03/05/2021
Permit issued — Sign
M00353414-I1-SG
01/20/2021
Permit issued — Sign
M00353414-I1-SG
09/18/2020
Objection raised — Other
09/18/2020
Objection resolved — Addressed
07/15/2020
Signed off — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00210474-I1
07/15/2020
Signed off — Alteration
M00210483-I1
06/30/2020
Objection raised — Other
06/30/2020
Objection resolved — Addressed
06/30/2020
Objection raised — Other
06/30/2020
Objection resolved — Addressed
06/30/2020
Objection raised — Other
06/30/2020
Objection resolved — Addressed
06/29/2020
Filed — Alteration
sign
M00353414-I1
06/24/2020
Special inspection requirement — Exterior lighting power
MARCH CHADWICK
03/04/2020
Objection raised — Fire_Protection
03/04/2020
Objection resolved — Addressed
03/04/2020
Objection raised — Inspections
03/04/2020
Objection resolved — Addressed
03/04/2020
Objection raised — Inspections
03/04/2020
Objection resolved — Addressed
03/04/2020
Objection raised — Other
03/04/2020
Objection resolved — Addressed
03/04/2020
Objection raised — Admin
03/04/2020
Objection resolved — Addressed
03/04/2020
Objection raised — Mechanical
03/04/2020
Objection resolved — Addressed
03/04/2020
Objection raised — Fire_Protection
03/04/2020
Objection resolved — Addressed
03/04/2020
Objection raised — Admin
03/04/2020
Objection resolved — Addressed
03/04/2020
Objection raised — Structural
03/04/2020
Objection resolved — Addressed
03/04/2020
Objection raised — Structural
03/04/2020
Objection resolved — Addressed
Latest 60 of 76 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offNationwide Mechanical04/20/2023
DOB NOWSignSigned-offService Sign Erectors Co03/05/2021
DOB NOWSignSigned-offService Sign Erectors Co01/20/2021
DOB NOWSidewalk ShedSigned-offCeprine Construction08/15/2019
DOB NOWConstruction FenceSigned-offCeprine Construction08/15/2019
BIS—ISSUEDArchstone Builders06/09/2023
BIS—ISSUEDArchstone Builders11/16/2022
BIS—ISSUEDArchstone Builders08/03/2022
BIS—ISSUEDArchstone Builders02/28/2022
BISPLISSUEDNationwide Mechanical08/18/2021
BISOTISSUEDArchstone Builders04/28/2021
BISMHISSUEDArchstone Builders04/28/2021
BISOTISSUEDArchstone Builders04/28/2021
BISPLISSUEDLCS Plumbing & Consulting11/06/2020
BISOTISSUEDArchstone Builders10/14/2020
BISMHISSUEDArchstone Builders12/19/2019
BISSPISSUEDHeads Up Fire Sprinkler11/13/2019
BISOTISSUEDA. Aleem Construction05/09/2018
BISMHISSUEDA. Aleem Construction05/09/2018
BISOTISSUEDA. Aleem Construction05/09/2018
BISOTISSUEDA. Aleem Construction05/09/2018
BISPLISSUEDCopper Services10/05/2017
BISBLISSUEDCopper Services10/05/2017
BISMHISSUEDA. Aleem Construction05/02/2017
BISOTISSUEDA. Aleem Construction05/02/2017
BISOTISSUEDA. Aleem Construction05/02/2017
BISOTISSUEDA. Aleem Construction04/27/2017
BISOTISSUEDA. Aleem Construction01/27/2017
BISOTISSUEDA. Aleem Construction01/27/2017
BISOTISSUEDA. Aleem Construction01/27/2017
BISOTISSUEDA. Aleem Construction01/26/2017
BISOTISSUEDA. Aleem Construction01/26/2017
BISOTISSUEDA. Aleem Construction01/26/2017
BISOTISSUEDA. Aleem Construction11/01/2016
BISOTISSUEDA. Aleem Construction09/16/2016
BISOTRE-ISSUEDA. Aleem Construction09/16/2016
BISMHISSUEDA. Aleem Construction09/16/2016
BIS—ISSUEDFive Town Neon Sign Co03/26/2013
BISEQISSUEDBilly Contractors12/24/2009
BISEQISSUEDBilly Contractors12/23/2009
+ 15 more permits on file
3 projects · most recent 05/27/2021
General Wiring
FiledStatusContractorScope
05/27/2021CompleteAllstate Electrical ContGeneral Wiring
10/28/2019CompleteAllstate Electrical Cont—
08/20/2019CompleteBorowide Elect'l Contractors—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/22/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
05/03/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
04/26/2023No Access-Final SP - Up to 3 Requested FloorsNo AccessView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
08/31/2023Public Assembly Emergency LightingMARCH CHADWICKprogress
07/05/2023Public Assembly Emergency LightingMARCH CHADWICKprogress
06/05/2023Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
06/05/2023Sprinkler SystemsNELSON LOPEZspecial
05/19/2022Public Assembly Emergency LightingMARCH CHADWICKprogress
03/23/2022Public Assembly Emergency LightingMARCH CHADWICKprogress
06/24/2020Exterior lighting powerMARCH CHADWICKenergy_progress
08/14/2019FinalKarol Zdancewiczprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Harlem School of the Arts the Herb Alpert CenterEducationFloor 1
Project M00353414 Alteration · LOC Issued · 06/29/2020
Project M00828777 Alteration · LOC Issued · 03/13/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 380 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch - Place of Assembly4
09/05/2026M00322690-P2Request digital key ↗
09/05/2026M00322690-P4Request digital key ↗
08/15/2026M00322690-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch2
08/31/2026M00828777-P1Request digital key ↗
08/31/2026M00828777-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
08/15/2026M00353414-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/05/2026M00210483-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00210474-I1Request digital key ↗
▸Applications & Permits96
▸BISPLAN / WORK APPROVAL APPLICATION62
07/30/2025110357462Open ↗
07/25/2025110357462Open ↗
04/15/2025102188972Open ↗
Showing 3 of 62 on file for this type
▸BISWORK PERMIT APPLICATION30
08/04/2022121208638Open ↗
02/28/2022121208638Open ↗
08/19/2021122216039Open ↗
Showing 3 of 30 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
08/06/2025110357462Open ↗
08/06/2025110357462Open ↗
04/11/2025102188972Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
01/17/2023121208638Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
06/02/2021121208638Open ↗
▸BISZONING DIAGRAM1
06/23/2021121208638Open ↗
▸Seals & Professional Certifications42
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/05/2026M00210483-I1Open ↗
09/04/2026M00353414-I1Open ↗
08/31/2026M00828777-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
10/07/2026M00322690-P2Open ↗
08/31/2026M00322690-P3Open ↗
08/28/2026M00353414-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/31/2026M00828777-P1Open ↗
08/31/2026M00828777-P1Open ↗
▸Trade Schedules & Equipment15
▸BISSCHEDULE B - PLUMBING6
04/11/2025122216039Open ↗
04/18/2022122216039Open ↗
09/10/2021123510227Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
02/19/2020123510227Open ↗
Showing 1 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
09/16/2025122216039Open ↗
▸BISEQUIPMENT USE PERMITS1
02/26/2024122216039Open ↗
▸BISSPRINKLER SYSTEMS1
12/05/2022121208638Open ↗
▸BISHEATING SYSTEMS1
09/16/2025122216039Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST3
02/28/2022121208638Open ↗
06/02/2021121208638Open ↗
Showing 2 of 3 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
02/28/2022121208638Open ↗
▸Environmental & Asbestos10
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
04/23/2024122217706Open ↗
06/02/2021121208638Open ↗
Showing 2 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
04/23/2024122217706Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
06/10/2024122216039Open ↗
08/25/2023121208638Open ↗
01/18/2022123510227Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
09/16/2025122216039Open ↗
11/17/2022121208638Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
09/16/2025122216039Open ↗
12/05/2022121208638Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
12/05/2022121208638Open ↗
▸BISFENESTRATION AREAS1
12/05/2022121208638Open ↗
▸BIS* HVAC INSULATION AND SEALING1
09/16/2025122216039Open ↗
▸BISFENESTRATION AIR LEAKAGE1
12/05/2022121208638Open ↗
▸BISEXTERIOR LIGHTING POWER1
12/05/2022121208638Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/15/2026M00353414-I1Open ↗
▸Inspections & Test Reports36
▸BISTECHNICAL REPORT: RESPONSIBILITY17
07/30/2025110357462Open ↗
07/25/2025110357462Open ↗
04/25/2025102188972Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCONCRETE - CAST-IN-PLACE3
02/21/2025122216039Open ↗
01/05/2023121208638Open ↗
01/05/2023121208638Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS2
02/21/2025122216039Open ↗
12/05/2022121208638Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
02/21/2025122216039Open ↗
11/17/2022121208638Open ↗
▸BISMASONRY2
02/21/2025122216039Open ↗
11/17/2022121208638Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING2
02/21/2025122216039Open ↗
12/05/2022121208638Open ↗
▸BISSTRUCTURAL STEEL - WELDING2
02/21/2025122216039Open ↗
11/17/2022121208638Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
12/05/2022121208638Open ↗
▸BISPOST-INSTALLED ANCHORS1
12/05/2022121208638Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
12/05/2022121208638Open ↗
▸Approvals, Objections & Sign-offs32
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
09/17/2025122216039Open ↗
08/12/2025110357462Open ↗
04/23/2024122217706Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE8
08/22/2024121208638Open ↗
05/28/2021121208638Open ↗
03/29/2021121208638Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/15/2026M00353414-I1Open ↗
08/13/2026M00828777-P1Open ↗
08/13/2026M00828777-I1Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSUPERSEDING LETTER2
08/19/2021122216039Open ↗
07/13/2021122216039Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFINAL1
09/16/2025122216039Open ↗
▸Cost, Insurance & Ownership24
▸BISCOST AFFIDAVIT18
02/06/2024104916888Open ↗
01/25/2024104916888Open ↗
01/18/2022123510227Open ↗
Showing 3 of 18 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
09/16/2025122216039Open ↗
06/15/2023121836629Open ↗
05/15/2023122217706Open ↗
Showing 3 of 4 on file for this type
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEPT OF FINANCE VERIFICATION1
08/04/2022121208638Open ↗
▸Filing & Intake Forms56
▸BISADDITIONAL INFORMATION31
09/12/2025122216039Open ↗
09/12/2025122216039Open ↗
09/05/2025122216039Open ↗
Showing 3 of 31 on file for this type
▸BISEFILING COVER SHEET15
08/26/2020121208638Open ↗
Showing 1 of 15 on file for this type
▸BISBOROUGH INTAKE FORM10
08/04/2022121208638Open ↗
08/19/2021122216039Open ↗
02/19/2020123510227Open ↗
Showing 3 of 10 on file for this type
▸Other Documents25
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION12
09/17/2025122216039Open ↗
09/12/2025122216039Open ↗
09/12/2025122216039Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWAlternate Plan 63
09/05/2026M00322690-P4Open ↗
08/15/2026M00322690-P3Open ↗
08/14/2026M00322690-I1Open ↗
▸DOB NOWAlternate Plan 53
09/05/2026M00322690-P4Open ↗
08/15/2026M00322690-P3Open ↗
08/14/2026M00322690-I1Open ↗
▸DOB NOWAlternate Plan 43
09/05/2026M00322690-P4Open ↗
08/15/2026M00322690-P3Open ↗
08/14/2026M00322690-I1Open ↗
▸BISPLOT DIAGRAM2
05/22/2020123859770Open ↗
Showing 1 of 2 on file for this type
▸BISVESTIBULES1
12/05/2022121208638Open ↗
▸BISMAINTENANCE INFORMATION1
09/16/2025122216039Open ↗