← Back
Primarily 1 family with 1 store or office
646 FOREST AVENUE
STATEN ISLAND · BIN 5007683
💬 Discuss this project
1930Year Built
2Stories
S1Building Class
R3XZoning
1,838 sfGross Floor Area
2Units
7 Open Violations ▸FDNY Report ↗
Primarily 1 family with 1 store or office · Owner of record: 646 FOREST AVE REALTY LLC · 1,712 sf lot · 1.07 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 12p · 2 filings · 20 docs
Cellar6p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HKS CONSTRUCTION407/08/2026
AVC GENERAL CONTRACTING LLC3103/22/2026
DASH BROS REALTY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KC EXPEDITING1203/21/2026
PATRICIA L. GASS1003/21/2026
DAWN KANTOR ENTERPRISES403/21/2026
HAIDER ENGINEERING, P.E.103/21/2026
HAIDER ENGINEERING P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AVC GENERAL CONTRACTING LGeneral Contractor603/21/2026
CHARLES J. DEHART JR P&HPlumbing507/08/2026
DRILON PLBG & HTG INCPlumbing207/08/2026
HKS CONSTRUCTION CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOYUN KIM; RA7415609/20/2022
VALENTINO POMPEO ARCHITEC1013202/16/2021
Building Lifecycle
All (81)Filed (16)Permit Issued (10)Signed Off (6)Violation (15)Inspection (4)Special Inspection (30)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/11/2024
Violation issued (FDNY_ORDER, closed)
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/01/2023
Violation issued (FDNY_ORDER, closed)
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/23/2023
Signed off — Alteration
APPLICATION FILED TO INSTALL (1) NEW GREASE TRAP AT CELLAR AND NEW 3 COMPARTMENT SINK, 1 HAND WASH SINK, 3 GAS DEEP FRYERS, 1 GAS GRIDDLE, AND 1 GAS STEAMER AT FIRST FLOOR.
S00693168-I1
12/19/2022
Filed — Alteration
APPLICATION FILED TO INSTALL (1) NEW GREASE TRAP AT CELLAR AND NEW 3 COMPARTMENT SINK, 1 HAND WASH SINK, 3 GAS DEEP FRYERS, 1 GAS GRIDDLE, AND 1 GAS STEAMER AT FIRST FLOOR.
S00693168-P4
11/30/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/08/2022
Filed — Alteration
APPLICATION FILED TO INSTALL (1) NEW GREASE TRAP AT CELLAR AND NEW 3 COMPARTMENT SINK, 1 HAND WASH SINK, 3 GAS DEEP FRYERS, 1 GAS GRIDDLE, AND 1 GAS STEAMER AT FIRST FLOOR.
S00693168-P3
10/19/2022
Signed off — Alteration
APP FILED HEREWITH TO INSTALL A 4 TON SPLIT SYSTEM UNIT W 2 AIR HANDLERS & PARTIAL DUCT WORK AT FIRST FLOOR OF EXISTING COMMERCIAL SPACE. INSTALL A NEW KITCHEN HOOD EXHAUST FAN & ASSOCIATED DUCT WORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY
S00721683-I1
09/28/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/23/2022
Filed — Alteration
APPLICATION FILED TO INSTALL (1) NEW GREASE TRAP AT CELLAR AND NEW 3 COMPARTMENT SINK, 1 HAND WASH SINK, 3 GAS DEEP FRYERS, 1 GAS GRIDDLE, AND 1 GAS STEAMER AT FIRST FLOOR.
S00693168-P2
09/20/2022
Filed — Alteration
APP FILED HEREWITH TO INSTALL A 4 TON SPLIT SYSTEM UNIT W 2 AIR HANDLERS & PARTIAL DUCT WORK AT FIRST FLOOR OF EXISTING COMMERCIAL SPACE. INSTALL A NEW KITCHEN HOOD EXHAUST FAN & ASSOCIATED DUCT WORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY
S00721683-P3
09/20/2022
Signed off — Alteration
APPLICATION FILED HEREWITH FOR TOTAL INTERIOR RENOVATION OF EXISTING FIRST FLOOR COMMERCIAL SPACE.
S00693127-I1
09/16/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/13/2022
Permit issued — Plumbing
S00693168-I1-PL
09/08/2022
Filed — Alteration
APPLICATION FILED TO INSTALL (1) NEW GREASE TRAP AT CELLAR AND NEW 3 COMPARTMENT SINK, 1 HAND WASH SINK, 3 GAS DEEP FRYERS, 1 GAS GRIDDLE, AND 1 GAS STEAMER AT FIRST FLOOR.
S00693168-P1
06/03/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/31/2022
Permit issued — Mechanical Systems
S00721683-I1-MS
05/31/2022
Permit issued — General Construction
S00693127-I1-GC
05/11/2022
Filed — Alteration
APP FILED HEREWITH TO INSTALL A 4 TON SPLIT SYSTEM UNIT W 2 AIR HANDLERS & PARTIAL DUCT WORK AT FIRST FLOOR OF EXISTING COMMERCIAL SPACE. INSTALL A NEW KITCHEN HOOD EXHAUST FAN & ASSOCIATED DUCT WORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY
S00721683-P2
05/04/2022
Special inspection requirement — Lighting controls
DOYUN KIM
05/04/2022
Special inspection requirement — Exterior lighting power
DOYUN KIM
05/04/2022
Special inspection requirement — Interior lighting power
DOYUN KIM
05/04/2022
Special inspection requirement — Energy Code Compliance Inspections
DOYUN KIM
05/04/2022
Special inspection requirement — Fire-Resistance Rated Construction
DOYUN KIM
05/04/2022
Special inspection requirement — Final
DOYUN KIM
05/04/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
DOYUN KIM
05/03/2022
Filed — Alteration
APPLICATION FILED HEREWITH FOR TOTAL INTERIOR RENOVATION OF EXISTING FIRST FLOOR COMMERCIAL SPACE.
S00693127-P1
05/03/2022
Filed — Alteration
APP FILED HEREWITH TO INSTALL A 4 TON SPLIT SYSTEM UNIT W 2 AIR HANDLERS & PARTIAL DUCT WORK AT FIRST FLOOR OF EXISTING COMMERCIAL SPACE. INSTALL A NEW KITCHEN HOOD EXHAUST FAN & ASSOCIATED DUCT WORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY
S00721683-P1
05/02/2022
Special inspection requirement — HVAC-R and service water heating equipment
DOYUN KIM
05/02/2022
Special inspection requirement — Duct leakage testing, insulation and design
DOYUN KIM
05/02/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
DOYUN KIM
05/02/2022
Special inspection requirement — Mechanical Systems
DOYUN KIM
05/02/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
DOYUN KIM
05/02/2022
Special inspection requirement — Final
DOYUN KIM
05/02/2022
Special inspection requirement — Energy Code Compliance Inspections
DOYUN KIM
05/02/2022
Special inspection requirement — Fire-Resistance Rated Construction
DOYUN KIM
05/02/2022
Special inspection requirement — HVAC-R and service water heating system controls
DOYUN KIM
05/02/2022
Special inspection requirement — Shutoff dampers
DOYUN KIM
05/02/2022
Special inspection requirement — Final
DOYUN KIM
05/02/2022
Special inspection requirement — Energy Code Compliance Inspections
DOYUN KIM
05/02/2022
Special inspection requirement — Fire-Resistance Rated Construction
DOYUN KIM
05/02/2022
Special inspection requirement — Interior lighting power
DOYUN KIM
05/02/2022
Special inspection requirement — Lighting controls
DOYUN KIM
05/02/2022
Special inspection requirement — Exterior lighting power
DOYUN KIM
05/02/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
DOYUN KIM
04/19/2022
Filed — Alteration
APP FILED HEREWITH TO INSTALL A 4 TON SPLIT SYSTEM UNIT W 2 AIR HANDLERS & PARTIAL DUCT WORK AT FIRST FLOOR OF EXISTING COMMERCIAL SPACE. INSTALL A NEW KITCHEN HOOD EXHAUST FAN & ASSOCIATED DUCT WORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY
S00721683-I1
04/07/2022
Permit issued — Plumbing
S00693168-I1-PL
03/24/2022
Filed — Alteration
APPLICATION FILED TO INSTALL (1) NEW GREASE TRAP AT CELLAR AND NEW 3 COMPARTMENT SINK, 1 HAND WASH SINK, 3 GAS DEEP FRYERS, 1 GAS GRIDDLE, AND 1 GAS STEAMER AT FIRST FLOOR.
S00693168-I1
03/24/2022
Filed — Alteration
APPLICATION FILED HEREWITH FOR TOTAL INTERIOR RENOVATION OF EXISTING FIRST FLOOR COMMERCIAL SPACE.
S00693127-I1
09/02/2021
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
S00153004-I1
07/15/2021
Signed off — Alteration
APPLICATION FILED TO REPLACE EXISTING OIL BOILER WITH NEW GAS BOILER AND TO INSTALL NEW HOT WATER HEATER AT CELLAR. ALL WORK IS AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, BULK, OCCUPANCY OR EGRESS.
S00263191-I1
07/15/2021
Signed off — Alteration
APPLICATION FILED TO INSTALL NEW GAS PIPING FOR NEW GAS FIXTURES AT CELLAR FILED UNDER DOB NOW APPLICATION #S00263191. ALL WORK IS AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, BULK, OCCUPANCY OR EGRESS.
S00293105-I1
05/26/2021
Permit issued — Plumbing
S00293105-I1-PL
02/16/2021
Filed — Alteration
APPLICATION FILED TO REPLACE EXISTING OIL BOILER WITH NEW GAS BOILER AND TO INSTALL NEW HOT WATER HEATER AT CELLAR. ALL WORK IS AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, BULK, OCCUPANCY OR EGRESS.
S00263191-P1
Latest 60 of 81 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDRILON PLBG & HTG INC09/13/2022
DOB NOWMechanical SystemsSigned-offAVC GENERAL CONTRACTING L05/31/2022
DOB NOWGeneral ConstructionSigned-offAVC GENERAL CONTRACTING L05/31/2022
DOB NOWPlumbingSigned-offDRILON PLBG & HTG INC04/07/2022
DOB NOWPlumbingSigned-offCHARLES J. DEHART JR P&H05/26/2021
DOB NOWBoiler EquipmentSigned-offCHARLES J. DEHART JR P&H08/24/2020
DOB NOWPlumbingSigned-offCHARLES J. DEHART JR P&H02/26/2020
DOB NOWPlumbingSigned-offCHARLES J. DEHART JR P&H01/16/2020
DOB NOWBoiler EquipmentSigned-offCHARLES J. DEHART JR P&H11/21/2019
DOB NOWSidewalk ShedSigned-offHKS CONSTRUCTION CORP04/11/2019
BISPLISSUEDABLE PLBG CO RICHMOND INC11/20/2018
BIS—ISSUED3584 CONSTRUCTION CORP04/27/2018
BISOTISSUEDBENNY'S MASONRY INC11/01/2002
3 projects · most recent 07/20/2022
General Wiring
FiledStatusContractorScope
07/20/2022Permit IssuedASCUATECH ELECTRICAL CORPGeneral Wiring
01/19/2022CompleteMAXIMUM ELECTRIC CORP.General Wiring
04/10/2019CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
11/30/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/28/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/16/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/03/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
05/04/2022Lighting controlsDOYUN KIMenergy_progress
05/04/2022Exterior lighting powerDOYUN KIMenergy_progress
05/04/2022Interior lighting powerDOYUN KIMenergy_progress
05/04/2022Energy Code Compliance InspectionsDOYUN KIMprogress
05/04/2022Fire-Resistance Rated ConstructionDOYUN KIMprogress
05/04/2022FinalDOYUN KIMprogress
05/04/2022Fire-Resistant Penetrations and JointsDOYUN KIMspecial
05/02/2022HVAC-R and service water heating equipmentDOYUN KIMenergy_progress
05/02/2022Duct leakage testing, insulation and designDOYUN KIMenergy_progress
05/02/2022HVAC-R and service water piping design and insulationDOYUN KIMenergy_progress
05/02/2022Mechanical SystemsDOYUN KIMspecial
05/02/2022Fire-Resistant Penetrations and JointsDOYUN KIMspecial
05/02/2022FinalDOYUN KIMprogress
05/02/2022Energy Code Compliance InspectionsDOYUN KIMprogress
05/02/2022Fire-Resistance Rated ConstructionDOYUN KIMprogress
05/02/2022HVAC-R and service water heating system controlsDOYUN KIMenergy_progress
05/02/2022Shutoff dampersDOYUN KIMenergy_progress
05/02/2022FinalDOYUN KIMprogress
05/02/2022Energy Code Compliance InspectionsDOYUN KIMprogress
05/02/2022Fire-Resistance Rated ConstructionDOYUN KIMprogress
05/02/2022Interior lighting powerDOYUN KIMenergy_progress
05/02/2022Lighting controlsDOYUN KIMenergy_progress
05/02/2022Exterior lighting powerDOYUN KIMenergy_progress
05/02/2022Fire-Resistant Penetrations and JointsDOYUN KIMspecial
02/16/2021Maintenance informationVALENTINO POMPEOenergy_progress
Latest 25 of 30.
▾Documents — 123 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch11
08/24/2026S00693168-P1Request digital key ↗
08/24/2026S00693168-P4Request digital key ↗
08/24/2026S00693168-P3Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
08/26/2026S00293105-I1Request digital key ↗
08/15/2026S00293105-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment2
08/25/2026S00263191-I1Request digital key ↗
08/15/2026S00263191-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026S00153004-I1Request digital key ↗
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION6
08/11/2021520308006Open ↗
09/25/2019520308006Open ↗
07/16/2019540159433Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION3
08/29/2019540159433Open ↗
11/21/2018520308006Open ↗
04/28/2018520308006Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
06/12/2018520308006Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISZONING EXHIBIT I: CERTIFICATION1
12/29/2017520308006Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
12/29/2017520308006Open ↗
▸BISVERIFY TAX LOT1
08/13/2021520308006Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
08/13/2021520308006Open ↗
▸BISZONING DIAGRAM1
02/23/2018520308006Open ↗
▸Seals & Professional Certifications33
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/26/2026S00293105-I1Open ↗
08/26/2026S00293105-P1Open ↗
08/25/2026S00263191-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026S00263191-I1Open ↗
09/23/2026S00263191-I1Open ↗
09/23/2026S00263191-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
11/01/2019540159433Open ↗
11/01/2019540159433Open ↗
04/28/2018520308006Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/23/2026S00263191-I1Open ↗
09/23/2026S00263191-I1Open ↗
08/23/2026S00693127-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
01/30/2019540159433Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
09/25/2019520308006Open ↗
09/26/2018520308006Open ↗
08/01/2017520308006Open ↗
▸Safety & Tenant Protection5
▸DOB NOWTenant Protection Plan4
08/25/2026S00263191-I1Open ↗
08/13/2026S00263191-P1Open ↗
08/13/2026S00293105-P1Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST1
02/23/2018520308006Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/26/2026S00293105-I1Open ↗
08/26/2026S00293105-P1Open ↗
08/25/2026S00263191-I1Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/01/2017520308006Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
11/01/2019540159433Open ↗
04/28/2018520308006Open ↗
02/23/2018520308006Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
08/13/2021520308006Open ↗
07/19/2019540159433Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026S00721683-I1Open ↗
08/13/2026S00693127-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/13/2021520308006Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
08/13/2021520308006Open ↗
07/19/2019540159433Open ↗
07/19/2019540159433Open ↗
▸Approvals, Objections & Sign-offs8
▸BISSCHEDULE A - OCCUPANCY / USE3
10/02/2019520308006Open ↗
09/25/2019520308006Open ↗
02/21/2018520308006Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION3
07/15/2019540159433Open ↗
07/15/2019540159433Open ↗
03/05/2018520308006Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
08/01/2017520308006Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/01/2019540159433Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
11/01/2019540159433Open ↗
07/19/2019540159433Open ↗
08/01/2017520308006Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
08/13/2021520308006Open ↗
▸Filing & Intake Forms11
▸BISADDITIONAL INFORMATION5
10/02/2019520308006Open ↗
07/24/2019540159433Open ↗
07/24/2019540159433Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM4
11/01/2019540159433Open ↗
09/25/2019520308006Open ↗
09/26/2018520308006Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
01/30/2019540159433Open ↗
▸BISEFILING COVER SHEET1
08/01/2017520308006Open ↗
▸Other Documents4
▸BISPLOT DIAGRAM2
02/23/2018520308006Open ↗
08/01/2017520308006Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
01/14/2019520308006Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026S00153004-I1Open ↗