← Back
BuildNYC
Multi-story retail building (2+)
647 5TH AVENUE
MANHATTAN · BIN 1035480
💬 Discuss this project
1905Year Built
6Stories
K2Building Class
C5-3Zoning
22,570 sfGross Floor Area
1Units
0 Active Violations
Multi-story retail building (2+) · Owner of record: Olympicgold · 3,750 sf lot · 6.02 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSKIMS, Eden Gallery60p · 3 filings · 20 docs
Floor 6SKIMS, Eden Gallery92p · 4 filings · 20 docs
Floor 5SKIMS84p · 4 filings · 20 docs
Floor 4SKIMS86p · 4 filings · 20 docs
Floor 3SKIMS86p · 4 filings · 20 docs
Floor 2SKIMS85p · 4 filings · 20 docs
Floor 1SKIMS86p · 4 filings · 20 docs
MezzanineSKIMS, Eden Gallery95p · 4 filings · 20 docs
CellarSKIMS, Eden Gallery92p · 4 filings · 20 docs
Sub-CellarSKIMS, Eden Gallery70p · 3 filings · 20 docs
Site & exteriorTemporary custom color sidewalk shed installation10p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Olympic Towers Associates1903/22/2026
Crown Acquisitions703/21/2026
Oxford Properties Group603/21/2026
Safeway Atlantic403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Fiskaa Engineering510/22/2025
Retail Design Collaborative402/11/2025
Gilsanz Murray Steficek202/11/2025
Tohfaz Uddin PE309/18/2024
Stone107/22/2024
MPS Engineering106/12/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Burnham Nationwide2403/21/2026
AE Design Solution603/21/2026
Soh Par Sprinkler203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Schimenti Construction CoGeneral Contractor507/08/2026
Lawrence J. LevineFire Protection403/21/2026
Spring ScaffoldingScaffold407/08/2026
Par Plumbing CoPlumbing207/08/2026
Soh Par SprinklerFire Protection207/08/2026
Stanco System Electrical ContElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ryan Special Engineering20181110/22/2025
Vibranalysis Inc., Dba VT6864202/11/2025
Building Lifecycle
All (112)Filed (16)Permit Issued (11)Signed Off (9)Violation (39)Inspection (7)Special Inspection (30)
11/06/2025
Signed off — Alteration
Modifications to the existing Sprinkler system as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.
M01041520-S2
11/06/2025
Signed off — Alteration
Modifications to the existing Sprinkler system as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.
M01041520-S1
10/31/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/23/2025
Special inspection requirement — Final
William Ryan
10/23/2025
Special inspection requirement — Mechanical Systems
William Ryan
10/22/2025
Filed — Alteration
Modifications to the existing Sprinkler system as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.
M01041520-P4
10/22/2025
Special inspection requirement — Sprinkler Systems
William Ryan
10/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
10/22/2025
Special inspection requirement — Post-installed Anchors
William Ryan
10/21/2025
Filed — Alteration
Modifications to the existing Sprinkler system as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.
M01041520-P1
07/08/2025
Special inspection requirement — Sprinkler Systems
William Ryan
07/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
07/08/2025
Special inspection requirement — Post-installed Anchors
William Ryan
05/05/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/13/2025
Signed off — Alteration
Modifications to the existing Sprinkler system as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.
M01041520-I1
02/13/2025
Special inspection requirement — Structural Steel - Details
JUAN GOMEZ
02/13/2025
Special inspection requirement — Sprayed fire-resistant materials
William Ryan
02/13/2025
Special inspection requirement — Final
William Ryan
02/13/2025
Special inspection requirement — Concrete - Cast-In-Place
William Ryan
02/13/2025
Special inspection requirement — Post-installed Anchors
William Ryan
02/13/2025
Special inspection requirement — Structural Steel - Welding
JUAN GOMEZ
02/13/2025
Special inspection requirement — Structural Steel - High Strength Bolting
William Ryan
02/11/2025
Filed — Alteration
Modifications to the existing Sprinkler system as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.
M01041520-P2
02/11/2025
Filed — Alteration
Modifications to the existing Sprinkler system as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.
M01041520-P3
01/30/2025
Signed off — Alteration
Facade repairs and roof replacement as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.
M01064677-I1
12/23/2024
Signed off — Alteration
Cap & Remove Plumbing fixtures as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.
M01021686-S1
12/19/2024
Special inspection requirement — Sprayed fire-resistant materials
William Ryan
12/19/2024
Special inspection requirement — Structural Steel - Details
JUAN GOMEZ
12/19/2024
Special inspection requirement — Structural Steel - High Strength Bolting
William Ryan
12/19/2024
Special inspection requirement — Structural Steel - Welding
JUAN GOMEZ
12/19/2024
Special inspection requirement — Final
William Ryan
12/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
12/19/2024
Special inspection requirement — Final
William Ryan
12/19/2024
Special inspection requirement — Concrete - Cast-In-Place
William Ryan
12/19/2024
Special inspection requirement — Post-installed Anchors
William Ryan
12/16/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/12/2024
Signed off — Alteration
M01112531-I1
12/12/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY CUSTOM COLOR SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01112521-I1
11/25/2024
Signed off — Alteration
Cap & Remove Plumbing fixtures as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.
M01021686-I1
10/10/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SPRINKLER LOOP. NO CHANGE TO USE, EGRESS AND/OR OCCUPANCY
M01050593-I1
09/18/2024
Filed — Alteration
INSTALLATION OF TEMPORARY CUSTOM COLOR SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01112521-P1
09/17/2024
Filed — Alteration
M01112531-I1
09/17/2024
Filed — Alteration
INSTALLATION OF TEMPORARY CUSTOM COLOR SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01112521-I1
09/17/2024
Permit issued — Supported Scaffold
M01112531-I1-SF
09/17/2024
Permit issued — Sidewalk Shed
M01112521-I1-SH
09/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/01/2024
Permit issued — Structural
M01041520-S4-ST
07/26/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/24/2024
Permit issued — General Construction
M01064677-I1-GC
07/22/2024
Filed — Alteration
Facade repairs and roof replacement as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.
M01064677-I1
07/22/2024
Filed — Alteration
Modifications to the existing Sprinkler system as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.
M01041520-S4
07/22/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/22/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/21/2024
Permit issued — Sprinklers
M01041520-S3-EW-SP
06/21/2024
Permit issued — Plumbing
M01041520-S2-PL
06/12/2024
Filed — Alteration
INSTALLATION OF TEMPORARY SPRINKLER LOOP. NO CHANGE TO USE, EGRESS AND/OR OCCUPANCY
M01050593-I1
06/12/2024
Permit issued — Sprinklers
M01050593-I1-EW-SP
06/11/2024
Special inspection requirement — Mechanical Systems
William Ryan
06/11/2024
Special inspection requirement — Final
William Ryan
05/15/2024
Permit issued — Mechanical Systems
M01041520-S1-MS
Latest 60 of 112 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding09/17/2024
DOB NOWSidewalk ShedSigned-offSpring Scaffolding09/17/2024
DOB NOWStructuralSigned-offSchimenti Construction Co08/01/2024
DOB NOWGeneral ConstructionSigned-offSchimenti Construction Co07/24/2024
DOB NOWSprinklersSigned-offSoh Par Sprinkler06/21/2024
DOB NOWPlumbingSigned-offPar Plumbing Co06/21/2024
DOB NOWSprinklersSigned-offSoh Par Sprinkler06/12/2024
DOB NOWMechanical SystemsSigned-offSchimenti Construction Co05/15/2024
DOB NOWGeneral ConstructionSigned-offSchimenti Construction Co05/08/2024
DOB NOWPlumbingSigned-offPar Plumbing Co04/11/2024
DOB NOWGeneral ConstructionSigned-offSchimenti Construction Co03/26/2024
BISOTISSUEDTeel Construction01/17/2020
BISEQISSUEDYork Scaffold Equipment09/17/2018
BISOTISSUEDPullman SST07/20/2018
BISOTISSUEDPullman SST07/03/2018
BISOTISSUEDPullman SST07/03/2018
BISOTISSUEDPullman SST03/28/2018
BISOTISSUEDPullman SST01/16/2018
BISOTISSUEDPullman SST01/16/2018
BISEQISSUEDYork Scaffold Equipment09/27/2017
BISEQISSUEDSafway Atlantic09/08/2017
BISEQISSUEDSafway Atlantic09/07/2017
BISEQISSUEDSafway Atlantic09/07/2017
BISEQISSUEDAll-Safe09/12/2016
BISEQISSUEDAll-Safe09/08/2016
BISEQISSUEDAll-Safe09/08/2016
BISEQISSUEDAll-Safe09/22/2015
BISEQISSUEDAll-Safe09/22/2015
BISEQISSUEDAll-Safe09/22/2015
BISEQISSUEDYork Scaffold Equipment04/16/2015
BISEQISSUEDYork Scaffold Equipment04/16/2015
BISEQISSUEDYork Scaffold Equipment04/16/2015
BISMHISSUEDIndustrial Cooling TCH07/29/2013
BISOTISSUEDWonder Works Construction01/13/2009
BISOTISSUEDArgento Construction02/11/2008
BISMHISSUEDP.J. Mechanical09/22/1998
BISOTISSUEDUniversal Steeplejack08/22/1997
BISOTISSUEDAccord Construction Co04/04/1996
BISOTISSUEDAccord Construction Co04/04/1996
BISMHISSUEDAccord Construction Co04/04/1996
+ 14 more permits on file
1 project · most recent 10/22/2025
FiledStatusContractorScope
10/22/2025Signed-offSoh Par Sprinkler—
1 project · most recent 10/22/2025
Water/Sanitary
FiledStatusContractorScope
10/22/2025Signed-offPar Plumbing CoWater/Sanitary
2 projects · most recent 09/04/2024
General Wiring
FiledStatusContractorScope
09/04/2024CompleteTop Shelf Electric—
07/17/2024CompleteC.M. Richey Electrical ContractingGeneral Wiring
1 project · most recent 10/22/2025
Steel Concrete
FiledStatusContractorScope
10/22/2025Signed-offSchimenti Construction CoSteel, Concrete
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
10/31/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/05/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/16/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/06/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/26/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/22/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/22/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
10/23/2025FinalWilliam Ryanprogress
10/23/2025Mechanical SystemsWilliam Ryanspecial
10/22/2025Sprinkler SystemsWilliam Ryanspecial
10/22/2025Fire-Resistant Penetrations and JointsWilliam Ryanspecial
10/22/2025Post-installed AnchorsWilliam Ryanspecial
07/08/2025Sprinkler SystemsWilliam Ryanspecial
07/08/2025Fire-Resistant Penetrations and JointsWilliam Ryanspecial
07/08/2025Post-installed AnchorsWilliam Ryanspecial
02/13/2025Structural Steel - DetailsJUAN GOMEZspecial
02/13/2025Sprayed fire-resistant materialsWilliam Ryanspecial
02/13/2025FinalWilliam Ryanprogress
02/13/2025Concrete - Cast-In-PlaceWilliam Ryanspecial
02/13/2025Post-installed AnchorsWilliam Ryanspecial
02/13/2025Structural Steel - WeldingJUAN GOMEZspecial
02/13/2025Structural Steel - High Strength BoltingWilliam Ryanspecial
12/19/2024Sprayed fire-resistant materialsWilliam Ryanspecial
12/19/2024Structural Steel - DetailsJUAN GOMEZspecial
12/19/2024Structural Steel - High Strength BoltingWilliam Ryanspecial
12/19/2024Structural Steel - WeldingJUAN GOMEZspecial
12/19/2024FinalWilliam Ryanprogress
12/19/2024Fire-Resistant Penetrations and JointsWilliam Ryanspecial
12/19/2024FinalWilliam Ryanprogress
12/19/2024Concrete - Cast-In-PlaceWilliam Ryanspecial
12/19/2024Post-installed AnchorsWilliam Ryanspecial
06/11/2024Mechanical SystemsWilliam Ryanspecial
Latest 25 of 31.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Eden GalleryRetailSub-cellar, Cellar, Floor 6, Mezzanine, Roof
Project M01064677 Alteration · LOC Issued · 07/22/2024
SKIMSRetailSub-cellar, Cellar, Floors 1–6, Mezzanine, Roof
Project M01050593 Alteration · LOC Issued · 06/12/2024
Project M01041520 Alteration · Permit Entire · 05/06/2024
Project M01021686 Alteration · LOC Issued · 03/20/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 323 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/27/2026M01021686-I1Request digital key ↗
08/27/2026M01021686-S1Request digital key ↗
08/27/2026M01041520-P4Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits66
▸BISPLAN / WORK APPROVAL APPLICATION32
11/20/2019123809227Open ↗
11/18/2019123266786Open ↗
07/30/2019123809227Open ↗
Showing 3 of 32 on file for this type
▸BISWORK PERMIT APPLICATION24
01/17/2020123809227Open ↗
09/17/2018140699803Open ↗
07/24/2018140751522Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWLPC Approval/Permit10
08/13/2026M01041520-P3Open ↗
08/13/2026M01064677-I1Open ↗
08/13/2026M01041520-I1Open ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications114
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION40
11/18/2019123266786Open ↗
11/18/2019123266786Open ↗
11/18/2019123266786Open ↗
Showing 3 of 40 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT17
05/21/2019122482483Open ↗
05/21/2019122510531Open ↗
05/21/2019122490580Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/27/2026M01021686-S1Open ↗
08/27/2026M01021686-I1Open ↗
08/27/2026M01041520-P4Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/23/2026M01041520-P2Open ↗
09/23/2026M01041520-P2Open ↗
09/23/2026M01041520-P2Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST13
05/21/2019122482483Open ↗
05/21/2019122510531Open ↗
12/20/2017123266786Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026M01041520-P2Open ↗
09/01/2026M01041520-S1Open ↗
09/01/2026M01041520-P1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
03/27/2018140751522Open ↗
09/26/2017140699803Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
03/27/2018140751522Open ↗
09/26/2017140699803Open ↗
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
02/17/2016122474786Open ↗
01/28/2016122474802Open ↗
01/11/2016122474777Open ↗
▸BISEQUIPMENT USE PERMITS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE B - PLUMBING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection4
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
11/20/2019123809227Open ↗
01/11/2016122474777Open ↗
▸BISTenant Protection Plan and Notes2
07/30/2019123809227Open ↗
03/27/2018140751522Open ↗
▸Environmental & Asbestos25
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/27/2026M01021686-I1Open ↗
08/27/2026M01021686-S1Open ↗
08/27/2026M01041520-S2Open ↗
Showing 3 of 13 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
11/20/2019123809227Open ↗
12/20/2017123266786Open ↗
09/26/2017140699803Open ↗
Showing 3 of 9 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
07/30/2019123809227Open ↗
02/17/2016122474786Open ↗
01/28/2016122474802Open ↗
Showing 3 of 5 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE1
12/20/2017123266786Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/27/2018140751522Open ↗
09/26/2017140699803Open ↗
▸Approvals, Objections & Sign-offs33
▸BISLANDMARKS APPROVAL11
11/21/2019123809227Open ↗
11/18/2019123266786Open ↗
03/27/2018140751522Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
11/18/2019123266786Open ↗
05/28/2019122482483Open ↗
05/28/2019122490580Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
12/26/2019123809227Open ↗
12/26/2019123809227Open ↗
11/21/2019123809227Open ↗
Showing 3 of 7 on file for this type
▸BISSUPERSEDING LETTER3
09/13/2017122490580Open ↗
09/12/2017122482483Open ↗
09/11/2017122510531Open ↗
▸BISADMINISTRATIVE OBJECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT13
11/18/2019123266786Open ↗
07/30/2019123809227Open ↗
03/27/2018140751522Open ↗
Showing 3 of 13 on file for this type
▸Filing & Intake Forms35
▸BISEFILING COVER SHEET20
07/30/2019123809227Open ↗
12/20/2017123266786Open ↗
12/20/2017123266786Open ↗
Showing 3 of 20 on file for this type
▸BISBOROUGH INTAKE FORM8
11/18/2019123266786Open ↗
05/28/2019122482483Open ↗
05/28/2019122490580Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION5
01/16/2020123809227Open ↗
11/21/2019123809227Open ↗
03/27/2018140751522Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
03/27/2018140751522Open ↗
09/26/2017140699803Open ↗
▸Other Documents4
▸DOB NOWProof of Historic Building4
08/13/2026M01064677-I1Open ↗
08/13/2026M01041520-P3Open ↗
08/13/2026M01021686-I1Open ↗
Showing 3 of 4 on file for this type