← Back
Church, synagogue, chapel
649 AMSTERDAM AVENUE
MANHATTAN · Upper West Side (Central) · BIN 1032512
💬 Discuss this project
1916Year Built
4Stories
M1Building Class
C2-8Zoning
23,000 sfGross Floor Area
1Units
39 Open Violations 34 unresolved · 5 paperwork only ▸
Church, synagogue, chapel · Owner of record: CENTRAL BAPTIST CHURCH · 10,700 sf lot · 2.15 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof1p · 1 filing · 6 docs
Cellar2p · 2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CENTRAL BAPTIST CHURCH2207/08/2026
CONTRAL BAPT CHURCH203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAZINI ENGINEERING, P.C.102/27/2023
PS ENGINEERS, INC.104/02/2022
FL&M ENGINEERING DESIGN &INSPECTION101/07/2022
MVN ARCHITECT LLC110/06/2021
SCHERER DESIGN GROUP109/11/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PS ENGINEERS203/21/2026
GREEN STUDIO203/21/2026
SOMMA DESIGN CONSULTING203/21/2026
CONSTRUCTION PERMIT SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LCS RESTORATION CORPGeneral Contractor1407/08/2026
WKR CONSTRUCTION, INCGeneral Contractor603/21/2026
BIRNBAUM, ALANElectrical103/21/2026
RICHARD NEUElectrical103/21/2026
TOUGH STALLION LLCElectrical103/21/2026
E.T. VANDERBECK INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LEO Y LEE ASSOCIATES2481110/06/2021
Building Lifecycle
All (86)Filed (5)Permit Issued (11)Signed Off (5)Violation (57)Inspection (1)Special Inspection (7)
03/30/2026
Signed off — Alteration
M08024254-I1
12/15/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Signed off — Alteration
INSTALLATION OF 300psf SIDEWALK SHED, OVERHEAD PROTECTION AND PIPE SCAFFOLDING AS PER PLANS,ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE CODE 2014, NO CHANGES IN USE, EGRESS AND OCCUPANCY UNDER THIS APPLICATION.
M00655567-I1
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/24/2023
Signed off — Alteration
M00607150-I1
03/20/2023
Signed off — Alteration
M00703209-I1
03/14/2023
Permit issued — Supported Scaffold
M00655567-I1-SH
03/14/2023
Permit issued — Sidewalk Shed
M00655567-I1-SF
03/03/2023
Permit issued — Boiler Equipment
M08024254-I1-BE
02/27/2023
Filed — Alteration
M08024254-I1
11/04/2022
Special inspection requirement — Maintenance information
Joseph Bazini
11/04/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Joseph Bazini
11/01/2022
Permit issued — Structural
M00607150-I1-GC-CX
04/19/2022
Permit issued — Construction Fence
M00703209-I1-FN
04/04/2022
Permit issued — Construction Fence
M00703209-I1-FN
04/02/2022
Filed — Alteration
M00703209-I1
03/25/2022
Permit issued — Sidewalk Shed
M00655567-I1-SF
03/25/2022
Permit issued — Sidewalk Shed
M00655567-I1-SH
01/07/2022
Filed — Alteration
INSTALLATION OF 300psf SIDEWALK SHED, OVERHEAD PROTECTION AND PIPE SCAFFOLDING AS PER PLANS,ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE CODE 2014, NO CHANGES IN USE, EGRESS AND OCCUPANCY UNDER THIS APPLICATION.
M00655567-I1
01/07/2022
Permit issued — Supported Scaffold
M00655567-I1-SF
01/07/2022
Permit issued — Supported Scaffold
M00655567-I1-SH
10/06/2021
Filed — Alteration
M00607150-I1
10/06/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Leo Lee
10/06/2021
Special inspection requirement — Masonry
Leo Lee
10/06/2021
Special inspection requirement — Post-installed Anchors
Leo Lee
10/06/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Leo Lee
10/06/2021
Special inspection requirement — Final
Michael Notaro
08/13/2021
Violation issued (ECB, open)
Boilers
02/17/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/04/2021
Violation issued (ECB, closed)
Construction
11/19/2020
Violation issued (ECB, closed)
Construction
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/20/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/30/2019
Signed off — Alteration
The removal of an existing Verizon equipment room and all accompanying equipment in the cellar. Removal of existing Verizon antennas and associated mounting hardware on the roof. Previously approved under DOB application # 122137491. All in conformance with TPPN 5/98. No change in use, egress, or occupancy.
M00041516-I1
04/05/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/03/2019
Permit issued — Antenna
M00041516-I1-AN
09/11/2018
Filed — Alteration
The removal of an existing Verizon equipment room and all accompanying equipment in the cellar. Removal of existing Verizon antennas and associated mounting hardware on the roof. Previously approved under DOB application # 122137491. All in conformance with TPPN 5/98. No change in use, egress, or occupancy.
M00041516-I1
09/15/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/08/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/03/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/11/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/19/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/26/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/13/2011
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/13/2011
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/27/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/05/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/14/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offLCS RESTORATION CORP03/14/2023
DOB NOWSidewalk ShedSigned-offLCS RESTORATION CORP03/14/2023
DOB NOWBoiler EquipmentSigned-offFOUR SUNS FUEL OIL CO INC03/03/2023
DOB NOWStructuralSigned-offWKR CONSTRUCTION, INC11/01/2022
DOB NOWConstruction FenceSigned-offWKR CONSTRUCTION, INC04/19/2022
DOB NOWConstruction FenceSigned-offWKR CONSTRUCTION, INC04/04/2022
DOB NOWSidewalk ShedSigned-offLCS RESTORATION CORP03/25/2022
DOB NOWSidewalk ShedSigned-offLCS RESTORATION CORP03/25/2022
DOB NOWSupported ScaffoldSigned-offLCS RESTORATION CORP01/07/2022
DOB NOWSupported ScaffoldSigned-offLCS RESTORATION CORP01/07/2022
DOB NOWAntennaSigned-offE.T. VANDERBECK INC01/03/2019
BISOTISSUEDJ.T. ORONZIO GENERAL CONT02/03/2015
BISOTISSUEDODYSSIA GLOBAL COMM. CORP12/24/2014
BISPLISSUEDALAFIGIANNIS PLBG AND HTG INC11/22/2002
BISEQISSUEDCOLGATE SCAFFOLDING EQUIP CORP10/23/2002
2 projects · most recent 07/06/2023
FiledStatusContractorScope
07/06/2023CompleteRICHARD NEU—
01/05/2022CompleteWCK ELECTRIC CORP.—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
12/15/2025Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
11/04/2022Maintenance informationJoseph Bazinienergy_progress
11/04/2022HVAC-R and service water piping design and insulationJoseph Bazinienergy_progress
10/06/2021Fire-Resistant Penetrations and JointsLeo Leespecial
10/06/2021MasonryLeo Leespecial
10/06/2021Post-installed AnchorsLeo Leespecial
10/06/2021Structural Stability – Alterations of existing buildingsLeo Leespecial
10/06/2021FinalMichael Notaroprogress
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/06/2026M00041516-I1Request digital key ↗
09/03/2026M00607150-I1Request digital key ↗
09/03/2026M00655567-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
02/06/2015122137491Open ↗
12/31/2014122137491Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
09/23/2014122137491Open ↗
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/03/2026M00655567-I1Open ↗
09/02/2026M00703209-I1Open ↗
08/31/2026M08024254-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
07/22/2015122137491Open ↗
09/23/2014122137491Open ↗
09/23/2014122137491Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026M00607150-I1Open ↗
09/01/2026M08024254-I1Open ↗
09/01/2026M08024254-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026M00607150-I1Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/23/2014122137491Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M00607150-I1Open ↗
▸Energy Compliance3
▸BISAS-BUILT ENERGY ANALYSIS1
07/22/2015122137491Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/22/2015122137491Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M08024254-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/13/2026M08024254-I1Open ↗
08/13/2026M00607150-I1Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/22/2015122137491Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
07/22/2015122137491Open ↗
09/23/2014122137491Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
09/23/2014122137491Open ↗