← Back
BuildNYC
Over six families without stores
649 BRADFORD STREET
BROOKLYN · BIN 3096742
💬 Discuss this project
1930Year Built
3Stories
C1Building Class
R6Zoning
3,836 sfGross Floor Area
8Units
Rent Stabilized4 Active Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: 649 BSD · 2,625 sf lot · 1.46 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofDemolition and concrete block wall2p · 1 filing · 20 docs
Floor 2Demolition and concrete block wall20p · 1 filing · 20 docs
Floor 1Demolition and concrete block wall23p · 1 filing · 20 docs
BasementDemolition and concrete block wall24p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
649 BSD103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/10/2024$885K—Private party → 649 BSD LLC$231/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AG Engineering504/21/2025
Vasilios Artemiou PE112/03/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMG Group USA603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Revamp NYCGeneral Contractor307/08/2026
AmokFire Protection107/08/2026
AmokPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616504/21/2025
Shahrish Shuvo Engineering8524111/14/2024
Building Lifecycle
09/21/2025
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM WEST…
HPD violation · open
09/21/2025
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
HPD violation · open
09/21/2025
§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT CELLER AT BOILER ROOM, 1st STORY
HPD violation · open
09/18/2025
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
B01115931-I1-GC
06/06/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
81 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedRevamp NYC02/27/2025
DOB NOWStructuralPermit IssuedRevamp NYC01/16/2025
DOB NOWMechanical SystemsSigned-offRevamp NYC01/16/2025
DOB NOWSprinklersSigned-offAmok01/15/2025
DOB NOWPlumbingSigned-offAmok01/15/2025
1 project · most recent 04/21/2025
Water/Sanitary
FiledStatusContractorScope
04/21/2025Signed-offAmokWater/Sanitary
1 project · most recent 01/12/2025
General Wiring
FiledStatusContractorScope
01/12/2025CompleteFirst Quality ElectricalGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
04/02/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/27/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/25/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/05/2025Fail-Final CND-Occupancy InspectionFailView ↗
03/03/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/23/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
04/25/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
04/25/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
04/25/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
04/25/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/25/2025Fenestration air leakageFAHAD FATEHenergy_progress
04/25/2025Maintenance informationFAHAD FATEHenergy_progress
04/25/2025Air barrier — testing FAHAD FATEHenergy_progress
04/25/2025Interior lighting powerFAHAD FATEHenergy_progress
04/25/2025Electric vehicle service equipment requirementsFAHAD FATEHenergy_progress
04/25/2025Permanent certificateFAHAD FATEHenergy_progress
04/25/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
04/25/2025Fenestration areasFAHAD FATEHenergy_progress
04/25/2025MeteringFAHAD FATEHenergy_progress
04/25/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
04/25/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
04/21/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
04/21/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/21/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
04/21/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
04/21/2025Air barrier — testing FAHAD FATEHenergy_progress
04/21/2025Fenestration air leakageFAHAD FATEHenergy_progress
04/21/2025Fenestration areasFAHAD FATEHenergy_progress
04/21/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
04/21/2025Interior lighting powerFAHAD FATEHenergy_progress
04/21/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
Latest 25 of 48.
42 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account