← Back
Two stories - detached, small or mid-size
649 EAST 22 STREET
BROOKLYN · Flatbush · BIN 3120643
💬 Discuss this project
1910Year Built
2.5Stories
A1Building Class
R3XZoning
2,394 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 5,000 sf lot · 0.48 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralGeneral
Roof11p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR107/17/2024
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281107/17/2024
Building Lifecycle
All (7)Filed (1)Signed Off (1)Special Inspection (5)
06/18/2025
Signed off — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 20 Panels, 8.2 kW
B01079932-I1
07/17/2024
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 20 Panels, 8.2 kW
B01079932-I1
07/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
07/12/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
07/12/2024
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
07/12/2024
Special inspection requirement — Final
Mina Makar
07/12/2024
Special inspection requirement — Air barrier - visual inspection
Mina Makar
Nothing on file for this building.
1 project · most recent 07/17/2024
FiledStatusContractorScope
07/17/2024CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
07/12/2024Fire-Resistant Penetrations and JointsMina Makarspecial
07/12/2024Structural Stability – Alterations of existing buildingsMina Makarspecial
07/12/2024Energy Code Compliance InspectionsMina Makarprogress
07/12/2024FinalMina Makarprogress
07/12/2024Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/24/2026B01079932-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026B01079932-I1Open ↗
08/28/2026B01079932-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/24/2026B01079932-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026B01079932-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/24/2026B01079932-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01079932-I1Open ↗