← Back
Single or multiple dwelling with stores or offices
649 MYRTLE AVENUE
BROOKLYN · BIN 3334789
💬 Discuss this project
1940Year Built
2Stories
S9Building Class
R7AZoning
3,240 sfGross Floor Area
4Units
3 Open Violations ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: OFAH REALTY LLC · 3,230 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction15p · 2 filings · 20 docs
BulkheadUnder Construction5p · 1 filing · 20 docs
Floor 23Under Construction1p · 1 filing · 20 docs
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14Under Construction1p · 1 filing · 20 docs
Floor 13Under Construction1p · 1 filing · 20 docs
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8Under Construction3p · 1 filing · 20 docs
Floor 7Under Construction4p · 1 filing · 20 docs
Floor 6Under Construction3p · 1 filing · 20 docs
Floor 5Under Construction5p · 1 filing · 20 docs
Floor 4Under Construction3p · 1 filing · 20 docs
Floor 3Under Construction5p · 1 filing · 20 docs
Floor 2Under Construction7p · 2 filings · 20 docs
Floor 1Under Construction7p · 2 filings · 20 docs
CellarUnder Construction8p · 1 filing · 20 docs
1 job · most recent 05/27/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/27/2026Permit IssuedY&L INTERIOR LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin RXTA36AAVJU 36,000 BTU · Vrf Outdoor ×18
RXTA24AAVJU 24,000 BTU · Vrf Outdoor ×2
RXTA60AAVJU 60,000 BTU · Vrf Outdoor ×2
RZA18AAVJU 18,000 BTU · Heat Pump Outdoor ×1
Ventilation
Renewaire HE07RT 250 CFM · Erv ×1
1 job · most recent 05/27/2026
Sprinkler System
FiledStatusContractorScope
05/27/2026——Sprinkler System
1 job · most recent 05/27/2026
Storm Water/Sanitary
FiledStatusContractorScope
05/27/2026——Storm, Water/Sanitary
1 job · most recent 05/27/2026
Concrete
FiledStatusContractorScope
05/27/2026Permit IssuedY&L INTERIOR LLCConcrete
1 job · most recent 05/27/2026
Fence
FiledStatusContractorScope
05/27/2026Permit IssuedY&L INTERIOR LLCFence
Building Lifecycle
All (49)Filed (7)Permit Issued (1)Violation (4)Objection (7)Special Inspection (30)
08/18/2026
Permit issued — Construction Fence
B01339846-S1-FN
06/18/2026
Objection resolved — Resolved
06/08/2026
Objection raised — Other
05/27/2026
Filed — New Building
Mechanical work-type filed subsequent to NB GC application; job number: B01339846-I1.
B01339846-S6
05/21/2026
Filed — Full Demolition
Full demolition to a two story building
B01404545-I1
05/20/2026
Special inspection requirement — Structural Stability – Alterations of existing Buildings
04/29/2026
Filed — New Building
Mechanical work-type filed subsequent to NB GC application; job number: B01339846-I1.
B01339846-S1
04/26/2026
Objection raised — Other
04/26/2026
Objection resolved — Resolved
04/14/2026
Objection raised — Other
04/14/2026
Objection resolved — Addressed
03/27/2026
Filed — New Building
Mechanical work-type filed subsequent to NB GC application; job number: B01339846-I1.
B01339846-S2
03/25/2026
Filed — New Building
Mechanical work-type filed subsequent to NB GC application; job number: B01339846-I1.
B01339846-Z1
03/19/2026
Special inspection requirement — Footing and Foundation
03/19/2026
Special inspection requirement — Final
03/16/2026
Filed — New Building
Mechanical work-type filed subsequent to NB GC application; job number: B01339846-I1.
B01339846-S3
03/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/12/2026
Special inspection requirement — Shutoff dampers
03/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/12/2026
Special inspection requirement — Energy Code Compliance Inspections
03/12/2026
Special inspection requirement — Post-installed Anchors
03/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/12/2026
Special inspection requirement — Duct leakage testing, insulation and design
03/12/2026
Special inspection requirement — Maintenance information
03/09/2026
Special inspection requirement — Sprinkler Systems
03/09/2026
Special inspection requirement — Mechanical Systems
03/09/2026
Special inspection requirement — Final
03/09/2026
Special inspection requirement — Standpipe Systems
02/23/2026
Objection raised — Other
01/09/2026
Filed — New Building
Mechanical work-type filed subsequent to NB GC application; job number: B01339846-I1.
B01339846-I1
12/31/2025
Special inspection requirement — Interior lighting power
12/31/2025
Special inspection requirement — Protection of exposed foundation insulation
12/31/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
12/31/2025
Special inspection requirement — Vestibules
12/31/2025
Special inspection requirement — Electrical motors and elevators
12/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/31/2025
Special inspection requirement — Luminous Exit Path Markings
12/31/2025
Special inspection requirement — Energy Code Compliance Inspections
12/31/2025
Special inspection requirement — Fire-Resistance Rated Construction
12/31/2025
Special inspection requirement — Exterior lighting power
12/31/2025
Special inspection requirement — Fenestration areas
12/31/2025
Special inspection requirement — Lighting controls
12/31/2025
Special inspection requirement — Fenestration air leakage
12/31/2025
Special inspection requirement — Air barrier - visual inspection
04/28/1990
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/28/1990
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/28/1990
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/16/1989
Violation issued (FDNY_NOV, closed)
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OFAH REALTY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
R & O ENGINEERING205/27/2026
H & O ENGINEERING, DPC105/21/2026
S. WIEDER ARCHITECT P.C.204/29/2026
VASILIOS ARTEMIOU PE503/27/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Y&L INTERIOR LLCGeneral Contractor108/26/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedY&L INTERIOR LLC08/18/2026
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
05/20/2026Structural Stability – Alterations of existing Buildings—special
03/19/2026Footing and Foundation—progress
03/19/2026Final—progress
03/12/2026HVAC-R and service water piping design and insulation—energy_progress
03/12/2026HVAC-R and service water heating system controls—energy_progress
03/12/2026Shutoff dampers—energy_progress
03/12/2026Fire-Resistant Penetrations and Joints—special
03/12/2026Energy Code Compliance Inspections—progress
03/12/2026Post-installed Anchors—special
03/12/2026HVAC-R and service water heating equipment—energy_progress
03/12/2026Duct leakage testing, insulation and design—energy_progress
03/12/2026Maintenance information—energy_progress
03/09/2026Sprinkler Systems—special
03/09/2026Mechanical Systems—special
03/09/2026Final—progress
03/09/2026Standpipe Systems—special
12/31/2025Interior lighting power—energy_progress
12/31/2025Protection of exposed foundation insulation—energy_progress
12/31/2025Exterior Insulation and Finish Systems (EIFS)—special
12/31/2025Vestibules—energy_progress
12/31/2025Electrical motors and elevators—energy_progress
12/31/2025Fire-Resistant Penetrations and Joints—special
12/31/2025Luminous Exit Path Markings—special
12/31/2025Energy Code Compliance Inspections—progress
12/31/2025Fire-Resistance Rated Construction—progress
Latest 25 of 36.
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/17/2026B01339846-S1Contact architect ↗
08/17/2026B01339846-Z1Contact architect ↗
08/17/2026B01339846-S6Contact architect ↗
Showing 3 of 7 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
05/18/2021322095040Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/15/2026B01339846-I1Open ↗
08/13/2026B01339846-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B01339846-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026B01339846-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/17/2026B01339846-I1Open ↗
08/17/2026B01339846-S1Open ↗
08/17/2026B01339846-Z1Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
02/18/2026340923273Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/18/2026340923273Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B01339846-I1Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST1
02/18/2026340923273Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/15/2026B01339846-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026B01339846-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISLETTERS - SUPPORTING DOCUMENTATION1
02/18/2026340923273Open ↗
▸Filing & Intake Forms4
▸BISEFILING JOB APPLICATION COVER SHEET1
02/17/2026340923273Open ↗
▸BISBOROUGH INTAKE FORM1
05/18/2021322095040Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
02/17/2026340923273Open ↗
▸BISEFILING COVER SHEET1
05/18/2021322095040Open ↗
▸Other Documents6
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/15/2026B01339846-I1Open ↗
08/13/2026B01339846-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/16/2026B01404545-I1Open ↗
08/15/2026B01339846-I1Open ↗
▸DOB NOWStructure Photographs1
08/16/2026B01404545-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B01339846-I1Open ↗