← Back
Primarily 2 family with 1 store or office
65-05 FRESH POND ROAD
QUEENS · BIN 4087556
💬 Discuss this project
1931Year Built
3Stories
S2Building Class
R6BZoning
3,300 sfGross Floor Area
3Units
Rent Stabilized1 Open Violation ▸
Primarily 2 family with 1 store or office · Owner of record: 65-05 REALTY GROUP LLC · 1,862 sf lot · 1.77 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 32p · 1 filing · 5 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
65-05 REALTY GROUP LLC1003/22/2026
DELI103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SOUTHERN CONSULTING ENGINEERING PC201/27/2025
CL ENGINEERING P.C.204/27/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JARED ASSOCIATE CONSULTING403/21/2026
LAVB DESIGN CONSULTANTS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EAST ENDERS NYC INCGeneral Contractor303/21/2026
JOSEPH WEINSTEIN ELECTRICElectrical103/22/2026
BT'S PLUMBING AND HEATINGPlumbing107/08/2026
M & M PIPING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
S&S CONCRETE & SOIL TESTI1008201/27/2025
CL ENGINEERING P.C.6781204/27/2022
Building Lifecycle
All (29)Filed (4)Permit Issued (3)Signed Off (2)Violation (10)Inspection (3)Special Inspection (7)
08/03/2026
Signed off — Alteration
Installation of new (10) commercial cooking equipment as per the submitted drawing.
Q01088056-I1
02/13/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/27/2025
Filed — Alteration
Installation of new (10) commercial cooking equipment as per the submitted drawing.
Q01088056-P1
01/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
GLEN LANGER
01/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GLEN LANGER
12/06/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/01/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/22/2024
Permit issued — Plumbing
Q01088056-I1-PL
09/05/2024
Filed — Alteration
Installation of new (10) commercial cooking equipment as per the submitted drawing.
Q01088056-I1
08/17/2022
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING APARTMENT AT THIRD FLOOR NEW SHEETROCK, RE-LAMINATION OF WALLS, FINISH FLOORING, NEW INTERIOR DOORS, NEW TILES AND NEW PLUMBING FIXTURES ON EXIST ROUGHING.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00716021-I1
06/30/2022
Permit issued — Plumbing
Q00719544-I1-PL
05/05/2022
Permit issued — General Construction
Q00716021-I1-GC
04/27/2022
Filed — Alteration
INTERIOR RENOVATION OF EXISTING APARTMENT AT THIRD FLOOR NEW SHEETROCK, RE-LAMINATION OF WALLS, FINISH FLOORING, NEW INTERIOR DOORS, NEW TILES AND NEW PLUMBING FIXTURES ON EXIST ROUGHING.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00716021-I1
04/27/2022
Filed — Alteration
CAP AND REMOVE EXISTING PLUMBING FIXTURES, INSTALL NEW ELECTRIC RANGE & PLUMBING FIXTURES ONTO EXISTING ROUGHING AS PER PLANS FOR THIRD FLOOR APARTMENT
Q00719544-I1
04/21/2022
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
04/21/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
04/21/2022
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
04/21/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
04/10/2022
Special inspection requirement — Final
CHRISTIAN LOZADA
03/04/2022
Violation issued (HPD, closed)
A
03/04/2022
Violation issued (HPD, closed)
I
04/15/2021
Violation issued (HPD, closed)
A
11/21/2016
Violation issued (HPD, closed)
I
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/22/1993
Violation issued (DOB, closed)
VPW*-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-DISMISSED
01/09/1991
Violation issued (DOB, closed)
VPW*-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-DISMISSED
10/29/1990
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
06/28/1990
Violation issued (DOB, open)
VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
06/28/1990
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offM & M PIPING AND HEATING10/22/2024
DOB NOWPlumbingPermit IssuedBT'S PLUMBING AND HEATING06/30/2022
DOB NOWGeneral ConstructionSigned-offEAST ENDERS NYC INC05/05/2022
BISFPISSUEDLUND FIRE PRODUCTS09/08/2004
BISMHISSUEDNONE07/30/2004
BISPLISSUEDA.M.N. CORPORATION07/14/2004
BISOTISSUEDNONE07/08/2004
BIS—ISSUEDNA08/26/1998
BISPLISSUEDJD MASTERS PLBG & HTG05/07/1996
BISEQISSUEDJOHN TARA INC.03/07/1991
BISOTISSUEDJOHN TARA INC.03/07/1991
2 projects · most recent 01/27/2025
Gas Water/Sanitary
FiledStatusContractorScope
01/27/2025Signed-offM & M PIPING AND HEATINGGas
04/27/2022Permit IssuedKISHAN PLBG & HEATING INCWater/Sanitary
2 projects · most recent 02/17/2023
General Wiring
FiledStatusContractorScope
02/17/2023CompleteVINKOLE ELECTRIC INCGeneral Wiring
11/04/2019Permit IssuedJOSEPH WEINSTEIN ELECTRIC4 meters
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/13/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/06/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/01/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
01/27/2025Tenant Protection Plan ComplianceGLEN LANGERspecial
01/27/2025Fire-Resistant Penetrations and JointsGLEN LANGERspecial
04/21/2022Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
04/21/2022Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
04/21/2022Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
04/21/2022Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
04/10/2022FinalCHRISTIAN LOZADAprogress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/26/2026Q00716021-I1Request digital key ↗
08/26/2026Q00719544-I1Request digital key ↗
08/21/2026Q01088056-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/21/2026Q01088056-P1Open ↗
08/21/2026Q01088056-I1Open ↗
08/13/2026Q00716021-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/26/2026Q00716021-I1Open ↗
08/26/2026Q01088056-I1Open ↗
08/25/2026Q00719544-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026Q00716021-I1Open ↗
08/25/2026Q00719544-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/21/2026Q01088056-P1Open ↗
08/21/2026Q01088056-I1Open ↗
08/13/2026Q00719544-I1Open ↗
Showing 3 of 4 on file for this type