← Back
Two stories - detached, small or mid-size
65-15 181 STREET
QUEENS · Fresh Meadows-Utopia · BIN 4152956
💬 Discuss this project
1940Year Built
2.5Stories
A1Building Class
R2AZoning
1,400 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,000 sf lot · 0.35 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YOU GAO110/30/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
INDESIGN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CATMAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YOU GAO9407110/30/2025
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
07/22/2026
Signed off — Alteration
CAP/REMOVE OIL TANK & OIL BOILER, INSTALL NEW GAS BOILER AT CELLAR OF EXISTING 1 FAMILY BUILDING. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q01309194-I1
10/31/2025
Permit issued — Plumbing
Q01309194-I1-PL
10/30/2025
Filed — Alteration
CAP/REMOVE OIL TANK & OIL BOILER, INSTALL NEW GAS BOILER AT CELLAR OF EXISTING 1 FAMILY BUILDING. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q01309194-I1
10/30/2025
Special inspection requirement — HVAC-R and service water heating equipment
You Gao
10/30/2025
Special inspection requirement — HVAC-R and service water heating system controls
You Gao
10/30/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
You Gao
10/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
You Gao
10/27/2025
Special inspection requirement — Energy Code Compliance Inspections
You Gao
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC10/31/2025
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
10/30/2025HVAC-R and service water heating equipmentYou Gaoenergy_progress
10/30/2025HVAC-R and service water heating system controlsYou Gaoenergy_progress
10/30/2025HVAC-R and service water piping design and insulationYou Gaoenergy_progress
10/27/2025Fire-Resistant Penetrations and JointsYou Gaospecial
10/27/2025Energy Code Compliance InspectionsYou Gaoprogress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/18/2026Q01309194-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026Q01309194-I1Open ↗
08/26/2026Q01309194-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/18/2026Q01309194-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026Q01309194-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/18/2026Q01309194-I1Open ↗