← Back
All parking garages
65-19 METROPOLITAN AVENUE
QUEENS · Maspeth · BIN 4062148
💬 Discuss this project
1950Year Built
1Stories
G1Building Class
R4Zoning
2,776 sfGross Floor Area
1Units
1 Open Violation 0 unresolved · 1 paperwork only ▸
All parking garages · Owner of record: OLIVET REALTY GROUP LLC · 4,846 sf lot · 0.57 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OLIVET REALTY GROUP LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STOA DESIGN STUDIO LTD310/12/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MAXIMUM ELECTRIC203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STOA DESIGN STUDIO LTD4501210/12/2021
Building Lifecycle
All (12)Filed (3)Violation (1)Special Inspection (8)
11/21/2024
Violation issued (ECB, open)
Construction
10/12/2021
Filed — Alteration
REPLACE/REPAIR EXISTING BRICK PARAPET WALL & STEEL LINTELS AS REQUIRED.
Q00601122-I1
09/27/2021
Special inspection requirement — Final
Patrizia Cimino
09/27/2021
Special inspection requirement — Masonry
Patrizia Cimino
09/27/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Patrizia Cimino
09/27/2021
Special inspection requirement — Energy Code Compliance Inspections
Patrizia Cimino
07/09/2021
Filed — Alteration
NEW PLUMBING FIXTURES FOR PROPOSED DELICATESSEN STORE.
Q00549017-I1
06/29/2021
Filed — Alteration CO
Q00512042-I1
06/29/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Patrizia Cimino
06/29/2021
Special inspection requirement — HVAC-R and service water heating system controls
Patrizia Cimino
06/29/2021
Special inspection requirement — HVAC-R and service water heating equipment
Patrizia Cimino
06/29/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Patrizia Cimino
Nothing on file for this building.
1 project · most recent 07/09/2021
Water/Sanitary
FiledStatusContractorScope
07/09/2021——Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
09/27/2021FinalPatrizia Ciminoprogress
09/27/2021MasonryPatrizia Ciminospecial
09/27/2021Structural Stability – Alterations of existing buildingsPatrizia Ciminospecial
09/27/2021Energy Code Compliance InspectionsPatrizia Ciminoprogress
06/29/2021Fire-Resistant Penetrations and JointsPatrizia Ciminospecial
06/29/2021HVAC-R and service water heating system controlsPatrizia Ciminoenergy_progress
06/29/2021HVAC-R and service water heating equipmentPatrizia Ciminoenergy_progress
06/29/2021HVAC-R and service water piping design and insulationPatrizia Ciminoenergy_progress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/27/2026Q00512042-I1Request digital key ↗
08/27/2026Q00549017-I1Request digital key ↗
08/27/2026Q00601122-I1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/27/2026Q00512042-I1Open ↗
08/13/2026Q00549017-I1Open ↗
08/13/2026Q00601122-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/29/2026Q00601122-I1Open ↗
08/24/2026Q00549017-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026Q00601122-I1Open ↗
08/24/2026Q00549017-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/27/2026Q00512042-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/27/2026Q00512042-I1Open ↗
08/13/2026Q00549017-I1Open ↗
08/13/2026Q00601122-I1Open ↗