← Back
Elevator cooperative
65-30 160 STREET
QUEENS · BIN 4455383
💬 Discuss this project
1954Year Built
6Stories
D4Building Class
R6Zoning
749,142 sfGross Floor Area
793Units
LL97 CoveredRent Stabilized61 Open Violations ▸FDNY Report ↗
Elevator cooperative · Owner of record: THIRD HOUSING CO INC · 717,845 sf lot · 1.04 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
THIRD HOUSING COMPANY2403/22/2026
WHITE HILL RESTORATION,INC.503/22/2026
3RD HOUSING CO103/22/2026
ELECTCHESTER 3 HOUS C.103/22/2026
ELECTCHESTER 4 HOUSING CO103/22/2026
THIRD HOUSING CO INC ELEC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.201/15/2024
JOEL PHAGOO P.E. PLLC101/02/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P C403/21/2026
JOEL PHAGOO P.E. PLLC103/21/2026
JOEL PHAGOO P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A & C HEATING SERVICES INGeneral Contractor303/21/2026
WHITE HILL RESTORATION INCGeneral Contractor203/21/2026
GILSTON ELEC'L CONTR. CORElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851201/15/2024
Building Lifecycle
All (46)Filed (3)Permit Issued (3)Signed Off (3)Violation (32)Inspection (1)Special Inspection (4)
05/07/2026
Violation issued (HPD, closed)
A
06/12/2025
Violation issued (HPD, closed)
A
12/10/2024
Signed off — Alteration
INSTALL OIL TANK CONTAINMENT ENCLOSURES AND CONCRETE PAD.
Q00897678-I1
12/10/2024
Signed off — Alteration
INSTALL FUEL OIL TANKS FOR BACK UP USE.
Q00897663-I1
11/20/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/30/2024
Permit issued — Boiler Equipment
Q00897663-I1-BE
04/30/2024
Permit issued — General Construction
Q00897678-I1-GC
01/15/2024
Filed — Alteration
INSTALL OIL TANK CONTAINMENT ENCLOSURES AND CONCRETE PAD.
Q00897678-I1
01/15/2024
Filed — Alteration
INSTALL FUEL OIL TANKS FOR BACK UP USE.
Q00897663-I1
01/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
06/28/2023
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
06/28/2023
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
LOUIS ARENA
06/23/2020
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00114934-I1
08/22/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/24/2019
Violation issued (ECB, closed)
Construction
01/04/2019
Permit issued — Sidewalk Shed
Q00114934-I1-SH
01/02/2019
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00114934-I1
01/02/2019
Special inspection requirement — Final
JOEL PHAGOO
10/11/2013
Violation issued (HPD, closed)
B
10/11/2013
Violation issued (HPD, closed)
B
10/11/2013
Violation issued (HPD, closed)
B
10/11/2013
Violation issued (HPD, closed)
B
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2010
Violation issued (ECB, closed)
Elevators
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/03/2009
Violation issued (ECB, closed)
Construction
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/03/2005
Violation issued (HPD, closed)
A
12/03/2005
Violation issued (HPD, closed)
A
12/03/2005
Violation issued (HPD, closed)
A
12/03/2005
Violation issued (HPD, closed)
A
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/13/2003
Violation issued (HPD, closed)
B
09/13/2003
Violation issued (HPD, closed)
B
09/13/2003
Violation issued (HPD, closed)
A
10/20/1997
Violation issued (ECB, closed)
Elevators
01/06/1992
Violation issued (ECB, closed)
Elevators
01/21/1991
Violation issued (ECB, closed)
Elevators
06/20/1990
Violation issued (HPD, closed)
A
06/20/1990
Violation issued (HPD, closed)
A
08/08/1985
Violation issued (HPD, closed)
A
08/08/1985
Violation issued (HPD, closed)
A
08/08/1985
Violation issued (HPD, closed)
A
08/08/1985
Violation issued (HPD, closed)
A
08/08/1985
Violation issued (HPD, closed)
A
08/08/1985
Violation issued (HPD, closed)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offA&C HEATING SERVICES INC04/30/2024
DOB NOWGeneral ConstructionSigned-offA & C HEATING SERVICES IN04/30/2024
DOB NOWSidewalk ShedSigned-offWHITE HILL RESTORATION IN01/04/2019
BISPLISSUEDPAR PLUMBING CO., INC01/14/2019
BISOTISSUEDWHITE HILL RESTORATION INC07/06/2018
BISOTISSUEDWHITE HILL RESTORATION INC06/07/2018
BISBLISSUEDCC CONTROLLED PLBG CO INC12/11/2015
BISBLISSUEDCC CONTROLLED PLBG CO INC12/11/2015
BISPLISSUEDVARSITY PLBG AND HTG INC06/26/2015
BISPLISSUEDVARSITY PLBG AND HTG INC06/24/2014
BISBLISSUEDCC CONTROLLED PLBG CO INC05/12/2014
BISOTISSUEDC C CONTROLLED COMBUSTION04/10/2014
BISOTISSUEDDANA RESTORATION INC.06/22/2007
3 projects · most recent 08/02/2021
General Wiring
FiledStatusContractorScope
08/02/2021CompleteELDOR ELECTRIC LLC—
01/08/2019CompleteGILSTON ELEC'L CONTR. CORGeneral Wiring
12/28/2018Permit IssuedGREEN POWER ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
11/20/2024Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
01/09/2024Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
06/28/2023Tenant Protection Plan ComplianceLOUIS ARENAspecial
06/28/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsLOUIS ARENAspecial
01/02/2019FinalJOEL PHAGOOprogress
▾Documents — 90 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
08/23/2026Q00897663-I1Request digital key ↗
08/23/2026Q00897678-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/28/2026Q00114934-I1Request digital key ↗
▸Applications & Permits15
▸BISPLAN / WORK APPROVAL APPLICATION9
09/23/2019421718252Open ↗
05/07/2019421718252Open ↗
04/08/2019421718252Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION6
01/16/2019421718252Open ↗
08/03/2018421643136Open ↗
06/14/2018421643136Open ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
01/05/2019421718252Open ↗
▸Seals & Professional Certifications19
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
03/26/2020421643136Open ↗
03/11/2020421718252Open ↗
01/16/2019421718252Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/28/2026Q00114934-I1Open ↗
08/13/2026Q00897663-I1Open ↗
08/13/2026Q00897678-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
06/14/2018421643136Open ↗
04/17/2014420967458Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
06/14/2018421643136Open ↗
04/17/2014420967458Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026Q00897663-I1Open ↗
09/23/2026Q00897663-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/19/2026Q00114934-I1Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
09/23/2019421718252Open ↗
05/07/2019421718252Open ↗
04/08/2019421718252Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
04/17/2014420967458Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
01/05/2019421718252Open ↗
06/14/2018421643136Open ↗
▸Environmental & Asbestos5
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
01/05/2019421718252Open ↗
06/14/2018421643136Open ↗
04/17/2014420967458Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q00897663-I1Open ↗
08/13/2026Q00897678-I1Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
03/26/2020421643136Open ↗
03/11/2020421718252Open ↗
01/16/2019421718252Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
03/26/2020421643136Open ↗
03/11/2020421718252Open ↗
02/16/2017420967458Open ↗
▸BISTR8: Energy Code Progress Inspections1
04/17/2014420967458Open ↗
▸Approvals, Objections & Sign-offs10
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
04/21/2020421718252Open ↗
03/26/2020421643136Open ↗
03/11/2020421718252Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/28/2026Q00114934-I1Open ↗
08/13/2026Q00897663-I1Open ↗
08/13/2026Q00897678-I1Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
06/14/2018421643136Open ↗
02/16/2017420967458Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
04/17/2014420967458Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
03/26/2020421643136Open ↗
03/11/2020421718252Open ↗
01/05/2019421718252Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms11
▸BISADDITIONAL INFORMATION7
05/07/2019421718252Open ↗
04/08/2019421718252Open ↗
06/14/2018421643136Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET3
01/05/2019421718252Open ↗
06/14/2018421643136Open ↗
04/17/2014420967458Open ↗
▸BISBOROUGH INTAKE FORM1
04/21/2020421718252Open ↗