← Back
Elevator cooperative
Electchester 3rd House
65-30 160 STREET · Pomonok-Electchester-Hillcrest · BIN 4455394
💬 Discuss this project
1954Year Built
6Stories
D4Building Class
R6Zoning
749,142 sfGross Floor Area
793Units
LL97 CoveredRent Stabilized61 Open Violations ▸FDNY Report ↗
Elevator cooperative · Owner of record: THIRD HOUSING CO INC · 717,845 sf lot · 1.04 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
THIRD HOUSING2207/08/2026
3RD HOUSING CO203/22/2026
ELECHESTER 3 HOUSING103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.201/15/2024
JOEL PHAGOO P.E. PLLC107/23/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JOEL PHAGOO P.E. PLLC103/21/2026
NEW YORK ENGINEERING ASSOCIATES P C403/21/2026
JOEL PHAGOO P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A & C HEATING SERVICES INGeneral Contractor107/08/2026
WHITE HILL RESTORATION INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851201/15/2024
Building Lifecycle
All (45)Filed (3)Permit Issued (3)Signed Off (3)Violation (29)Inspection (1)Special Inspection (6)
05/07/2026
Violation issued (HPD, closed)
A
03/26/2026
Violation issued (FDNY_NOV, closed)
06/12/2025
Violation issued (HPD, closed)
A
12/10/2024
Signed off — Alteration
INSTALL FUEL OIL TANKS FOR BACK UP USE.
Q00898229-I1
12/10/2024
Signed off — Alteration
INSTALL TANK CONTAINMENT ENCLOSURES AND CONCRETE PAD.
Q00898242-I1
11/20/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/30/2024
Permit issued — Boiler Equipment
Q00898229-I1-BE
04/30/2024
Permit issued — General Construction
Q00898242-I1-GC
01/15/2024
Filed — Alteration
INSTALL FUEL OIL TANKS FOR BACK UP USE.
Q00898229-I1
01/15/2024
Filed — Alteration
INSTALL TANK CONTAINMENT ENCLOSURES AND CONCRETE PAD.
Q00898242-I1
01/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
06/29/2023
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
LOUIS ARENA
06/29/2023
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
06/29/2023
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
06/29/2023
Special inspection requirement — Final
LOUIS ARENA
09/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/24/2020
Violation issued (ECB, closed)
Elevators
01/07/2019
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00061375-I1
07/24/2018
Permit issued — Sidewalk Shed
Q00061375-I1-SH
07/23/2018
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00061375-I1
07/12/2018
Special inspection requirement — Final
JOEL PHAGOO
10/23/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/18/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/29/2010
Violation issued (ECB, closed)
Elevators
06/09/2009
Violation issued (ECB, closed)
Elevators
09/05/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/27/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/23/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/09/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/21/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/03/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/03/2003
Violation issued (HPD, closed)
B
06/30/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/27/1997
Violation issued (ECB, closed)
Elevators
03/04/1992
Violation issued (HPD, closed)
B
03/04/1992
Violation issued (HPD, closed)
B
06/14/1991
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
06/14/1991
Violation issued (ECB, closed)
Elevators
06/25/1990
Violation issued (HPD, closed)
B
06/25/1990
Violation issued (HPD, closed)
B
06/25/1990
Violation issued (HPD, closed)
A
06/25/1990
Violation issued (HPD, closed)
B
06/25/1990
Violation issued (HPD, closed)
A
06/21/1979
Violation issued (HPD, closed)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offA&C HEATING SERVICES INC04/30/2024
DOB NOWGeneral ConstructionSigned-offA & C HEATING SERVICES IN04/30/2024
DOB NOWSidewalk ShedSigned-offWHITE HILL RESTORATION IN07/24/2018
BISOTISSUEDWHITE HILL RESTORATION INC07/09/2018
BISOTISSUEDWHITE HILL RESTORATION INC06/07/2018
BISPLISSUEDVARSITY PLBG AND HTG INC06/26/2015
BISEQISSUEDCOBRA KITCHEN VENTILATION07/17/2014
BISPLISSUEDVARSITY PLBG AND HTG INC06/24/2014
BISBLISSUEDCC CONTROLLED PLBG CO INC05/12/2014
BISOTISSUEDC C CONTROLLED COMBUSTION04/11/2014
BISOTISSUEDDANA RESTORATION INC.06/22/2007
BISFSISSUEDA.L. EASTMORE AND SONS INC01/03/2003
6 projects · most recent 10/24/2022
General Wiring
FiledStatusContractorScope
10/24/2022CompleteFOREST ELECTRIC CORP.General Wiring
09/08/2022CompleteFOREST ELECTRIC CORP.—
08/02/2021CompleteELDOR ELECTRIC LLC—
04/22/2020CompleteTITAN ELEC'L & ELEV CONTR—
03/13/2019CompleteARCADIA ELECT'L CO. INC.General Wiring
07/11/2018CompleteGREEN POWER ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
11/20/2024Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
01/09/2024Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
06/29/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsLOUIS ARENAspecial
06/29/2023Tenant Protection Plan ComplianceLOUIS ARENAspecial
06/29/2023Tenant Protection Plan ComplianceLOUIS ARENAspecial
06/29/2023FinalLOUIS ARENAprogress
07/12/2018FinalJOEL PHAGOOprogress
▾Documents — 78 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/28/2026Q00061375-I1Request digital key ↗
08/23/2026Q00898242-I1Request digital key ↗
08/23/2026Q00898229-I1Request digital key ↗
▸Applications & Permits13
▸BISPLAN / WORK APPROVAL APPLICATION7
06/14/2018421643092Open ↗
01/26/2017420968224Open ↗
01/24/2017420968224Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION6
07/19/2018421643092Open ↗
06/14/2018421643092Open ↗
07/25/2014421005780Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications20
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
03/26/2020421643092Open ↗
06/14/2018421643092Open ↗
03/01/2017420968224Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
06/14/2018421643092Open ↗
07/25/2014421005780Open ↗
04/17/2014420968224Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
06/14/2018421643092Open ↗
07/25/2014421005780Open ↗
04/17/2014420968224Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/28/2026Q00061375-I1Open ↗
08/13/2026Q00898229-I1Open ↗
08/13/2026Q00898242-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/23/2026Q00898229-I1Open ↗
09/23/2026Q00898229-I1Open ↗
08/25/2026Q00898242-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026Q00061375-I1Open ↗
08/25/2026Q00898242-I1Open ↗
▸Trade Schedules & Equipment6
▸BISSELF-CERT PLUMBING NOTICE3
08/27/2015420968224Open ↗
08/07/2015420968224Open ↗
02/17/2015420968224Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
04/17/2014420968224Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
04/17/2014420968224Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
08/27/2015420968224Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
06/14/2018421643092Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
06/14/2018421643092Open ↗
04/17/2014420968224Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q00898229-I1Open ↗
08/13/2026Q00898242-I1Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
03/26/2020421643092Open ↗
06/14/2018421643092Open ↗
03/01/2017420968224Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
03/26/2020421643092Open ↗
03/01/2017420968224Open ↗
▸Approvals, Objections & Sign-offs12
▸BISLETTERS - SUPPORTING DOCUMENTATION5
06/14/2018421643092Open ↗
03/22/2017420968224Open ↗
03/22/2017420968224Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/28/2026Q00061375-I1Open ↗
08/13/2026Q00898229-I1Open ↗
08/13/2026Q00898242-I1Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
03/26/2020421643092Open ↗
03/22/2017420968224Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
07/25/2014421005780Open ↗
04/17/2014420968224Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
03/26/2020421643092Open ↗
06/14/2018421643092Open ↗
03/01/2017420968224Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION5
06/14/2018421643092Open ↗
01/26/2017420968224Open ↗
01/24/2017420968224Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET3
06/14/2018421643092Open ↗
07/25/2014421005780Open ↗
04/17/2014420968224Open ↗