💬 Discuss this project
1963Year Built
18Stories
O3Building Class
C5-2AZoning
308,053 sfGross Floor Area
1Units
LL97 Covered3 Active Violations 0 unresolved · 3 paperwork only 23 likely answered 3 old, status unconfirmed ▸FISP: UNSAFEFDNY Report ↗
Office only, 7-19 stories · Owner of record: NYC Department of Education · 17,769 sf lot · 17.34 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing
Floor 133 filings
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Site & exterior3 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority8010/28/2026
NYC Department of Education1503/22/2026
New York City Public School709/15/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Eme Consulting Engineering Group502/18/2025
NYMS Consulting509/02/2024
Brand Access Solutions210/27/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 Expediting Service403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Maric Plumbing & Heatingspecialty_contractor1206/28/2026
A & S ElectricElectrical1003/21/2026
Safway AtlanticScaffold910/28/2026
Maric Plumbing & HeatingScaffold906/28/2026
GridspanGeneral Contractor504/09/2026
Charan Electrical Enterp'sElectrical203/22/2026
Stanco System Electrical ContElectrical103/22/2026
Gemini Electric CoElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JPC Logistics Dba JPCL EN351502/18/2025
Twin Peaks317410/27/2023
Building Lifecycle
All (241)Filed (13)Permit Issued (9)Signed Off (1)Facade (FISP) (15)Violation (127)Inspection (1)Objection (6)Special Inspection (30)
02/20/2027
Facade inspection report due (FISP Cycle 9, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 9 filing on record yet
10/27/2026
Permit renewed — Sidewalk Shed
Renewed without changes
B00953358-I1-SH
09/28/2026
Signed off — Alteration
MATERIAL HOIST. FOR MATERIAL ONLY. NO WORK FROM HOIST.
B01445211-I1
09/23/2026
Permit renewed — Supported Scaffold
Renewed without changes
B00953369-I1-SF
09/15/2026
Boiler inspection report filed
Initial · defects found · Accepted
09/03/2026
Permit issued — Suspended Scaffold
B01445211-I1-SC
08/19/2026
Filed — Alteration
MATERIAL HOIST. FOR MATERIAL ONLY. NO WORK FROM HOIST.
B01445211-I1
06/27/2026
Elevator Category 1 inspection report filed
06/27/2026
Elevator Category 5 inspection report filed
06/22/2026
Permit renewed — Construction Fence
Renewed without changes
B00939762-I1-FN
06/22/2026
Permit renewed — Mechanical Systems
Renewed without changes
B00939762-S2-MS
03/10/2026
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
B01143895-I1-GC
03/10/2026
Permit expired, never signed off — Mechanical Systems
The city's record still shows this permit as issued, with no sign-off on its filing
B01143895-S1-MS
02/24/2026
Elevator Category 1 inspection report filed
11/06/2025
Boiler inspection report filed
Initial · defects found · Accepted
10/02/2025
Permit renewed — Supported Scaffold
Renewed without changes
B00953369-I1-SF
09/25/2025
Permit renewed — Sidewalk Shed
Renewed without changes
B00953358-I1-SH
07/23/2025
Permit renewed — Construction Fence
Renewed without changes
B00939762-I1-FN
07/23/2025
Permit renewed — Mechanical Systems
Renewed without changes
B00939762-S2-MS
06/16/2025
Permit renewed — Construction Fence
Renewed without changes
B00939762-I1-FN
06/16/2025
Permit renewed — Mechanical Systems
Renewed without changes
B00939762-S2-MS
05/28/2025
Permit renewed — Construction Fence
Renewed without changes
B00939762-I1-FN
05/28/2025
Permit renewed — Mechanical Systems
Renewed without changes
B00939762-S2-MS
03/18/2025
Cleaver brooks mobile steam boiler#6461-1111 servicing this building has expired permits displayed, maintain boiler; correct violation+submit…
ECB violation · closed
03/10/2025
Permit issued — General Construction
B01143895-I1-GC
03/10/2025
Permit issued — Mechanical Systems
B01143895-S1-MS
03/07/2025
Permit renewed — Construction Fence
Renewed without changes
B00939762-I1-FN
03/07/2025
Closed: Failure to file 2021 external low pressure inspection
DOB violation · closed on the city's record
03/06/2025
Permit renewed — Mechanical Systems
Renewed without changes
B00939762-S2-MS
02/18/2025
Filed — Alteration
Remove all existing ductwork associated with 13th floor old data center non-functioning AHU, the old data center is now converted to new office space. Install 6 new indoor units for the new office space and 1 outdoor on 14th floor low roof.
B01143895-S1
02/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
Asma Hashmi
02/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
Asma Hashmi
02/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Asma Hashmi
02/18/2025
Special inspection requirement — Maintenance information
Asma Hashmi
02/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
02/13/2025
Special inspection requirement — Post-installed Anchors
Asma Hashmi
02/13/2025
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
02/10/2025
Filed — Alteration
Remove all existing ductwork associated with 13th floor old data center non-functioning AHU, the old data center is now converted to new office space. Install 6 new indoor units for the new office space and 1 outdoor on 14th floor low roof.
B01143895-I1
11/18/2024
Special inspection requirement — Final
Asma Hashmi
11/18/2024
Special inspection requirement — Mechanical Systems
Asma Hashmi
11/06/2024
Boiler inspection report filed
Initial · defects found · Accepted
11/06/2024
Boiler inspection report filed
Initial · no defects · Accepted
10/31/2024
Closed: Failure to file 2021 external low pressure inspection
DOB violation · closed on the city's record
10/31/2024
Closed: Failure to file 2019 external low pressure inspection
DOB violation · closed on the city's record
10/08/2024
Permit renewed — Construction Fence
Renewed without changes
B00939762-I1-FN
10/07/2024
Permit renewed — Mechanical Systems
Renewed without changes
B00939762-S2-MS
09/30/2024
Permit renewed — Supported Scaffold
Renewed without changes
B00953369-I1-SF
09/30/2024
Permit renewed — Sidewalk Shed
Renewed without changes
B00953358-I1-SH
09/02/2024
Filed — Alteration
K801, INSTALLATION OF +/- 278 LF OF TEMPORARY FENCE TO ENCLOSE THE TEMPORARY EMERGENCY MOBILE BOILER. ENCLOSURE AND STAGING AREA IN CONJUNCTION WITH RED DOT PROJECT UNDER LLW # 135901 ON BEHALF OF CONTRACTOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
B00939762-P2
06/03/2024
Cleaver brooks cb-600 serial#64117 mobile boiler is placed onsite and operating without a DOB mobile boiler placement laa permit-ýlocated on the…
ECB violation · closed
02/08/2024
VC20: failed to conduct required (initial/periodic) inspection or test of water based fire protection system at premises.
FDNY_NOV violation · closed
01/19/2024
BF35: BF35:
FDNY_NOV violation · closed
12/19/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/16/2023
Permit issued — Sidewalk Shed
B00953358-I1-SH
11/15/2023
Permit issued — Supported Scaffold
B00953369-I1-SF
11/08/2023
Objection resolved — Addressed
11/08/2023
Objection resolved — Addressed
11/02/2023
Objection raised — Other
11/02/2023
Objection raised — Other
10/27/2023
Filed — Alteration
LLW# 135901: HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00953358-I1
Latest 60 of 241 events.
Nothing on file for this building.
Nothing on file for this building.
▾Documents — 116 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/31/2026B00683428-I1Request the plans ↗
08/29/2026B00696014-P1Request the plans ↗
08/29/2026B00696014-I1Request the plans ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications52
▸DOB NOWProgress Inspector Seal & Signature24
09/26/2026B00696014-P1Open ↗
09/26/2026B00696014-P1Open ↗
09/26/2026B00696014-P1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/26/2026B00696014-P1Open ↗
09/26/2026B00696014-P1Open ↗
09/26/2026B00696014-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/29/2026B00696014-I1Open ↗
08/29/2026B00696014-P1Open ↗
08/26/2026B00939762-S1Open ↗
Showing 3 of 13 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWNYCSCA - Approved Site Safety Plans4
08/26/2026B00939762-I1Open ↗
08/13/2026B00939762-P2Open ↗
08/13/2026B00953358-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/13/2026B00683428-I1Open ↗
08/13/2026B01143895-I1Open ↗
08/13/2026B01143895-S1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B00939762-S2Open ↗
▸Approvals, Objections & Sign-offs28
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
08/29/2026B00696014-I1Open ↗
08/29/2026B00696014-P1Open ↗
08/26/2026B00939762-S1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)12
08/26/2026B00939762-S1Open ↗
08/26/2026B00939762-I1Open ↗
08/13/2026B00683428-I1Open ↗
Showing 3 of 12 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
01/22/2019302574925Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026B00683428-I1Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/29/2026B00696014-I1Open ↗
▸Cost, Insurance & Ownership2
▸DOB NOWNYCSCA Wrap-up Insurance2
08/13/2026B00953369-I1Open ↗
08/13/2026B00953358-I1Open ↗
▸Other Documents13
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal9
08/26/2026B00939762-I1Open ↗
08/26/2026B00939762-S1Open ↗
08/13/2026B00696014-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWPro Cert Restriction Exception (LL158/17)2
08/13/2026B01143895-I1Open ↗
08/13/2026B01143895-S1Open ↗
▸DOB NOWCalculations1
08/20/2026B01445211-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/20/2026B01445211-I1Open ↗