Roof3p · 2 filings · 7 docs
Architecture
Facade modifications to take place as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents · 1 drawing sheet
Facade modifications to take place as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 2 drawing sheets
Floor 361 filing
Fire ProtectionMechanical
Issued Permit Scope
Mechanical Systems · Sprinklers · Standpipe
Project M01418142Signed-off · 07/21/2026
MECHANICAL WORK ON THE 36TH FLOOR MARKETING (35TH FLOOR CONSTRUCTION). NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Floor 351p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Mechanical modifications to take place on the 35th Construction Floor (Listed as 36th Marketing Floor) as per drawings filed herewith. No change in use, egress, occupancy.
On file for this project
19 documents · 1 drawing sheet
Structural modifications to take place on the 35th Construction floor as per drawings filed herewith. No change in use, egress, or occupancy as per drawings filed herewith. (Floor Listed as 36th Marketing Floor)
On file for this project
3 documents
Sprinkler modifications to take place on the 35th Construction Floor (36th Marketing Floor) as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
9 documents
Latest 3 of 4 filings on this floor.
Floor 34
Floor 33
Floor 325p · 4 filings · 18 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Sprinkler modifications taking place on the 32nd floor per plans filed herewith. No change in use, egress or occupancy.
On file for this project
4 documents
General construction modifications taking place on the 32nd floor per plans filed herewith. No change in use, egress or occupancy.
On file for this project
5 documents · 5 drawing sheets
Mechanical modifications taking place on the 32nd floor per plans filed herewith. No change in use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
Floor 313p · 3 filings · 6 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe
Plumbing modifications to take place on the 31st floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
8 documents · 1 drawing sheet
Mechanical modifications to take place on the 31st floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
9 documents · 1 drawing sheet
Sprinkler modifications to take place on the 31st floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
5 documents · 1 drawing sheet
Floor 305p · 7 filings · 6 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
MECHANICAL MODIFICATIONS TO TAKE PLACE ON THE 30TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
10 documents · 1 drawing sheet
SPRINKLER MODIFICATIONS TO TAKE PLACE ON THE 30TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
PLUMBING MODIFICATIONS TO TAKE PLACE ON THE 30TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 298p · 9 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Mechanical modifications to take place on the 29th Floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents
Sprinkler modifications to take place on the 29th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
5 documents
Plumbing modifications to take place on the 29th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 9 filings on this floor.
Floor 2810p · 9 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
General Construction to take place on the 28th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
7 documents · 3 drawing sheets
Sprinkler modifications to take place on the 28th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
5 documents
Plumbing modifications to take place on the 28th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents
Latest 3 of 9 filings on this floor.
Floor 2713p · 3 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalOther
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Standpipe
Sprinkler modifications taking place on the 27th floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
17 documents · 11 drawing sheets
General Construction to take place on the 27th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
27th Floor Architectural modifications to take place as drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents · 2 drawing sheets
Floor 2616p · 8 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Sprinkler modifications to take place on the 26th floor as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
7 documents · 1 drawing sheet
Mechanical modifications to take place on the 26th floor as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
6 documents · 1 drawing sheet
Plumbing modifications to take place on the 26th floor as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 25Under Construction14p · 11 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingOther
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Plumbing modifications to take place on the 25th floor as shown on plans submitted herewith. No change in use, egress or occupancy.
On file for this project
4 documents
Sprinkler modifications to take place on the 25th floor as shown on plans submitted herewith. No change in use, egress or occupancy.
On file for this project
3 documents
General Construction to take place on the 25th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
5 documents · 5 drawing sheets
Latest 3 of 11 filings on this floor.
Floor 245p · 1 filing · 10 docs
ArchitectureDMFire Protection
Issued Permit Scope
General Construction · Sprinklers · Standpipe
Minor demolition and Installation of new interior partitions, doors, suspended ceilings and finishes on the 23 and 24 Floors as per plans. No change to use, egress or occupancy.
On file for this project
10 documents · 5 drawing sheets
Floor 236p · 2 filings · 17 docs
ArchitectureDMFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Standpipe
Minor demolition and Installation of new interior partitions, doors, suspended ceilings and finishes on the 23 and 24 Floors as per plans. No change to use, egress or occupancy.
On file for this project
10 documents · 5 drawing sheets
Modifications to the existing HVAC system on the 23rd floor as per plans. No change to use, egress or occupancy.
On file for this project
7 documents · 1 drawing sheet
Floor 2211p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Mechanical modifications to take place on the 21st and 22nd floor as per drawings filed herewith. No change in use, egress, or occupancy;.
On file for this project
10 documents · 2 drawing sheets
Plumbing modifications to take place on the 22nd floor as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 1 drawing sheet
Sprinkler modifications to take place on the 22nd floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 21Under Construction23p · 11 filings · 20 docs
ArchitectureCivilDMElectricalFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
MECHANICAL WORK ON THE 21ST FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
16 documents · 6 drawing sheets
PARTIAL 21ST FLOOR INTERIOR WORK AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
MECHANICAL WORK ON THE 21ST FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
13 documents · 4 drawing sheets
Latest 3 of 11 filings on this floor.
Floor 20
Floor 1910p · 6 filings · 20 docs
ArchitectureDMFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Standpipe
Sprinkler modifications taking place on the 19th floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
12 documents · 1 drawing sheet
Mechanical modifications taking place on the 19th floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
General construction modifications taking place on the 19th floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
4 documents · 5 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 188p · 5 filings · 8 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Mechanical modifications to take place on the 18th floor as shown on plans submitted herewith. No change in use, egress or occupancy.
On file for this project
3 documents
General Construction to take place on the 18th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
5 documents · 7 drawing sheets
Modification to mechanical systems as per plans filed herewith. No change in use, occupancy or egress.
On file for this project
4 documents
Latest 3 of 5 filings on this floor.
Floor 178p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Modifications to the existing Sprinkler System: Install (2) new sprinkler heads, relocate (3) existing sprinkler head and remove (2) existing sprinkler heads and associated piping on the 17th Floor as per plans (Balyasny Asset Management.)
On file for this project
4 documents · 1 drawing sheet
Removal of existing fixtures and cap piping. Install (2) new lavatories, (3) urinals, (3) water closets, (1) HWH and associated CW/sanitary piping on the 17th Floor as per plans (BAM NY Expansion.) No change to use, egress or occupancy
On file for this project
8 documents · 3 drawing sheets
Minor interior demolition. Install new glass office front system, sliding glass doors, gypsum ceiling, metal doors & frames, new toilet partitions & accessories, countertops and finishes as per plans (Balyasny Asset Management - NY Expansion.)
On file for this project
5 documents · 3 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 162p · 3 filings · 12 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Standpipe
Sprinkler modifications to take place on the 16th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
6 documents
General Construction to take place on the 16th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 2 drawing sheets
Mechanical modifications to take place on the 16th floor as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents
Floor 15Under Construction7p · 5 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalOther
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Standpipe
MECHANICAL WORK ON THE 15TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
10 documents · 3 drawing sheets
PARTIAL 15TH FLOOR INTERIOR WORK AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
Mechanical modifications to take place on the 15th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
12 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 14
Floor 13
Floor 12
Floor 113p · 3 filings · 6 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe
Sprinkler work for tenant space ExodusPoint on 11th floor north
On file for this project
10 documents · 2 drawing sheets
Mechanical ductwork modification for tenant space Exodus Point on 11th floor north
On file for this project
6 documents
Plumbing work for tenant space ExodusPoint on 11th floor north.
On file for this project
3 documents · 1 drawing sheet
Floor 104p · 3 filings · 14 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Standpipe
Modification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
8 documents · 1 drawing sheet
INTERIOR ALTERATIONS (CONFERENCE ROOMS, LOCKER ROOM, RECEPTION AREA, OFFICES) AS PER DRAWINGS HEREIN. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
Modification to existing HVAC system as per plans filed herewith. NO change in use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Floor 96p · 1 filing · 5 docs
ArchitectureDMFire Protection
Issued Permit Scope
General Construction · Sprinklers · Standpipe
General construction modifications taking place on the 9th floor per plans filed herewith. No change in use, egress or occupancy.
On file for this project
5 documents · 6 drawing sheets
Floor 8Under Construction12p · 2 filings · 19 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
RENOVATION OF EXISTING OFFICE SPACES ON THE 8TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE TO USE, OCCUPANCY, OR EGRESS
On file for this project
19 documents · 11 drawing sheets
Minor mechanical modification within 8th floor space as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
5 documents · 1 drawing sheet
Floor 76p · 3 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Standpipe
Mechanical modifications taking place on the 5th thru 7th floors per plans filed herewith. No change in use, egress or occupancy.
On file for this project
6 documents · 2 drawing sheets
Sprinkler modifications taking place on the 5th thru 7th floors per plans filed herewith. No change in use, egress or occupancy.
On file for this project
12 documents · 1 drawing sheet
General construction modifications taking place on the 5th thru 7th floors per plans filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents · 3 drawing sheets
Floor 6Under Construction7p · 3 filings · 13 docs
ArchitectureDMFire ProtectionGeneralMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Standpipe
PARTIAL 6TH FLOOR INTERIOR WORK AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Mechanical modifications taking place on the 5th thru 7th floors per plans filed herewith. No change in use, egress or occupancy.
On file for this project
6 documents · 2 drawing sheets
General construction modifications taking place on the 5th thru 7th floors per plans filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents · 5 drawing sheets
Floor 59p · 5 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Standpipe
Mechanical modifications taking place on the 5th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 1 drawing sheet
Mechanical modifications taking place on the 5th thru 7th floors per plans filed herewith. No change in use, egress or occupancy.
On file for this project
6 documents · 2 drawing sheets
Sprinkler modifications taking place on the 5th thru 7th floors per plans filed herewith. No change in use, egress or occupancy.
On file for this project
12 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 48p · 3 filings · 15 docs
ArchitectureDMFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Sprinkler modifications to take place on the second, third, and fourth floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
General Construction to take place on the second, third, and fourth floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 8 drawing sheets
Mechanical modifications to take place on the second, third, and fourth floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
8 documents
Floor 37p · 3 filings · 15 docs
ArchitectureDMFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Sprinkler modifications to take place on the second, third, and fourth floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
General Construction to take place on the second, third, and fourth floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 6 drawing sheets
Mechanical modifications to take place on the second, third, and fourth floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
8 documents · 1 drawing sheet
Floor 28p · 3 filings · 15 docs
ArchitectureDMFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Sprinkler modifications to take place on the second, third, and fourth floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents
General Construction to take place on the second, third, and fourth floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 7 drawing sheets
Mechanical modifications to take place on the second, third, and fourth floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
8 documents · 1 drawing sheet
Floor 12p · 3 filings · 8 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Standpipe
Mechanical modifications taking place on the first floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
7 documents · 1 drawing sheet
Architectural modifications taking place on the first floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
6 documents · 1 drawing sheet
Sprinkler modifications taking place on the first floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
8 documents
Site & exterior4 filings · 11 docs
ArchitectureElectricalEquipmentStructural
Issued Permit Scope
General Construction · Sidewalk Shed
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents · 6 drawing sheets
Facade modifications to take place as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents · 10 drawing sheets
Facade modifications to take place as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 10 drawing sheets
Latest 3 of 4 filings on this floor.
Filed — no permit issued3 filings · 9 docs
Fire ProtectionMechanicalPlumbing
mechanical ductwork modification for tenant space exodus point on 11th floor north
On file for this project
3 documents · 8 drawing sheets
SPRINKLER WORK FOR TENANT SPACE EXODUSPOINT ON 11TH FLOOR NORTH
On file for this project
3 documents · 5 drawing sheets
No filed description on record for this project.
On file for this project
3 documents · 4 drawing sheets