← Back
BuildNYC
Fire Department
65 HARBOR ROAD
STATEN ISLAND · BIN 5027755
💬 Discuss this project
1931Year Built
2Stories
Y1Building Class
R3AZoning
3,200 sfGross Floor Area
1Units
1 Active Violation 0 unresolved · 1 paperwork only 8 likely answered ▸FDNY Report ↗
Fire Department · Owner of record: Fire Department of New York · 6,700 sf lot · 0.48 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof2 filings
Cellar1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Fire Department of the City of New York1007/08/2026
Fire Department403/21/2026
NYC Department of Design and Construction103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Cameron Engineering310/13/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Franco Belli PLMG & Heating SonPlumbing307/08/2026
ZHL GroupGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TC Construction Services7255410/13/2023
Building Lifecycle
All (50)Filed (3)Permit Issued (2)Signed Off (1)Violation (18)Inspection (3)Objection (2)Special Inspection (7)
08/06/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/14/2025
Failure to file 2024 external low pressure inspection
DOB violation · open
09/20/2025
Boiler inspection report filed
Initial · no defects · Accepted
07/11/2025
Permit expired, never signed off — Plumbing
The city's record still shows this permit as issued, with no sign-off on its filing
S00498555-I1-PL
10/11/2024
Signed off — Alteration
INSTALLATION OF NEW STANDBY GENERATOR SUPPORTED BY STRUCTURAL DUNNAGE.
S00498554-I1
10/05/2024
Boiler inspection report filed
Initial · no defects · Accepted
09/23/2024
Failure to file 2023 external low pressure inspection
DOB violation · open
07/11/2024
Permit renewed — Plumbing
Renewed without changes
S00498555-I1-PL
06/11/2024
Permit issued — Structural
S00498554-I1-ST
01/08/2024
FES-25-01: Failed to provide and/or maintain at premises a record for inspection, testing, and maintenance of special hazard fire extinguishing…
FDNY_ORDER violation · closed
01/08/2024
CC-21-02: Failed to maintain required ventilation system for commercial cooking appliances in good working order, in violation of FC609.5.
FDNY_ORDER violation · closed
01/02/2024
Found burnham model V905 boiler to be unregistered. Register boiler.
ECB violation · open
12/19/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/02/2023
Special inspection requirement — Energy Code Compliance Inspections
Tim Carroll
11/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Tim Carroll
10/13/2023
Filed — Alteration
New 80kW NG fired generator with associated gas booster, piping and supports. New separate NG service and meter for generator.
S00498555-P1
09/24/2023
Boiler inspection report filed
Initial · no defects · Accepted
08/04/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/30/2023
Failure to file 2020 external low pressure inspection
DOB violation · open · Issued 2023; DOB's record still lists it as active
06/30/2023
Failure to file 2021 external low pressure inspection
DOB violation · open · Issued 2023; DOB's record still lists it as active
06/20/2023
Failure to file 2019 external low pressure inspection
DOB violation · open · Issued 2023; DOB's record still lists it as active
06/20/2023
Failure to file 2018 external low pressure inspection
DOB violation · open · Issued 2023; DOB's record still lists it as active
04/25/2023
Failure to file 2022 external low pressure inspection
DOB violation · open · Issued 2023; DOB's record still lists it as active
01/18/2023
Permit renewed — Plumbing
Renewed without changes
S00498555-I1-PL
11/14/2022
VC11: failed to maintain exhaust hood/duct/fan in (clean condition) or in compliance with (general maintenance) requirements. VC20: failed to…
FDNY_NOV violation · closed
10/16/2022
Boiler inspection report filed
Initial · no defects · Accepted
08/11/2022
Permit issued — Plumbing
S00498555-I1-PL
10/16/2021
Boiler inspection report filed
Initial · no defects · Accepted
07/23/2021
Objection raised — Admin
07/23/2021
Objection resolved — Addressed
07/13/2021
Filed — Alteration
INSTALLATION OF NEW STANDBY GENERATOR SUPPORTED BY STRUCTURAL DUNNAGE.
S00498554-I1
07/13/2021
Filed — Alteration
New 80kW NG fired generator with associated gas booster, piping and supports. New separate NG service and meter for generator.
S00498555-I1
05/05/2021
Special inspection requirement — Structural Steel - High Strength Bolting
Tim Carroll
05/05/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Tim Carroll
05/05/2021
Special inspection requirement — Structural Steel - Welding
Tim Carroll
05/05/2021
Special inspection requirement — Structural Steel - Details
Tim Carroll
04/05/2021
Special inspection requirement — Final
Tim Carroll
11/14/2020
Boiler inspection report filed
Initial · no defects · Accepted
11/08/2019
Violation issued for failure to file annual boiler 2017 inspection report
DOB violation · open · Issued 2019; DOB's record still lists it as active
09/21/2019
Boiler inspection report filed
Initial · no defects · Accepted
09/29/2018
Boiler inspection report filed
Initial · no defects · Accepted
09/29/2018
Boiler inspection report filed
Initial · no defects · Pre-filing
10/05/2017
Boiler inspection report filed
Initial · no defects · Pre-Filing
10/05/2017
Boiler inspection report filed
Initial · no defects · Accepted
12/15/2011
Closed: Local law 62/91 - boilers: boiler (DOB violation)
DOB violation · closed on the city's record
08/02/2010
B254,15,19B,32A,50,50A. 50- lwgo mounted above shut off valves. 50A. Missing manual reset aquastat.
ECB violation · closed
01/01/2009
Local law 62/91 - boilers: boiler (DOB violation)
DOB violation · closed · Issued 2009; DOB's record still lists it as active
01/03/2008
Local law 62/91 - boilers: boiler (DOB violation)
DOB violation · closed · Issued 2008; DOB's record still lists it as active
06/19/2007
Closed: Local law 62/91 - boilers: boiler (DOB violation)
DOB violation · closed on the city's record
01/19/2007
Local law 62/91 - boilers: boiler (DOB violation)
DOB violation · closed · Issued 2007; DOB's record still lists it as active
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Franco Belli PLMG & Heating Son—
DOB NOW—ZHL Group—
DOB NOW—Franco Belli PLMG & Heating Son—
DOB NOW—Franco Belli PLMG & Heating Son—
BIS—Par Plumbing Co—
BIS—ZHL Group—
BIS—ZHL Group—
BIS—Par Plumbing Co—
BIS—ZHL Group—
BIS—ZHL Group—
BIS—Fire Command Co—
BIS—Maximum Mechanical—
BIS—Maximum Mechanical—
BIS—Lafata-Corallo Plumbing & Heating—
BIS—La Wenger Contracting Co—
BIS—La Wenger Contracting Co—
Nothing on file for this building.
Nothing on file for this building.
▾Documents — 70 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/22/2026S00498555-P1Request the plans ↗
08/22/2026S00498555-I1Request the plans ↗
08/15/2026S00498554-I1Request the plans ↗
▸Applications & Permits16
▸BISWORK PERMIT APPLICATION11
11/22/2019520213983Open ↗
02/04/2016520213983Open ↗
02/02/2016520213983Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
07/24/2019520213983Open ↗
08/10/2017520213983Open ↗
10/01/2015520213983Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications15
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
07/22/2015520213983Open ↗
07/22/2015520213983Open ↗
06/02/2015520213983Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/29/2026S00498554-I1Open ↗
08/29/2026S00498554-I1Open ↗
08/29/2026S00498554-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/22/2026S00498555-P1Open ↗
08/22/2026S00498555-I1Open ↗
08/13/2026S00498554-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/29/2026S00498554-I1Open ↗
08/27/2026S00498555-I1Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
07/24/2019520213983Open ↗
08/10/2017520213983Open ↗
03/25/2015520213983Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
11/06/2015520213983Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/22/2026S00498555-I1Open ↗
08/22/2026S00498555-P1Open ↗
08/13/2026S00498554-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
10/19/2015520213983Open ↗
10/01/2015520213983Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
07/22/2015520213983Open ↗
03/25/2015520213983Open ↗
03/25/2015520213983Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/28/2020520213983Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/10/2020520213983Open ↗
▸Inspections & Test Reports3
▸BISMASONRY MANUFACTURER'S STATEMENT-FORM 10H2
06/17/2015520213983Open ↗
06/17/2015520213983Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
08/28/2020520213983Open ↗
▸Approvals, Objections & Sign-offs11
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/22/2026S00498555-P1Open ↗
08/22/2026S00498555-I1Open ↗
08/13/2026S00498554-I1Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)3
08/13/2026S00498555-I1Open ↗
08/13/2026S00498554-I1Open ↗
08/13/2026S00498555-P1Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
09/10/2020520213983Open ↗
12/21/2016520213983Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
08/13/2026S00498555-I1Open ↗
08/13/2026S00498554-I1Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/25/2015520213983Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
08/28/2020520213983Open ↗
03/25/2015520213983Open ↗
03/25/2015520213983Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET2
03/25/2015520213983Open ↗
03/25/2015520213983Open ↗
▸BISADDITIONAL INFORMATION1
10/15/2019520213983Open ↗
▸BISBOROUGH INTAKE FORM1
07/24/2019520213983Open ↗
▸Other Documents1
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026S00498554-I1Open ↗