← Back
BuildNYC
Condo, residential unit in elevator building
Oceana Condominium No. Ten
65 OCEANA DRIVE EAST · Brighton Beach · BIN 3387624
💬 Discuss this project
2004Year Built
12Stories
R4Building Class
R7-1Zoning
—Gross Floor Area
88Units
1 Active Violation 11 likely answered 3 old, status unconfirmed ▸FISP: SAFEFDNY Report ↗
Condo, residential unit in elevator building · 4.79 FAR built · Flood zone X500
Locations of Work
Mechanical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofReplacement rooftop HVAC unitUnder Construction1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Brighton Construction203/21/2026
Oceana Condo103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Madriaga Engineering108/28/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Brighton DevelopmentGeneral Contractor303/21/2026
Darancio SanzoneGeneral Contractor203/21/2026
Smart Plumbing & HeatingPlumbing103/21/2026
HVAC Performancespecialty_contractor111/08/2026
Duo Plumbing & HeatingPlumbing103/21/2026
Benel ConstructionGeneral Contractor111/09/2017
Brighton DevelopGeneral Contractor109/16/2005
Duo Plumbing & HeatingPlumbing110/29/2004
Finix U.S.A. ConstructionGeneral Contractor208/17/2012
Highrise Hoisting & ScaffoldingGeneral Contractor105/18/2004
Jerrick AssociatesGeneral Contractor111/05/2010
TPC II ContractorsPlumbing108/21/2012
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
J&R Design and Inspection6637108/28/2026
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
10/27/2026
Permit issued — Mechanical Systems
B01448045-I1-MS
08/28/2026
Filed — Alteration
REPLACEMENT OF ROOF TOP SINGLE-PACKAGE HVAC UNIT. NO CHANGES TO OCCUPANCY, MEANS OF EGRESS, OR OCCUPANT LOAD.
B01448045-I1
08/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Truskosky
08/28/2026
Special inspection requirement — Maintenance information
Robert Truskosky
104 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedHVAC Performance10/27/2026
BISPLISSUEDSmart Plumbing & Heating01/12/2018
BISOTISSUEDBenel Construction11/09/2017
BISPLISSUEDTPC II Contractors08/21/2012
BISMHISSUEDFinix U.S.A. Construction08/17/2012
BISOTISSUEDFinix U.S.A. Construction07/16/2012
BISEQISSUEDJerrick Associates11/05/2010
BISOTISSUEDDarancio & Sanzone04/04/2007
BISOTISSUEDDarancio & Sanzone01/26/2007
BIS—ISSUEDBrighton Development05/11/2006
BIS—ISSUEDBrighton Development10/05/2005
BISCCISSUEDBrighton Develop09/16/2005
BIS—ISSUEDBrighton Development05/06/2005
BISEQISSUEDBrighton Development12/14/2004
BISBLISSUEDDuo Plumbing & Heating10/29/2004
BISEQISSUEDHighrise Hoisting & Scaffolding05/18/2004
BIS—ISSUEDBrighton Development05/06/2004
BISPLRE-ISSUEDDuo Plumbing & Heating02/24/2004
BIS—RE-ISSUEDBrighton Development01/15/2004
BISEQISSUEDBrighton Development01/15/2004
BISEQISSUEDBrighton Development01/15/2004
1 project · most recent 08/28/2026
Air Conditioning Systems
FiledStatusContractorScope
08/28/2026Permit IssuedHVAC PerformanceAir Conditioning Systems
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
08/28/2026Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
08/28/2026Maintenance informationRobert Truskoskyenergy_progress
08/28/2026HVAC-R and service water heating system controlsRobert Truskoskyenergy_progress
08/28/2026Tenant Protection Plan ComplianceRobert Truskoskyspecial
08/28/2026Energy Code Compliance InspectionsRobert Truskoskyprogress
08/28/2026HVAC-R and service water heating equipmentRobert Truskoskyenergy_progress
08/19/2026Mechanical SystemsRobert Truskoskyspecial
08/19/2026FinalJonar Madriagaprogress
42 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account