← Back
STATEN ISLAND
65 PRESCOTT AVENUE
STATEN ISLAND · New Dorp-Midland Beach · BIN 5176782
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingCivilGeneral
Floor 213p · 2 filings · 20 docs
Floor 118p · 2 filings · 20 docs
Basement13p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BRADLEY ASSOC OF SI1607/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSEPH M. MORACE, A.I.A., ARCHITECT307/16/2025
C&P DESIGN CONSULTANTS101/31/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L GASS603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BRADLEY ASSOCIATES OF SIGeneral Contractor507/08/2026
CHARLES J. DEHART JR P&HPlumbing107/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C&P DESIGN CONSULTANT8472201/31/2025
A TECH ENGINEERING NYC, P6738107/24/2024
Building Lifecycle
All (52)Filed (4)Permit Issued (5)Signed Off (3)Inspection (8)Objection (2)Special Inspection (30)
04/23/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/23/2025
Signed off — New Building
PROPOSED INSTALLATION OF NEW 8'-6" CURB CUT TO BE COMBINED WITH ADJACENT 8'-6" CURB CUT TOTALLING 17' FOR DETACHED TWO-FAMILY RESIDENCE.
S01073843-S4
08/06/2025
Signed off — New Building
PROPOSED INSTALLATION OF NEW 8'-6" CURB CUT TO BE COMBINED WITH ADJACENT 8'-6" CURB CUT TOTALLING 17' FOR DETACHED TWO-FAMILY RESIDENCE.
S01073843-S3
07/31/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/31/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
07/17/2025
Permit issued — Curb Cut
S01073843-S3-CC
07/16/2025
Filed — New Building
PROPOSED INSTALLATION OF NEW 8'-6" CURB CUT TO BE COMBINED WITH ADJACENT 8'-6" CURB CUT TOTALLING 17' FOR DETACHED TWO-FAMILY RESIDENCE.
S01073843-S3
07/16/2025
Signed off — New Building
PROPOSED INSTALLATION OF NEW 8'-6" CURB CUT TO BE COMBINED WITH ADJACENT 8'-6" CURB CUT TOTALLING 17' FOR DETACHED TWO-FAMILY RESIDENCE.
S01073843-S2
05/31/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/09/2025
Permit issued — Mechanical Systems
S01073843-S4-MS
02/26/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
02/25/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/05/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/31/2025
Filed — New Building
PROPOSED INSTALLATION OF NEW 8'-6" CURB CUT TO BE COMBINED WITH ADJACENT 8'-6" CURB CUT TOTALLING 17' FOR DETACHED TWO-FAMILY RESIDENCE.
S01073843-S4
01/29/2025
Permit issued — Plumbing
S57810564-S2-PL
01/13/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Stanislav Pilipenko
01/13/2025
Special inspection requirement — Maintenance information
Stanislav Pilipenko
01/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
01/13/2025
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
01/13/2025
Special inspection requirement — Ventilation and air distribution system
Stanislav Pilipenko
01/13/2025
Special inspection requirement — HVAC-R and service water heating equipment
Stanislav Pilipenko
01/13/2025
Special inspection requirement — HVAC-R and service water heating system controls
Stanislav Pilipenko
01/13/2025
Special inspection requirement — Duct leakage testing, insulation and design
Stanislav Pilipenko
01/13/2025
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
01/11/2025
Special inspection requirement — Mechanical Systems
Stanislav Pilipenko
01/11/2025
Special inspection requirement — Final
Stanislav Pilipenko
12/12/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/27/2024
Permit issued — Plumbing
S01073843-S2-PL
11/20/2024
Filed — New Building
PROPOSED INSTALLATION OF NEW 8'-6" CURB CUT TO BE COMBINED WITH ADJACENT 8'-6" CURB CUT TOTALLING 17' FOR DETACHED TWO-FAMILY RESIDENCE.
S01073843-S2
11/18/2024
Permit issued — General Construction
S01073843-I1-GC-CX
11/06/2024
Objection resolved — Addressed
08/20/2024
Objection raised — Scope
07/24/2024
Filed — New Building
PROPOSED INSTALLATION OF NEW 8'-6" CURB CUT TO BE COMBINED WITH ADJACENT 8'-6" CURB CUT TOTALLING 17' FOR DETACHED TWO-FAMILY RESIDENCE.
S01073843-I1
06/28/2024
Special inspection requirement — Footing and Foundation
anthony santoro
06/28/2024
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
06/28/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
06/28/2024
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
06/28/2024
Special inspection requirement — Insulation placement and R values
anthony santoro
06/28/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
06/28/2024
Special inspection requirement — Air barrier — testing
anthony santoro
06/28/2024
Special inspection requirement — Permanent certificate
anthony santoro
06/28/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
06/28/2024
Special inspection requirement — Interior lighting power
anthony santoro
06/28/2024
Special inspection requirement — Fenestration areas
anthony santoro
06/28/2024
Special inspection requirement — Ventilation and air distribution system
anthony santoro
06/28/2024
Special inspection requirement — Fenestration air leakage
anthony santoro
06/28/2024
Special inspection requirement — Metering
anthony santoro
06/28/2024
Special inspection requirement — Protection of exposed foundation insulation
anthony santoro
06/28/2024
Special inspection requirement — Air barrier - visual inspection
anthony santoro
06/28/2024
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
06/28/2024
Special inspection requirement — Maintenance information
anthony santoro
06/28/2024
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offBRADLEY ASSOCIATES OF SI07/17/2025
DOB NOWMechanical SystemsSigned-offBRADLEY ASSOCIATES OF SI04/09/2025
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC01/29/2025
DOB NOWPlumbingSigned-offCHARLES J. DEHART JR P&H11/27/2024
DOB NOWGeneral ConstructionPermit IssuedBRADLEY ASSOCIATES OF SI11/18/2024
1 project · most recent 07/16/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/16/2025Signed-offBRADLEY ASSOCIATES OF SIHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Comfort Aire AHU: B-VCD48SA-1 - HP: A-VCD48SA-1 47,000 BTU · Heat Pump Outdoor ×4
AHU: B-VCD60SA-1 - HP: A-VCD60SA-1 55,000 BTU · Heat Pump Outdoor ×4
Ventilation
Comfort Aire FIT 120E - ALTERNATE UNIT USED 120 CFM AND 2.0 CFM/W 170 CFM · Erv ×4
Fantech FIT 80E ALTERNATE UNIT USED 2.33 CFM/W 70 CFM · Erv ×4
1 project · most recent 07/16/2025
Storm Water/Sanitary
FiledStatusContractorScope
07/16/2025Signed-offCHARLES J. DEHART JR P&HStorm, Water/Sanitary
1 project · most recent 01/24/2025
General Wiring
FiledStatusContractorScope
01/24/2025CompleteB & R ELEC'L CONTR'G, INCGeneral Wiring
1 project · most recent 07/16/2025
Wood
FiledStatusContractorScope
07/16/2025Signed-offBRADLEY ASSOCIATES OF SIWood
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/23/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/31/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/31/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
05/31/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/26/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
02/25/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/12/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
01/13/2025HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
01/13/2025Maintenance informationStanislav Pilipenkoenergy_progress
01/13/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
01/13/2025Energy Code Compliance InspectionsStanislav Pilipenkoprogress
01/13/2025Ventilation and air distribution systemStanislav Pilipenkoenergy_progress
01/13/2025HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
01/13/2025HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
01/13/2025Duct leakage testing, insulation and designStanislav Pilipenkoenergy_progress
01/13/2025Permanent certificateStanislav Pilipenkoenergy_progress
01/11/2025Mechanical SystemsStanislav Pilipenkospecial
01/11/2025FinalStanislav Pilipenkoprogress
06/28/2024Footing and Foundationanthony santoroprogress
06/28/2024HVAC-R and service water heating equipmentanthony santoroenergy_progress
06/28/2024Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
06/28/2024HVAC-R and service water heating system controlsanthony santoroenergy_progress
06/28/2024Insulation placement and R valuesanthony santoroenergy_progress
06/28/2024HVAC-R and service water piping design and insulationanthony santoroenergy_progress
06/28/2024Air barrier — testing anthony santoroenergy_progress
06/28/2024Permanent certificateanthony santoroenergy_progress
06/28/2024Subsurface Investigations (Borings/Test Pits)anthony santorospecial
06/28/2024Interior lighting poweranthony santoroenergy_progress
06/28/2024Fenestration areasanthony santoroenergy_progress
06/28/2024Ventilation and air distribution systemanthony santoroenergy_progress
06/28/2024Fenestration air leakageanthony santoroenergy_progress
06/28/2024Meteringanthony santoroenergy_progress
Latest 25 of 39.
▾Documents — 38 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/20/2026S01073843-S4Request digital key ↗
08/20/2026S01073843-S3Request digital key ↗
08/20/2026S01073843-S2Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
08/27/2024540264257Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
08/15/2025540264257Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S01073843-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S01073843-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S01073843-I1Open ↗
▸Seals & Professional Certifications14
▸DOB NOWSpecial Inspector Seal & Signature5
08/28/2026S01073843-S4Open ↗
08/23/2026S01073843-I1Open ↗
08/23/2026S01073843-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/28/2026S01073843-S4Open ↗
08/28/2026S01073843-S4Open ↗
08/23/2026S01073843-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/20/2026S01073843-I1Open ↗
08/20/2026S01073843-S3Open ↗
08/20/2026S01073843-S2Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
06/25/2024540264257Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S01073843-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S01073843-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/15/2026S01073843-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S01073843-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S01073843-I1Open ↗
▸Inspections & Test Reports3
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
06/25/2024540264257Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S01073843-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026S01073843-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
08/27/2024540264257Open ↗
▸Other Documents6
▸BISWAIVER OF CURB ALIGNMENT1
08/27/2024540264257Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
08/27/2024540264257Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S01073843-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/15/2026S01073843-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S01073843-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S01073843-I1Open ↗