← Back
Elevator apt, fireproof without stores
Tompkins (NYCHA)
65 TOMPKINS AVENUE · BIN 3324250
💬 Discuss this project
1962Year Built
16Stories
D3Building Class
R6Zoning
800,000 sfGross Floor Area
1,046Units
LL97 Covered12 Open Violations 11 unresolved · 1 paperwork only ▸FISP: SWARMPFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 521,950 sf lot · 1.53 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA3007/08/2026
NYCHA 99403/22/2026
NYC HOUSING AUTHORITY2603/22/2026
ZORIA HOUSING103/22/2026
NEW YORK CITY HOUSING AUTHORITY403/22/2026
NYC HOUSING AUTH103/21/2026
TECHNICO CONST SERVICES103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOEL PHAGOO P.E. PLLC812/12/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JOEL PHAGOO P.E. PLLC103/21/2026
JOEL PHAGOO P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MNK ENTERPRISES LLCGeneral Contractor407/08/2026
NEELAM CONSTRUCTION CORPGeneral Contractor307/08/2026
ORTEGA-CEDENO, DAVIDElectrical203/21/2026
ANTHONY REALEElectrical203/21/2026
CHRYSSIADIS, NICOLASElectrical203/21/2026
SEGRETI JOSEPHElectrical103/21/2026
ABE HIMELFARBElectrical103/21/2026
VIKRANT CONTRACTING & BUILDERGeneral Contractor107/08/2026
ANZELM KRYSAElectrical103/21/2026
CARLTON ASPINALLElectrical103/21/2026
JOSEPH SEGRETIElectrical103/21/2026
MCGINLEY, KEVINElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOEL PHAGOO ,PE, PLLC2416401/19/2024
Building Lifecycle
All (93)Filed (9)Permit Issued (8)Signed Off (5)Facade (FISP) (17)Violation (50)Special Inspection (4)
10/25/2025
Violation issued (FDNY_NOV, closed)
10/25/2025
Violation issued (FDNY_NOV, closed)
05/28/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00878962-I1
05/28/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00795781-I1
05/17/2024
Signed off — Alteration
INSTALLATION OF MATERIAL HOIST FOR ROOF AND BULKHEAD REPAIRS.
B00993332-I1
05/14/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY PORTABLE MATERIAL HOIST AS PER PLANS. PORTABLE MATERIAL HOIST SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00970302-I1
05/14/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLANS. CHAIN LINK FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00795785-I1
03/07/2024
Permit issued — Suspended Scaffold
B00993332-I1-SC
02/21/2024
Violation issued (FDNY_NOV, closed)
02/21/2024
Violation issued (FDNY_NOV, closed)
01/23/2024
Permit issued — Suspended Scaffold
B00993332-I1-SC
01/19/2024
Filed — Alteration
INSTALLATION OF MATERIAL HOIST FOR ROOF AND BULKHEAD REPAIRS.
B00993332-I1
01/19/2024
Special inspection requirement — Post-installed Anchors
JOEL PHAGOO
12/14/2023
Special inspection requirement — Post-installed Anchors
JOEL PHAGOO
12/12/2023
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00878962-P2
12/11/2023
Special inspection requirement — Post-installed Anchors
JOEL PHAGOO
12/05/2023
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00878962-P1
12/05/2023
Permit issued — Protection and Mechanical Methods
B00970302-I1-PMM
12/04/2023
Filed — Alteration
INSTALLATION OF TEMPORARY PORTABLE MATERIAL HOIST AS PER PLANS. PORTABLE MATERIAL HOIST SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00970302-I1
12/04/2023
Special inspection requirement — Post-installed Anchors
JOEL PHAGOO
08/24/2023
Permit issued — Construction Fence
B00795785-I1-FN
07/12/2023
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00795781-P2
05/26/2023
Permit issued — Supported Scaffold
B00878962-I1-SF
05/25/2023
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00878962-I1
05/10/2023
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00795781-P1
05/09/2023
Permit issued — Sidewalk Shed
B00795781-I1-SH
02/10/2023
Cycle 9 facade report submitted
01/31/2023
Cycle 9 facade report signed — SWARMP
12/27/2022
Cycle 9 facade inspection completed
08/20/2022
Permit issued — Construction Fence
B00795785-I1-FN
08/19/2022
Permit issued — Sidewalk Shed
B00795781-I1-SH
08/18/2022
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00795781-I1
08/18/2022
Filed — Alteration
INSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLANS. CHAIN LINK FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00795785-I1
11/30/2018
Cycle 8 facade report submitted
11/22/2018
Cycle 8 facade report signed — SWARMP
10/15/2018
Violation issued (ECB, closed)
Local Law
10/02/2018
Cycle 8 facade inspection completed
09/24/2018
Violation issued (ECB, closed)
Boilers
09/24/2018
Violation issued (ECB, closed)
Boilers
09/24/2018
Violation issued (ECB, closed)
Boilers
07/31/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/26/2017
Violation issued (FDNY_NOV, closed)
07/07/2015
Violation issued (ECB, closed)
Construction
06/01/2015
Cycle 6 facade report submitted
06/01/2015
Cycle 7 facade report submitted
04/17/2015
Violation issued (FDNY_NOV, closed)
04/01/2015
Violation issued (ECB, closed)
Construction
04/01/2015
Violation issued (ECB, closed)
Construction
04/01/2015
Violation issued (ECB, closed)
Construction
04/01/2015
Violation issued (ECB, closed)
Construction
10/02/2014
Violation issued (ECB, closed)
Unknown
12/19/2013
Cycle 7 facade report submitted
12/19/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/06/2013
Cycle 7 facade report signed — UNSAFE
11/25/2013
Violation issued (FDNY_NOV, closed)
11/05/2013
Cycle 7 facade inspection completed
08/30/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/28/2012
Cycle 6 facade report submitted
11/12/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/30/2010
Violation issued (ECB, closed)
Elevators
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offD&N CONST & CONSULTNG INC03/07/2024
DOB NOWSuspended ScaffoldSigned-offD&N CONST & CONSULTNG INC01/23/2024
DOB NOWProtection and Mechanical MethodsSigned-offNEELAM CONSTRUCTION CORP12/05/2023
DOB NOWConstruction FenceSigned-offNEELAM CONSTRUCTION CORP08/24/2023
DOB NOWSupported ScaffoldSigned-offMNK ENTERPRISES LLC05/26/2023
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES LLC05/09/2023
DOB NOWConstruction FenceSigned-offNEELAM CONSTRUCTION CORP08/20/2022
DOB NOWSidewalk ShedSigned-offVIKRANT CONTRACTING & BUI08/19/2022
BISOTISSUEDNEELAM CONSTRUCTION CORP03/11/2024
BISOTISSUEDNEELAM CONSTRUCTION CORP07/27/2023
BISOTISSUEDNEELAM CONSTRUCTION CORP06/16/2023
BISSDISSUEDRICHARDS P AND H CO, INC02/13/2017
BISSDISSUEDRICHARDS P AND H CO, INC02/12/2016
BISOTISSUEDZORIA HOUSING, LLC11/03/2014
BISEQISSUEDZORIA HOUSING, LLC11/03/2014
BISEQISSUEDZORIA HOUSING, LLC08/04/2014
BISOTISSUEDZORIA HOUSING, LLC07/23/2014
BISEQISSUEDVIKRANT CONTRACTING & BUILDER07/22/2014
BISEQISSUEDVIKRANT CONTRACTING & BUILDER04/24/2014
BISEQISSUEDTECHNICO CONSTRUCTION02/21/2014
BISEQISSUEDTECHNICO CONSTRUCTION02/21/2013
BISEQISSUEDTECHNICO CONSTRUCTION02/23/2012
BISEQISSUEDTECHNICO CONSTRUCTION08/05/2011
BISPLISSUEDDYNAMIC CONTRACTING CORP03/11/2011
BISPLISSUEDDYNAMIC CONTRACTING CORP10/22/2009
BISOTISSUEDFRAMAN MECHANICAL INC03/23/2009
BISMHISSUEDFRAMAN MECHANICAL INC03/23/2009
BISMHISSUEDFRAMAN MECHANICAL INC04/03/2008
BISOTISSUEDFRAMAN MECHANICAL INC04/03/2008
BISFBISSUEDJACK PICCINI, INC03/26/2008
BISMHISSUEDFRAMAN MECHANICAL INC01/10/2008
BISOTISSUEDFRAMAN MECHANICAL INC03/15/2007
BISOTISSUEDFRAMAN MECHANICAL INC01/05/2007
BISEQISSUEDGOTHAM BRIDGING CO INC09/27/1999
BISOTISSUEDAQUA-X CONSERVATION, INC.06/13/1994
BISPLISSUEDASPRO MECHANICAL CONTRACTING INC03/29/1994
BISOTISSUEDASPRO CONTRACTING INC.03/29/1994
BISFSISSUEDAQUA-X CONSERVATION, INC.07/28/1993
BISPLISSUEDCODE MECHANICAL INC06/09/1992
BISFSISSUEDVACCARO PETROLEUN CORP06/09/1992
8 projects · most recent 09/15/2026
General Wiring
FiledStatusContractorScope
09/15/2026Permit IssuedN.Y.C. HOUSING AUTHORITY—
01/25/2023CompleteEMENAR ELECL SVCS CONSTGeneral Wiring
08/17/2022CompleteLIT MODE ELECL CONTG INC—
08/15/2022CompleteLIT MODE ELECL CONTG INCGeneral Wiring
06/29/2022Permit IssuedEIA ELECTRIC, INCGeneral Wiring
07/23/2019CompleteSEZEKCOL ELECTRIC INCGeneral Wiring
07/23/2019CompleteSEZEKCOL ELECTRIC INCGeneral Wiring
05/22/2019CompleteJ&H ELECTRICAL CONT INCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
01/19/2024Post-installed AnchorsJOEL PHAGOOspecial
12/14/2023Post-installed AnchorsJOEL PHAGOOspecial
12/11/2023Post-installed AnchorsJOEL PHAGOOspecial
12/04/2023Post-installed AnchorsJOEL PHAGOOspecial
▾Documents — 189 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/28/2026B00795785-I1Request digital key ↗
08/27/2026B00795781-P2Request digital key ↗
08/27/2026B00795781-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits40
▸BISWORK PERMIT APPLICATION19
06/16/2023321931139Open ↗
02/20/2016340327890Open ↗
12/19/2014340155566Open ↗
Showing 3 of 19 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION17
08/19/2024321931139Open ↗
02/08/2024321931139Open ↗
10/18/2019321931139Open ↗
Showing 3 of 17 on file for this type
▸BISTEMPORARY FENCE APPLICATION & PERMIT1
06/16/2023321931139Open ↗
▸BISSIDEWALK SHED APPLICATION & PERMIT1
06/16/2023321931139Open ↗
▸BISAPPROVED V5 FOR TRU0884BK23 IS REQUIRED PRIOR TO PERMIT1
06/15/2023321931139Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
06/15/2023321931139Open ↗
▸Seals & Professional Certifications44
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
06/07/2019321931139Open ↗
02/20/2016340327890Open ↗
08/06/2015340167394Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/28/2026B00795785-I1Open ↗
08/26/2026B00970302-I1Open ↗
08/26/2026B00878962-P1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
08/01/2014340171726Open ↗
07/28/2014340169873Open ↗
07/22/2014340155566Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
08/01/2014340171726Open ↗
07/28/2014340169873Open ↗
07/22/2014340155566Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
08/01/2014340171726Open ↗
07/28/2014340169873Open ↗
07/22/2014340155566Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B00878962-P2Open ↗
08/28/2026B00993332-I1Open ↗
08/24/2026B00878962-P1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
06/13/2014320924247Open ↗
08/15/2011320336962Open ↗
10/13/2009320080425Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
08/15/2011320336962Open ↗
10/13/2009320080425Open ↗
▸BISPC FULL REPORT1
12/12/2007310064907Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/08/2015340327890Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
12/03/2008310064907Open ↗
09/05/2008310064907Open ↗
12/12/2007310064907Open ↗
▸BISSCHEDULE B - PLUMBING1
10/13/2009320080425Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
06/07/2019321931139Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
04/12/2011320080425Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
06/07/2019321931139Open ↗
▸BISTenant Protection Plan and Notes1
06/07/2019321931139Open ↗
▸Environmental & Asbestos7
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
01/19/2016340327890Open ↗
08/01/2014340171726Open ↗
07/22/2014340155566Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
08/15/2011320336962Open ↗
▸BISASBESTOS INSPECTION REPORT1
12/12/2007310064907Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/13/2009320080425Open ↗
▸BISONE (1)ACP21 IS REQUIRED PRIOR TO SIGNOFF OF DEP APPLICATION TRU0884BK231
03/13/2025321931139Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
03/12/2025321931139Open ↗
03/12/2025321931139Open ↗
05/03/2024321931139Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/28/2019321931139Open ↗
06/07/2019321931139Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/12/2025321931139Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
07/21/2014340167394Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY10
03/12/2025321931139Open ↗
03/12/2025321931139Open ↗
03/12/2025321931139Open ↗
Showing 3 of 10 on file for this type
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION1
12/28/2007310064907Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
10/28/2019321931139Open ↗
▸Approvals, Objections & Sign-offs28
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter9
08/13/2026B00970302-I1Open ↗
08/13/2026B00993332-I1Open ↗
08/13/2026B00795785-I1Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
08/06/2015340167394Open ↗
08/06/2015340171726Open ↗
02/25/2014320336962Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
03/13/2025321931139Open ↗
08/06/2015340167394Open ↗
08/06/2015340171726Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
06/13/2014320924247Open ↗
08/15/2011320336962Open ↗
10/13/2009320080425Open ↗
Showing 3 of 4 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
01/05/2015340155566Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT9
06/07/2019321931139Open ↗
12/08/2015340327890Open ↗
08/06/2015340155566Open ↗
Showing 3 of 9 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
03/12/2025321931139Open ↗
▸Filing & Intake Forms18
▸BISADDITIONAL INFORMATION9
05/06/2024321931139Open ↗
10/28/2019321931139Open ↗
10/28/2019321931139Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
12/08/2015340327890Open ↗
08/01/2014340171726Open ↗
07/28/2014340169873Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET4
06/07/2019321931139Open ↗
06/13/2014320924247Open ↗
08/15/2011320336962Open ↗
Showing 3 of 4 on file for this type
▸Other Documents5
▸BISOP-4 - Special Report2
08/06/2015340155566Open ↗
08/06/2015340169873Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
01/19/2016340327890Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B00993332-I1Open ↗
▸DOB NOWCalculations1
08/13/2026B00993332-I1Open ↗