Two family brick
65 WEST 182 STREET
BRONX · BIN 2014520
💬 Discuss this project
1901Year Built
2Stories
B1Building Class
R7-1Zoning
2,480 sfGross Floor Area
2Units
Rent Stabilized4 Open Violations ▸
Two family brick · Owner of record: 65 MS LLC · 2,500 sf lot · 0.99 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire Protection
Floor 223p · 1 filing · 20 docs
Floor 123p · 1 filing · 20 docs
Basement25p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
H BUILDERS NYC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/05/2024$984K—— → —$397/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIKOLAI KATZ ARCHITECT311/28/2025
VASILIOS ARTEMIOU PE311/26/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
H BUILDERS NYC LLCGeneral Contractor507/08/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH SHUVO ENGINEERIN8524111/28/2025
HRF SERVICES CORP5616502/12/2025
Building Lifecycle
All (59)Filed (6)Permit Issued (5)Signed Off (5)Violation (6)Inspection (7)Special Inspection (30)
04/24/2026
Violation issued (HPD, closed)
C
03/19/2026
Signed off — Alteration CO
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01116588-I1
X01116588-I1
12/24/2025
Signed off — Alteration CO
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01116588-I1
X01116588-S5
12/22/2025
Permit issued — Structural
X01116588-S5-ST
11/28/2025
Filed — Alteration CO
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01116588-I1
X01116588-S5
09/21/2025
Violation issued (HPD, closed)
C
09/21/2025
Violation issued (HPD, open)
C
09/21/2025
Violation issued (HPD, open)
C
04/07/2025
Signed off — Alteration CO
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01116588-I1
X01116588-S1
03/31/2025
Signed off — Alteration CO
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01116588-I1
X01116588-S3
03/21/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/19/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/11/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/06/2025
Signed off — Alteration CO
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01116588-I1
X01116588-S2
02/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
02/26/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
02/26/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
02/26/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
02/26/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
02/26/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
02/26/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
02/26/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
02/26/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
02/26/2025
Special inspection requirement — Permanent certificate
FAHAD FATEH
02/26/2025
Special inspection requirement — Metering
FAHAD FATEH
02/26/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
02/12/2025
Filed — Alteration CO
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01116588-I1
X01116588-P2
02/10/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
01/21/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
01/03/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/23/2024
Permit issued — Plumbing
X01116588-S1-PL
12/19/2024
Permit issued — Sprinklers
X01116588-S3-EW-SP
12/16/2024
Permit issued — Mechanical Systems
X01116588-S2-MS
12/12/2024
Permit issued — General Construction
X01116588-I1-GC
11/26/2024
Filed — Alteration CO
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01116588-I1
X01116588-S3
11/25/2024
Filed — Alteration CO
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01116588-I1
X01116588-S1
11/25/2024
Filed — Alteration CO
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01116588-I1
X01116588-S2
11/25/2024
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
11/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
11/25/2024
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
11/25/2024
Special inspection requirement — Final
FAHAD FATEH
11/25/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
11/25/2024
Special inspection requirement — Permanent certificate
FAHAD FATEH
11/25/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
11/25/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
11/25/2024
Special inspection requirement — Ventilation and air distribution system
FAHAD FATEH
11/25/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
11/25/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
11/25/2024
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
11/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
11/25/2024
Special inspection requirement — Mechanical Systems
FAHAD FATEH
11/22/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
11/22/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
11/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
11/22/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
09/25/2024
Filed — Alteration CO
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01116588-I1
X01116588-I1
12/27/2012
Violation issued (HPD, open)
C
12/27/2012
Violation issued (HPD, open)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offH BUILDERS NYC LLC12/22/2025
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN12/23/2024
DOB NOWSprinklersSigned-offA M B MECHANICAL INC12/19/2024
DOB NOWMechanical SystemsSigned-offH BUILDERS NYC LLC12/16/2024
DOB NOWGeneral ConstructionPermit IssuedH BUILDERS NYC LLC12/12/2024
1 project · most recent 11/28/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
11/28/2025Signed-offH BUILDERS NYC LLCHeating and Air Conditioning Systems
Heat / Cool
Daikin RXF18AXVJU 20,000 BTU · Heat Pump Outdoor ×7
2MXM18AVJU9 18,900 BTU · Heat Pump Outdoor ×2
4MXM36AVJU9 36,000 BTU · Heat Pump Outdoor ×1
1 project · most recent 11/28/2025
Sprinkler System
FiledStatusContractorScope
11/28/2025Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 11/28/2025
Storm Water/Sanitary
FiledStatusContractorScope
11/28/2025Signed-offPRIME PIPING & HEATING INStorm, Water/Sanitary
2 projects · most recent 12/12/2024
General Wiring
FiledStatusContractorScope
12/12/2024CompleteHIVOLTS ELECTRICAL INCGeneral Wiring
12/12/2024CompleteHIVOLTS ELECTRICAL INC—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
03/21/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/19/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/10/2025Fail-Final CND-Occupancy InspectionFailView ↗
01/21/2025Fail-Final CND-Occupancy InspectionFailView ↗
01/03/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
02/26/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
02/26/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
02/26/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
02/26/2025Fenestration areasFAHAD FATEHenergy_progress
02/26/2025Maintenance informationFAHAD FATEHenergy_progress
02/26/2025Fenestration air leakageFAHAD FATEHenergy_progress
02/26/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
02/26/2025Interior lighting powerFAHAD FATEHenergy_progress
02/26/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
02/26/2025Permanent certificateFAHAD FATEHenergy_progress
02/26/2025MeteringFAHAD FATEHenergy_progress
02/26/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
11/25/2024Post-installed AnchorsFAHAD FATEHspecial
11/25/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
11/25/2024Post-installed AnchorsFAHAD FATEHspecial
11/25/2024FinalFAHAD FATEHprogress
11/25/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
11/25/2024Permanent certificateFAHAD FATEHenergy_progress
11/25/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
11/25/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
11/25/2024Ventilation and air distribution systemFAHAD FATEHenergy_progress
11/25/2024Maintenance informationFAHAD FATEHenergy_progress
11/25/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
11/25/2024Sprinkler SystemsFAHAD FATEHspecial
11/25/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
Latest 25 of 31.
▾Documents — 35 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/20/2026X01116588-S5Request digital key ↗
08/20/2026X01116588-P2Request digital key ↗
08/20/2026X01116588-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/20/2026X01116588-S5Open ↗
08/20/2026X01116588-P2Open ↗
08/20/2026X01116588-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/26/2026X01116588-I1Open ↗
08/26/2026X01116588-I1Open ↗
08/26/2026X01116588-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/31/2026X01116588-S3Open ↗
08/26/2026X01116588-I1Open ↗
08/26/2026X01116588-S1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/20/2026X01116588-P2Open ↗
08/20/2026X01116588-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X01116588-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X01116588-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X01116588-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/20/2026X01116588-S5Open ↗
08/20/2026X01116588-P2Open ↗
08/20/2026X01116588-S3Open ↗
Showing 3 of 6 on file for this type
▸Other Documents3
▸DOB NOWProperty Ownership Certification2
08/20/2026X01116588-P2Open ↗
08/20/2026X01116588-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026X01116588-I1Open ↗