BROOKLYN
650 86 STREET
BROOKLYN · BIN 3153881
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
ArchitectureElectricalMechanicalEquipmentGeneral
Roof4p · 3 filings · 20 docs
Bulkhead1p · 1 filing · 10 docs
Floor 52p · 2 filings · 18 docs
Floor 41p · 1 filing · 8 docs
Floor 31p · 1 filing · 8 docs
Floor 21p · 1 filing · 8 docs
Floor 11p · 1 filing · 8 docs
Cellar1p · 1 filing · 8 docs
Basement1p · 1 filing · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY6507/08/2026
DOE303/22/2026
NYCSCA103/21/2026
SYNERGIC DESIGN ARCHITECTS103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PJP INSTALLERS INCGeneral Contractor1007/08/2026
E.W. HOWELL CO, LLCGeneral Contractor907/08/2026
STARR INDUSTRIES LLCGeneral Contractor507/08/2026
GIAQUINTO MASONRY INCGeneral Contractor407/08/2026
RAEL AUTOMATIC SPR. CO.INFire Protection307/08/2026
ACCORD POWER INCGeneral Contractor203/21/2026
RAEL AUTOMATIC SPR.CO INCFire Protection107/08/2026
MULTI-PHASE ELEC'L SVCSElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SYNERGIC DESIGN LLC8561208/21/2024
FUTURE TECH CONSULTANTS O589912/04/2023
Building Lifecycle
All (108)Filed (26)Permit Issued (24)Signed Off (9)Violation (4)Inspection (2)Objection (18)Special Inspection (25)
12/29/2025
Signed off — Alteration
IS 322K Support of Excavation at existing building.
B00683164-I1
11/03/2025
Violation issued (FDNY_NOV, closed)
09/30/2025
Signed off — Alteration
SIDEWALK SHED FOR PROTECTION OF PUBLIC IN CONJUNCTION WITH JOB # 322053148
B00772628-S3
09/23/2025
Signed off — Alteration
PS 322K- FILING FOR TEMPORARY STANDPIPE DURING CONSTRUCTION IN CONJUNCTION WITH NEW BUILDING DOB# 322053148
B00726136-I1
09/22/2025
Signed off — Alteration
SOE/IS322K - FOR TEMPORARY SUPPORT OF EXCAVATION, SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH DOB # 322053148 NO CHANGE IN USE, OCCUPANCY OR EGRESS
B00847864-I1
06/13/2025
Permit issued — Standpipe
B00726136-I1-EW-SD
03/19/2025
Signed off — Alteration
Install 34.485 KW DC solar PV on a school flat roof. No Change of occupancy, use or egress.
B00994046-I1
10/02/2024
Signed off — Alteration
SIDEWALK SHED FOR PROTECTION OF PUBLIC IN CONJUNCTION WITH JOB # 322053148
B00772628-I1
10/02/2024
Signed off — Alteration
SIDEWALK SHED FOR PROTECTION OF PUBLIC IN CONJUNCTION WITH JOB # 322053148
B00772628-S1
08/23/2024
Permit issued — Solar
B00994046-I1-SL
08/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Malathi Ananthakrishnan
08/23/2024
Special inspection requirement — Air barrier - visual inspection
Malathi Ananthakrishnan
08/23/2024
Special inspection requirement — Energy Code Compliance Inspections
Malathi Ananthakrishnan
08/23/2024
Special inspection requirement — Final
Malathi Ananthakrishnan
08/23/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Malathi Ananthakrishnan
08/21/2024
Filed — Alteration
Install 34.485 KW DC solar PV on a school flat roof. No Change of occupancy, use or egress.
B00994046-P1
08/21/2024
Inspection — Pass-Final SD - Up to 9 Requested Floors
Pass
View inspection ↗
08/21/2024
Special inspection requirement — Air barrier - visual inspection
Malathi Ananthakrishnan
08/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Malathi Ananthakrishnan
08/21/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Malathi Ananthakrishnan
08/21/2024
Special inspection requirement — Energy Code Compliance Inspections
Malathi Ananthakrishnan
08/21/2024
Special inspection requirement — Final
Malathi Ananthakrishnan
07/25/2024
Permit issued — Standpipe
B00726136-I1-EW-SD
06/27/2024
Signed off — Alteration
IS 322 - Installation of supported scaffold in elevator shaft as per plans filed herewith.
B00737933-I1
02/21/2024
Filed — Alteration
Install 34.485 KW DC solar PV on a school flat roof. No Change of occupancy, use or egress.
B00994046-I1
02/09/2024
Permit issued — Support of Excavation
B00847864-I1-SE
01/30/2024
Permit issued — Construction Fence
B00658096-I1-FN
12/08/2023
Objection resolved — Addressed
12/06/2023
Objection raised — Other
12/04/2023
Filed — Alteration
SOE/IS322K - FOR TEMPORARY SUPPORT OF EXCAVATION, SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH DOB # 322053148 NO CHANGE IN USE, OCCUPANCY OR EGRESS
B00847864-I1
11/30/2023
Filed — Alteration
SIDEWALK SHED FOR PROTECTION OF PUBLIC IN CONJUNCTION WITH JOB # 322053148
B00772628-P8
11/21/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Noel Tolentino
11/06/2023
Permit issued — Protection and Mechanical Methods
B00772628-I1-PM
10/31/2023
Permit issued — General Construction
B00772628-S3-GC
10/27/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Noel Tolentino
10/27/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Noel Tolentino
10/18/2023
Objection raised — Other
10/18/2023
Objection resolved — Addressed
10/11/2023
Filed — Alteration
FN/IS322K - FOR TEMPORARY CONSTRUCTION EQUIPMENT(FENCE) SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH DOB JOB #322053148 . NO CHANGE IN USE, OCCUPANCY OR EGRESS
B00658096-P4
10/05/2023
Filed — Alteration
IS 322K Support of Excavation at existing building.
B00683164-P2
10/03/2023
Filed — Alteration
SIDEWALK SHED FOR PROTECTION OF PUBLIC IN CONJUNCTION WITH JOB # 322053148
B00772628-P6
09/29/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Noel Tolentino
09/29/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Noel Tolentino
09/13/2023
Special inspection requirement — Final
Michael Marchese
09/13/2023
Special inspection requirement — Concrete - Cast-In-Place
Noel Tolentino
09/08/2023
Permit issued — Protection and Mechanical Methods
B00683164-I1-PM-SE
09/07/2023
Permit issued — Sidewalk Shed
B00772628-S1-SH
08/31/2023
Filed — Alteration
SIDEWALK SHED FOR PROTECTION OF PUBLIC IN CONJUNCTION WITH JOB # 322053148
B00772628-P5
08/30/2023
Special inspection requirement — Final
Michael Marchese
08/30/2023
Special inspection requirement — Concrete - Cast-In-Place
Noel Tolentino
07/28/2023
Permit issued — Standpipe
B00726136-I1-EW-SD
06/15/2023
Filed — Alteration
SIDEWALK SHED FOR PROTECTION OF PUBLIC IN CONJUNCTION WITH JOB # 322053148
B00772628-P4
06/13/2023
Permit issued — Supported Scaffold
B00737933-I1-SF
06/13/2023
Special inspection requirement — Final
Michael Marchese
06/13/2023
Special inspection requirement — Concrete - Cast-In-Place
Noel Tolentino
03/29/2023
Permit issued — Supported Scaffold
B00737933-I1-SF
03/08/2023
Filed — Alteration
SIDEWALK SHED FOR PROTECTION OF PUBLIC IN CONJUNCTION WITH JOB # 322053148
B00772628-P2
03/08/2023
Filed — Alteration
SIDEWALK SHED FOR PROTECTION OF PUBLIC IN CONJUNCTION WITH JOB # 322053148
B00772628-P3
02/22/2023
Special inspection requirement — Final
Michael Marchese
02/22/2023
Special inspection requirement — Concrete - Cast-In-Place
Noel Tolentino
Latest 60 of 108 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStandpipeSigned-offRAEL AUTOMATIC SPR.CO INC06/13/2025
DOB NOWSolarSigned-offACCORD POWER INC08/23/2024
DOB NOWStandpipeSigned-offRAEL AUTOMATIC SPR. CO.IN07/25/2024
DOB NOWSupport of ExcavationSigned-offE.W. HOWELL CO, LLC02/09/2024
DOB NOWConstruction FencePermit IssuedE.W. HOWELL CO, LLC01/30/2024
DOB NOWProtection and Mechanical MethodsSigned-offPJP INSTALLERS INC11/06/2023
DOB NOWGeneral ConstructionSigned-offPJP INSTALLERS INC10/31/2023
DOB NOWProtection and Mechanical MethodsSigned-offE.W. HOWELL CO, LLC09/08/2023
DOB NOWSidewalk ShedSigned-offPJP INSTALLERS INC09/07/2023
DOB NOWStandpipeSigned-offRAEL AUTOMATIC SPR. CO.IN07/28/2023
DOB NOWSupported ScaffoldSigned-offGIAQUINTO MASONRY INC06/13/2023
DOB NOWSupported ScaffoldSigned-offGIAQUINTO MASONRY INC03/29/2023
DOB NOWConstruction FencePermit IssuedE.W. HOWELL CO, LLC02/15/2023
DOB NOWGeneral ConstructionSigned-offPJP INSTALLERS INC11/03/2022
DOB NOWProtection and Mechanical MethodsSigned-offPJP INSTALLERS INC11/02/2022
DOB NOWSidewalk ShedSigned-offPJP INSTALLERS INC09/21/2022
DOB NOWProtection and Mechanical MethodsSigned-offE.W. HOWELL CO, LLC09/07/2022
DOB NOWStandpipeSigned-offRAEL AUTOMATIC SPR. CO.IN08/02/2022
DOB NOWSupported ScaffoldSigned-offGIAQUINTO MASONRY INC07/20/2022
DOB NOWSupport of ExcavationSigned-offE.W. HOWELL CO, LLC05/26/2022
DOB NOWConstruction FencePermit IssuedE.W. HOWELL CO, LLC02/25/2022
DOB NOWConstruction FenceSigned-offSTARR INDUSTRIES LLC06/16/2021
DOB NOWConstruction FenceSigned-offSTARR INDUSTRIES LLC05/27/2021
DOB NOWConstruction FencePermit IssuedSTARR INDUSTRIES LLC05/11/2021
BIS—ISSUEDE.W. HOWELL CO, LLC03/25/2026
BIS—ISSUEDE.W. HOWELL CO, LLC02/04/2026
BISSDISSUEDRAEL AUTOMATIC SPR. CO.IN05/02/2025
BIS—ISSUEDE.W. HOWELL CO, LLC04/04/2025
BISPLISSUEDFRANCO BELLI PLMG&HTG SON05/21/2024
BISPLISSUEDFRANCO BELLI PLMG&HTG SON05/21/2024
BISSDISSUEDRAEL AUTOMATIC SPR. CO.IN05/07/2024
BIS—ISSUEDE.W. HOWELL CO, LLC04/02/2024
BIS—ISSUEDE.W. HOWELL CO, LLC03/12/2024
BIS—ISSUEDE.W. HOWELL CO, LLC03/11/2024
BISPLISSUEDFRANCO BELLI PLMG&HTG SON05/30/2023
BISPLISSUEDFRANCO BELLI PLMG&HTG SON05/30/2023
BISSDISSUEDRAEL AUTOMATIC SPR. CO.IN05/10/2023
BIS—ISSUEDE.W. HOWELL CO, LLC03/29/2023
BIS—ISSUEDE.W. HOWELL CO, LLC03/27/2023
BIS—ISSUEDE.W. HOWELL CO, LLC11/17/2022
+ 15 more permits on file
8 projects · most recent 03/19/2024
General Wiring
FiledStatusContractorScope
03/19/2024CompleteMULTI-PHASE ELEC'L SVCS1 meters, 1 new_meters
02/23/2024CompleteMULTI-PHASE ELEC'L SVCS—
09/20/2022CompleteMULTI-PHASE ELEC'L SVCSGeneral Wiring
07/14/2022CompleteMULTI-PHASE ELEC'L SVCS—
07/14/2022CompleteMULTI-PHASE ELEC'L SVCS—
05/16/2022CompleteINLIGHT ELECTRICAL CORP1 meters, 1 new_meters
03/30/2022CompleteMULTI-PHASE ELEC'L SVCS—
03/30/2022CompleteMULTI-PHASE ELEC'L SVCS—
1 project · most recent 10/11/2023
Fence
FiledStatusContractorScope
10/11/2023Permit IssuedE.W. HOWELL CO, LLCFence
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/21/2024Pass-Final SD - Up to 9 Requested FloorsPassView ↗
12/22/2021Pass-Final Fence Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
08/23/2024Fire-Resistant Penetrations and JointsMalathi Ananthakrishnanspecial
08/23/2024Air barrier - visual inspectionMalathi Ananthakrishnanenergy_progress
08/23/2024Energy Code Compliance InspectionsMalathi Ananthakrishnanprogress
08/23/2024FinalMalathi Ananthakrishnanprogress
08/23/2024Structural Stability – Alterations of existing buildingsMalathi Ananthakrishnanspecial
08/21/2024Air barrier - visual inspectionMalathi Ananthakrishnanenergy_progress
08/21/2024Fire-Resistant Penetrations and JointsMalathi Ananthakrishnanspecial
08/21/2024Structural Stability – Alterations of existing buildingsMalathi Ananthakrishnanspecial
08/21/2024Energy Code Compliance InspectionsMalathi Ananthakrishnanprogress
08/21/2024FinalMalathi Ananthakrishnanprogress
11/21/2023Excavations - Sheeting, Shoring, and BracingNoel Tolentinospecial
10/27/2023Excavations - Sheeting, Shoring, and BracingNoel Tolentinospecial
10/27/2023Structural Stability – Alterations of existing buildingsNoel Tolentinospecial
09/29/2023Excavations - Sheeting, Shoring, and BracingNoel Tolentinospecial
09/29/2023Structural Stability – Alterations of existing buildingsNoel Tolentinospecial
09/13/2023FinalMichael Marcheseprogress
09/13/2023Concrete - Cast-In-PlaceNoel Tolentinospecial
08/30/2023FinalMichael Marcheseprogress
08/30/2023Concrete - Cast-In-PlaceNoel Tolentinospecial
06/13/2023FinalMichael Marcheseprogress
06/13/2023Concrete - Cast-In-PlaceNoel Tolentinospecial
02/22/2023FinalMichael Marcheseprogress
02/22/2023Concrete - Cast-In-PlaceNoel Tolentinospecial
04/26/2022Standpipe SystemsNoel Tolentinospecial
01/24/2022Public Assembly Emergency LightingMichael Marcheseprogress
▾Documents — 208 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch24
09/01/2026B00520090-I1Request digital key ↗
08/30/2026B00683164-P1Request digital key ↗
08/29/2026B00737933-I1Request digital key ↗
Showing 3 of 24 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
08/31/2026B00667571-I1Request digital key ↗
08/31/2026B00667466-I1Request digital key ↗
▸Applications & Permits2
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
08/19/2024322053148Open ↗
▸BISPLACE OF ASSEMBLY1
01/13/2010320109592Open ↗
▸Seals & Professional Certifications51
▸DOB NOWDPL-1: Design Professional Seal & Signature26
08/31/2026B00667571-I1Open ↗
08/31/2026B00667466-I1Open ↗
08/30/2026B00683164-P2Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/30/2026B00683164-P2Open ↗
09/05/2026B00994046-P1Open ↗
09/05/2026B00994046-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/05/2026B00994046-P1Open ↗
09/05/2026B00994046-P1Open ↗
09/05/2026B00994046-P1Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY-CERTIFICATION2
04/12/2010320109592Open ↗
10/27/2010320109592Open ↗
▸Safety & Tenant Protection12
▸DOB NOWNYCSCA - Approved Site Safety Plans12
08/29/2026B00737933-I1Open ↗
08/28/2026B00772628-S1Open ↗
08/13/2026B00658096-I1Open ↗
Showing 3 of 12 on file for this type
▸Environmental & Asbestos11
▸DOB NOWOER: Notice of Satisfaction3
08/28/2026B00772628-S3Open ↗
08/15/2026B00683164-I1Open ↗
08/13/2026B00847864-I1Open ↗
▸DOB NOWOER: Notice to Proceed3
08/15/2026B00683164-P2Open ↗
08/15/2026B00683164-I1Open ↗
08/13/2026B00847864-I1Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
05/13/2022322054138Open ↗
11/09/2021322053148Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
02/06/2025322053148Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICEOF NO OBJECTIONS1
08/01/2024322053148Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
01/13/2010320109592Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/24/2025322053148Open ↗
03/17/2025322053148Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
05/01/2023322053148Open ↗
05/01/2023322053148Open ↗
05/01/2023322053148Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/24/2025322053148Open ↗
03/17/2025322053148Open ↗
▸Approvals, Objections & Sign-offs58
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter26
08/31/2026B00667571-I1Open ↗
08/31/2026B00667466-I1Open ↗
08/30/2026B00683164-P1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)22
08/30/2026B00683164-P1Open ↗
08/29/2026B00737933-I1Open ↗
08/28/2026B00772628-S3Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)8
08/29/2026B00737933-I1Open ↗
08/28/2026B00772628-I1Open ↗
08/28/2026B00772628-S1Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/27/2010320109592Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B00994046-I1Open ↗
▸Other Documents41
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal24
08/31/2026B00667466-I1Open ↗
08/30/2026B00683164-P1Open ↗
08/29/2026B00737933-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWNYCSCA Exhibit 28
08/29/2026B00737933-I1Open ↗
08/28/2026B00772628-I1Open ↗
08/28/2026B00772628-S3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/15/2026B00683164-I1Open ↗
08/13/2026B00847864-I1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
11/29/2024322053148Open ↗
▸BISAPPROVED TOPO DOCUMENTS ARE TO REFLECT IN THE VIRTUAL FOLDER PRIOR TO NEXT TCO RENEWAL.1
11/25/2024322053148Open ↗
▸DOB NOWAlternate Plan 21
08/31/2026B00667466-I1Open ↗
▸DOB NOWAlternate Plan 51
08/31/2026B00667466-I1Open ↗
▸DOB NOWAlternate Plan 41
08/31/2026B00667466-I1Open ↗
▸DOB NOWAlternate Plan 11
08/31/2026B00667466-I1Open ↗
▸DOB NOWAlternate Plan 31
08/31/2026B00667466-I1Open ↗