Elevator apt, semi-fireproof without stores
Bethune Towers
650 LENOX AVENUE · BIN 1053943
💬 Discuss this project
1970Year Built
15Stories
D1Building Class
R7-2Zoning
129,386 sfGross Floor Area
134Units
LL97 CoveredRent Stabilized39 Active Violations 18 unresolved · 21 paperwork only 6 old, status unconfirmed ▸FISP: UNSAFE
Elevator apt, semi-fireproof without stores · Owner of record: Bethune Towers · 21,900 sf lot · 5.91 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire ProtectionEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofDalton Management CO.Under Construction2p · 2 filings · 5 docs
Floor 1Sidewalk shed installation4p · 1 filing · 4 docs
CellarDalton Management CO.2p · 2 filings · 7 docs
Site & exteriorDalton Management CO.Under Construction9p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Bethune Tower603/22/2026
New York City Mission Society103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EDG307/29/2026
Always Fast Services110/03/2025
Haider Engineering, P.E111/28/2017
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LMS-Ace Services203/21/2026
Haider Engineering, P.E103/21/2026
Lombardo Building Consultants103/21/2026
Haider Engineering P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Pyramid Restoration NYspecialty_contractor807/08/2026
Platinum Services NYScaffold410/07/2026
BrenmacScaffold207/08/2026
WCK ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Lombardo Prof Engineering8566204/22/2026
Building Consulting Engineering1034207/30/2024
EDG2578207/30/2024
Building Lifecycle
All (107)Filed (8)Permit Issued (14)Signed Off (1)Facade (FISP) (16)Violation (60)Objection (1)Special Inspection (7)
10/06/2026
Permit issued — Sidewalk Shed
M01291540-I1-SH
08/19/2026
Violation issued (HPD, open)
A
08/19/2026
Violation issued (HPD, open)
A
08/06/2026
Permit issued — Suspended Scaffold
M01415870-I1-SC
07/30/2026
Violation issued (HPD, open)
B
07/29/2026
Filed — Alteration
Garage repairs on the cellar floor and garage roof as shown on the drawings filed herewith. No change in use, egress, or occupancy.
M01367389-I1
07/07/2026
Violation issued (ECB, open)
Elevators
06/30/2026
Objection raised — Other
06/23/2026
Violation issued (HPD, open)
C
06/23/2026
Violation issued (HPD, open)
B
06/23/2026
Violation issued (HPD, open)
A
06/23/2026
Violation issued (HPD, open)
A
06/23/2026
Violation issued (HPD, open)
B
06/23/2026
Violation issued (HPD, open)
A
06/23/2026
Violation issued (HPD, open)
A
06/23/2026
Violation issued (HPD, open)
A
06/22/2026
Filed — Alteration
inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Brian Barco
M01415870-I1
05/04/2026
Special inspection requirement — Post-installed Anchors
Michael Lombardo
05/04/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Michael Lombardo
04/29/2026
Violation issued (HPD, closed)
A
04/22/2026
Filed — Alteration
M01024721-P1
04/22/2026
Violation issued (HPD, closed)
B
04/22/2026
Violation issued (HPD, closed)
B
04/22/2026
Special inspection requirement — Post-installed Anchors
Michael Lombardo
04/22/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Michael Lombardo
12/04/2025
Permit issued — Suspended Scaffold
M01024721-I1-SC
11/24/2025
Cycle 9 facade report submitted
11/24/2025
Cycle 9 facade inspection completed
11/24/2025
Cycle 9 facade report signed — UNSAFE
10/23/2025
Permit issued — General Construction
M00783359-I1-GC
10/06/2025
Permit issued — Sidewalk Shed
M01291540-I1-SH
10/03/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01291540-I1
09/11/2025
Permit issued — Structural
M01087317-I1-ST
07/05/2025
Violation issued (HPD, closed)
C
06/04/2025
Violation issued (HPD, closed)
A
04/24/2025
Permit issued — Suspended Scaffold
M01024721-I1-SC
03/22/2025
Violation issued (ECB, open)
Construction
02/13/2025
Permit issued — General Construction
M00783359-I1-GC
11/26/2024
Cycle 9 facade report signed — UNSAFE
11/25/2024
Cycle 9 facade report submitted
11/04/2024
Violation issued (HPD, open)
B
10/22/2024
Cycle 9 facade inspection completed
09/19/2024
Violation issued (ECB, open)
Elevators
09/19/2024
Violation issued (ECB, closed)
Elevators
09/06/2024
Permit issued — Structural
M01087317-I1-ST
08/08/2024
Permit issued — Structural
M01087317-I1-ST
08/06/2024
Permit issued — General Construction
M00783359-I1-GC
07/30/2024
Filed — Alteration
INSTALLATION OF TEMPORARY SHORING AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01087317-I1
07/27/2024
Special inspection requirement — Final
Anthony Stasio
07/27/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Stasio
07/27/2024
Special inspection requirement — Tenant Protection Plan Compliance
TONY ONYEAGORO
05/22/2024
Violation issued (HPD, closed)
A
05/22/2024
Violation issued (HPD, closed)
A
05/22/2024
Violation issued (HPD, closed)
A
05/22/2024
Violation issued (HPD, closed)
C
05/22/2024
Violation issued (HPD, closed)
A
04/09/2024
Permit issued — Suspended Scaffold
M01024721-I1-SC
04/07/2024
Violation issued (HPD, closed)
C
04/07/2024
Violation issued (HPD, closed)
B
04/07/2024
Violation issued (HPD, closed)
B
Latest 60 of 107 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY10/06/2026
DOB NOWSuspended ScaffoldPermit IssuedStreamline Consultants NY08/06/2026
DOB NOWSuspended ScaffoldPermit IssuedStreamline Consultants NY12/04/2025
DOB NOWGeneral ConstructionPermit IssuedPyramid Restoration NY10/23/2025
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY10/06/2025
DOB NOWStructuralPermit IssuedPyramid Restoration NY09/11/2025
DOB NOWSuspended ScaffoldPermit IssuedStreamline Consultants NY04/24/2025
DOB NOWGeneral ConstructionPermit IssuedPyramid Restoration NY02/13/2025
DOB NOWStructuralPermit IssuedPyramid Restoration NY09/06/2024
DOB NOWStructuralPermit IssuedPyramid Restoration NY08/08/2024
DOB NOWGeneral ConstructionPermit IssuedPyramid Restoration NY08/06/2024
DOB NOWSuspended ScaffoldPermit IssuedStreamline Consultants NY04/09/2024
DOB NOWSidewalk ShedSigned-offBrenmac04/23/2018
DOB NOWSidewalk ShedSigned-offBrenmac11/28/2017
BISOTISSUEDFast Track Electric02/04/2020
BISOTISSUEDRomo Construction04/19/2018
BISOTISSUEDRomo Construction06/07/2017
BISEQISSUEDBrenmac11/25/2016
BISMHISSUEDAdmore Air Conditioning08/04/2008
BISOTISSUEDArete Development08/27/2007
BISEQISSUEDSteel Industries06/13/2007
BISFBISSUEDC C Controlled Combustion05/07/2007
BISSDISSUEDRael Automatic Sprinkler Co01/10/1991
2 projects · most recent 10/07/2025
FiledStatusContractorScope
10/07/2025Permit IssuedRichard Neu—
12/20/2022Permit IssuedRobert Chimenti3 meters, 1 new_meters
2 projects · most recent 07/29/2026
Concrete
FiledStatusContractorScope
07/29/2026——Concrete
07/30/2024Permit IssuedPyramid Restoration NY1 scope_items
1 project · most recent 10/03/2025
Sidewalk Shed
FiledStatusContractorScope
10/03/2025Permit IssuedPlatinum Services NYSidewalk Shed
1 project · most recent 06/22/2026
FiledStatusContractorScope
06/22/2026Permit IssuedStreamline Consultants NY—
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
05/04/2026Post-installed AnchorsMichael Lombardospecial
05/04/2026Alternative Materials - OTCR Buildings Bulletin NumberMichael Lombardospecial
04/22/2026Post-installed AnchorsMichael Lombardospecial
04/22/2026Alternative Materials - OTCR Buildings Bulletin NumberMichael Lombardospecial
07/27/2024FinalAnthony Stasioprogress
07/27/2024Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
07/27/2024Tenant Protection Plan ComplianceTONY ONYEAGOROspecial
▾Documents — 93 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
09/06/2026M00003140-I1Request digital key ↗
08/27/2026M00783359-I1Request digital key ↗
08/26/2026M01087317-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits13
▸BISPLAN / WORK APPROVAL APPLICATION8
01/28/2020123797953Open ↗
12/19/2017122915202Open ↗
12/19/2017122915202Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION5
02/04/2020123797953Open ↗
04/23/2018122963132Open ↗
06/19/2017122963132Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications27
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
02/04/2020123797953Open ↗
01/25/2019122963132Open ↗
01/25/2019122963132Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026M01024721-P1Open ↗
09/01/2026M01024721-P1Open ↗
08/24/2026M01024721-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/06/2026M00003140-I1Open ↗
08/27/2026M00783359-I1Open ↗
08/26/2026M01087317-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
11/30/2016122915202Open ↗
11/23/2016140577150Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
11/30/2016122915202Open ↗
08/01/2008110307221Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/23/2016140577150Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/23/2016140577150Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/01/2008110307221Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/24/2026M01087317-I1Open ↗
▸Trade Schedules & Equipment2
▸BISEQUIPMENT USE PERMITS1
03/01/2010110307221Open ↗
▸BISEQUIPMENT USE APPLICATION-PERMIT1
03/01/2010110307221Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes4
01/28/2020123797953Open ↗
01/05/2017122963132Open ↗
11/30/2016122915202Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
01/28/2020123797953Open ↗
01/05/2017122963132Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/01/2008110307221Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/27/2026M00783359-I1Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
02/04/2020123797953Open ↗
03/02/2017122963132Open ↗
01/05/2017122963132Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
01/25/2019122963132Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
11/23/2016140577150Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
11/23/2016140577150Open ↗
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
01/25/2019122963132Open ↗
03/16/2010110307221Open ↗
03/16/2010110307221Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
09/06/2026M00003140-I1Open ↗
08/13/2026M01291540-I1Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
08/01/2008110307221Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
01/28/2020123797953Open ↗
01/25/2019122963132Open ↗
01/05/2017122963132Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms9
▸BISEFILING COVER SHEET3
01/28/2020123797953Open ↗
01/05/2017122963132Open ↗
11/30/2016122915202Open ↗
▸BISADDITIONAL INFORMATION2
12/19/2017122915202Open ↗
12/19/2017122915202Open ↗
▸BISBOROUGH INTAKE FORM2
01/25/2019122963132Open ↗
12/19/2017122915202Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
11/23/2016140577150Open ↗
08/01/2008110307221Open ↗
▸Other Documents7
▸DOB NOWManufacturer's Specifications2
08/17/2026M01024721-P1Open ↗
08/13/2026M01024721-I1Open ↗
▸DOB NOWCalculations2
08/17/2026M01024721-P1Open ↗
08/13/2026M01024721-I1Open ↗
▸BISFEE EXEMPTION DOCUMENTATION1
11/23/2016140577150Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026M00003140-I1Open ↗
▸DOB NOWIRA Certification1
08/15/2026M01415870-I1Open ↗