RoofUnder Construction1 filing · 2 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
2 documents
Floor 281p · 1 filing · 11 docs
Mechanical
INSTALLATION OF VERIZON TELECOMMUNICATIONS SITE. INSTALLING (2) 3-TON HVAC UNITS, EQUIPMENT RACKS AND RELATED CABLING AND APPURTENANCES WITHIN EXISTING EQUIPMENT ROOM ON THE 28TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
11 documents · 1 drawing sheet
Floor 2726p · 6 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalStructuralOther
Architectural changes on the 26th floor as indicated on drawings.
On file for this job
3 documents · 18 drawing sheets
Mechanical changes (AHU Replacement) on the 12th & 26th floors as indicated on drawings.
On file for this job
12 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY VERTICAL NETTING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
2 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 2612p · 7 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Installation of new plumbing devices and associated piping on the 26th floor as indicated on drawings.
On file for this job
3 documents · 3 drawing sheets
Installation of new sprinkler heads and relocated sprinkler heads on the 26th floor as indicated on drawings.
On file for this job
4 documents · 1 drawing sheet
Installation of new plumbing fixtures on the 26th floor as indicated on drawings.
On file for this job
3 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 253p · 2 filings · 10 docs
ArchitectureGeneralMechanical
Architectural changes (Highpost Capital) on the 24th floor (25th floor Marketing) as indicated on drawings.
On file for this job
5 documents · 2 drawing sheets
Interior demolition of non load bearing partitions on the 25th floor as indicated on drawings.
On file for this job
5 documents · 1 drawing sheet
Floor 2412p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Mechanical changes (Highpost Capital) on the 24th floor (25th floor Marketing) as indicated on drawings.
On file for this job
6 documents · 1 drawing sheet
Plumbing changes (Highpost Capital) on the 24th floor (25th floor Marketing) as indicated on drawings.
On file for this job
3 documents · 1 drawing sheet
sprinkler changes (Highpost Capital) on the 24th floor (25th floor Marketing) as indicated on drawings.
On file for this job
3 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 23Under Construction15p · 2 filings · 12 docs
ArchitectureElectricalGeneralMechanical
Issued Permit Scope
General Construction · Mechanical Systems
MECHANICAL MODIFICATIONS TAKING PLACE ON THE 23RD FLOOR AS PER DRAWINGS FILED HEREEWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
8 documents · 6 drawing sheets
No filed description on record for this job.
On file for this job
4 documents · 4 drawing sheets
Floor 22
Floor 2128p · 7 filings · 20 docs
ArchitectureElectricalFire ProtectionGeneralMechanicalPlumbing
Architectural changes on the 21st floor as indicated on drawings.
On file for this job
7 documents · 4 drawing sheets
Mechanical changes on the 21st floor as indicated on drawings.
On file for this job
6 documents · 2 drawing sheets
Mechanical changes in AC Room on the 21st floor as indicated on drawings.
On file for this job
13 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 20
Floor 19
Floor 1814p · 7 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
STRUCTURAL MODIFICATIONS TAKING PLACE ON FLOORS 16, 17 AND 18 AS PER DRAWINGS FILED HERWEITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
5 documents · 1 drawing sheet
PLUMBING MODIFICATIONS TAKING PLACE ON FLOORS 17 AND 18 AS PER DRAWINGS FILED HERWEITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
4 documents · 1 drawing sheet
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON FLOORS 16, 17 AND 18 AS PER DRAWINGS FILED HERWEITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
10 documents · 8 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 1713p · 4 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbing
PLUMBING MODIFICATIONS TAKING PLACE ON FLOORS 17 AND 18 AS PER DRAWINGS FILED HERWEITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
4 documents · 2 drawing sheets
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON FLOORS 16, 17 AND 18 AS PER DRAWINGS FILED HERWEITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
10 documents · 8 drawing sheets
SPRINKLER MODIFICATIONS TAKING PLACE ON FLOORS 16, 17 AND 18 AS PER DRAWINGS FILED HERWEITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
6 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 169p · 4 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbing
PLUMBING MODIFICATIONS TAKING PLACE ON FLOORS 17 AND 18 AS PER DRAWINGS FILED HERWEITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
4 documents · 1 drawing sheet
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON FLOORS 16, 17 AND 18 AS PER DRAWINGS FILED HERWEITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
10 documents · 6 drawing sheets
SPRINKLER MODIFICATIONS TAKING PLACE ON FLOORS 16, 17 AND 18 AS PER DRAWINGS FILED HERWEITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
6 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 15
Floor 14
Floor 13
Floor 123p · 3 filings · 19 docs
ArchitectureFire ProtectionMechanical
Mechanical changes (AHU Replacement) on the 12th & 26th floors as indicated on drawings.
On file for this job
12 documents · 1 drawing sheet
Interior demo of non load bearing partitions on the 11th and 12th floors as indicated on drawings.
On file for this job
3 documents · 1 drawing sheet
Installation of temporary sprinkler loop on the 11th and 12th floors as indicated on drawings.
On file for this job
4 documents · 1 drawing sheet
Floor 112p · 2 filings · 7 docs
ArchitectureDM
Interior demo of non load bearing partitions on the 11th and 12th floors as indicated on drawings.
On file for this job
3 documents · 1 drawing sheet
Installation of temporary sprinkler loop on the 11th and 12th floors as indicated on drawings.
On file for this job
4 documents · 1 drawing sheet
Floor 10
Floor 92p · 2 filings · 10 docs
ArchitectureDMElectrical
PROPOSED MINOR GENERAL CONSTRUCTION ON THE 9TH FLOOR AS PER DRAWINGS FILED HERWEITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
7 documents · 1 drawing sheet
PROPOSED MINOR GENERAL CONSTRUCTION ON THE 9TH FLOOR AS PER DRAWINGS FILED HERWEITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
3 documents · 1 drawing sheet
Floor 834p · 2 filings · 20 docs
ArchitectureDMStructural
Issued Permit Scope
General Construction
PROPOSED GENERAL CONSTRUCTION WORK ON THE 5th and 7th, and 8th FLOORS AS PER DRAWINGS FILED HERWEITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
40 documents · 1 drawing sheet
Structural work on the 7th and 8th floors to infill stair slabs as indicated on drawings.
On file for this job
8 documents · 1 drawing sheet
Floor 787p · 1 filing · 20 docs
ArchitectureDMFire ProtectionGeneralLandscapeMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems
PROPOSED GENERAL CONSTRUCTION WORK ON THE 5th and 7th, and 8th FLOORS AS PER DRAWINGS FILED HERWEITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
40 documents · 37 drawing sheets
Floor 6Under Construction35p · 1 filing · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
PROPOSED GENERAL CONSTRUCTION WORK ON THE 6th FLOOR AS PER DRAWINGS FILED HERWEITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
21 documents · 27 drawing sheets
Floor 575p · 2 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems
PROPOSED GENERAL CONSTRUCTION WORK ON THE 5th and 7th, and 8th FLOORS AS PER DRAWINGS FILED HERWEITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
40 documents · 4 drawing sheets
PROPOSED GENERAL CONSTRUCTION WORK ON THE FIFTH FLOOR AS PER DRAWINGS FILED HERWEITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
19 documents · 22 drawing sheets
Floor 44p · 3 filings · 11 docs
DMMechanicalPlumbing
Mechanical work to relocate mechanical piping on the 3rd and 4th floors as indicated on drawings.
On file for this job
3 documents · 2 drawing sheets
Plumbing work to remove fixtures and capped piping on the cellar, 3rd & 4th floors as indicated on drawings.
On file for this job
3 documents · 1 drawing sheet
Interior demolition of nonloadbearing partitions and related work on part of cellar, 3rd and 4th floors as indicated on drawings. Removal of non-egress stair between 3rd and 4th floors.
On file for this job
5 documents · 1 drawing sheet
Floor 312p · 7 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
LLW BC Partners - Plumbing work on the 3rd floor as indicated on drawings.
On file for this job
3 documents · 1 drawing sheet
LLW BC Partners - Construction work on the 3rd floor as indicated on drawings.
On file for this job
3 documents · 4 drawing sheets
LLW BC Partners - Mechanical work on the 3rd floor as indicated on drawings.
On file for this job
11 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 24p · 4 filings · 20 docs
MechanicalPlumbingStructural
Tod's - Roger Vivier Buildout - Structural work on the 1st floor as indicated on drawings.
On file for this job
3 documents · 1 drawing sheet
LLW BC Partners - Plumbing work on the 3rd floor as indicated on drawings.
On file for this job
3 documents · 1 drawing sheet
Mechanical changes in AC Room on the 21st floor as indicated on drawings.
On file for this job
13 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 132p · 15 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Sprinklers
SPRINKLER ALTERATIONS AT CELLAR AND 1ST FLOOR AS INDICATED ON DRAWINGS.
On file for this job
9 documents · 1 drawing sheet
Bape - Alter existing sprinkler system as per plans. No change in use, egress or occupancy under this application.
On file for this job
4 documents
MECHANICAL MODIFICATIONS (BALMAIN) AS PER PLANS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this job
10 documents · 4 drawing sheets
Latest 3 of 8 filings on this floor.
Cellar44p · 12 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
SPRINKLER ALTERATIONS AT CELLAR AND 1ST FLOOR AS INDICATED ON DRAWINGS.
On file for this job
9 documents · 1 drawing sheet
Interior demolition of nonloadbearing partitions and related work on part of cellar, 3rd and 4th floors as indicated on drawings. Removal of non-egress stair between 3rd and 4th floors.
On file for this job
5 documents · 1 drawing sheet
Bape - Alter existing sprinkler system as per plans. No change in use, egress or occupancy under this application.
On file for this job
4 documents
Latest 3 of 8 filings on this floor.