← Back
Elevator apt, fireproof without stores
650 MADISON STREET
BROOKLYN · Bedford-Stuyvesant (East) · BIN 3424342
💬 Discuss this project
2022Year Built
5Stories
D3Building Class
R6BZoning
33,150 sfGross Floor Area
38Units
LL97 CoveredRent Stabilized1 Open Violation ▸FDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: MADISON HEIGHTS NY LLC · 13,033 sf lot · 2.54 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Roof82p · 1 filing · 20 docs
Floor 579p · 1 filing · 20 docs
Floor 482p · 1 filing · 20 docs
Floor 374p · 1 filing · 20 docs
Floor 279p · 1 filing · 20 docs
Floor 174p · 1 filing · 20 docs
Cellar84p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TWIN GROUP ASSOCIATES6607/08/2026
MADISON HEIGHTS NY LLC103/22/2026
ELEVATIONS HOLDINGS1903/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/09/2015$2.2M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEANDRO NILS DICKSON ARCHITECT, LLC2012/11/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SPEEDY EXPEDITING2403/21/2026
EXPRESS FILING INC1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TWIN GROUP ASSOCIATES INCGeneral Contractor2507/08/2026
PLBG P & H INCPlumbing507/08/2026
LEANDRO NILS DICKSON ARCHITECTGeneral Contractor403/22/2026
TRISTATE FIRE SPRINKPlumbing203/22/2026
TOVIA WERZBERGERElectrical203/21/2026
TRISTATE FIRE SPRINK INCFire Protection107/08/2026
LEANDRO DICKSONElectrical103/21/2026
LEIBY FISCHERElectrical103/21/2026
LARRY ZASSMANElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIG APPLE GROUP NY A RMA91681712/11/2023
Building Lifecycle
All (87)Filed (20)Permit Issued (15)Signed Off (7)Violation (4)Inspection (11)Special Inspection (30)
12/20/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Soorjbally Harilall
12/20/2023
Special inspection requirement — Air barrier — testing
Soorjbally Harilall
12/20/2023
Special inspection requirement — Maintenance information
Soorjbally Harilall
12/20/2023
Special inspection requirement — Exterior lighting power
Soorjbally Harilall
12/20/2023
Special inspection requirement — Fire-Resistance Rated Construction
Soorjbally Harilall
12/20/2023
Special inspection requirement — Electrical motors and elevators
Soorjbally Harilall
12/20/2023
Special inspection requirement — Fenestration air leakage
Soorjbally Harilall
12/20/2023
Special inspection requirement — Metering
Soorjbally Harilall
12/20/2023
Special inspection requirement — Interior lighting power
Soorjbally Harilall
12/20/2023
Special inspection requirement — Protection of exposed foundation insulation
Soorjbally Harilall
12/20/2023
Special inspection requirement — Lighting in dwelling units
Soorjbally Harilall
12/20/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Soorjbally Harilall
12/20/2023
Special inspection requirement — Lighting controls
Soorjbally Harilall
12/20/2023
Special inspection requirement — Insulation placement and R values
Soorjbally Harilall
12/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
12/20/2023
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
12/20/2023
Special inspection requirement — Fenestration areas
Soorjbally Harilall
12/20/2023
Special inspection requirement — Air barrier - visual inspection
Soorjbally Harilall
12/11/2023
Filed — New Building
B00712457-A4
12/04/2023
Special inspection requirement — Electrical motors and elevators
Soorjbally Harilall
12/04/2023
Special inspection requirement — Lighting in dwelling units
Soorjbally Harilall
12/04/2023
Special inspection requirement — Fenestration areas
Soorjbally Harilall
12/04/2023
Special inspection requirement — Fire-Resistance Rated Construction
Soorjbally Harilall
12/04/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
12/04/2023
Special inspection requirement — Exterior lighting power
Soorjbally Harilall
12/04/2023
Special inspection requirement — Interior lighting power
Soorjbally Harilall
12/04/2023
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
12/04/2023
Special inspection requirement — Lighting controls
Soorjbally Harilall
12/04/2023
Special inspection requirement — Metering
Soorjbally Harilall
12/04/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Soorjbally Harilall
12/04/2023
Special inspection requirement — Maintenance information
Soorjbally Harilall
11/03/2023
Signed off — New Building
B00712457-S5
11/03/2023
Signed off — New Building
B00712457-S6
10/27/2023
Signed off — New Building
B00712457-S8
10/24/2023
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
10/24/2023
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
10/20/2023
Filed — New Building
B00712457-A3
10/17/2023
Filed — New Building
B00712457-A1
10/13/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/13/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/10/2023
Permit issued — Mechanical Systems
B00712457-S5-MS
09/29/2023
Filed — New Building
B00712457-A2
09/11/2023
Filed — New Building
B00712457-P9
09/08/2023
Signed off — New Building
B00712457-S4
09/07/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/29/2023
Filed — New Building
B00712457-P6
08/25/2023
Filed — New Building
B00712457-P8
08/25/2023
Filed — New Building
B00712457-P7
08/18/2023
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
08/03/2023
Signed off — New Building
B00712457-S1
07/25/2023
Signed off — New Building
B00712457-S3
07/25/2023
Permit issued — Curb Cut
B00712457-S4-CC
07/20/2023
Signed off — New Building
B00712457-S2
07/05/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/16/2023
Permit issued — Construction Fence
B00712457-S1-FN
04/28/2023
Permit issued — Structural
B00712457-S3-ST
04/20/2023
Filed — New Building
B00712457-P5
04/17/2023
Permit issued — Foundation
B00712457-S2-FO
04/17/2023
Permit issued — General Construction
B00712457-I1-GC
03/23/2023
Filed — New Building
B00712457-P4
Latest 60 of 87 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offTWIN GROUP ASSOCIATES INC10/10/2023
DOB NOWCurb CutSigned-offTWIN GROUP ASSOCIATES INC07/25/2023
DOB NOWConstruction FenceSigned-offTWIN GROUP ASSOCIATES INC05/16/2023
DOB NOWStructuralSigned-offTWIN GROUP ASSOCIATES INC04/28/2023
DOB NOWFoundationSigned-offTWIN GROUP ASSOCIATES INC04/17/2023
DOB NOWGeneral ConstructionPermit IssuedTWIN GROUP ASSOCIATES INC04/17/2023
DOB NOWSprinklersSigned-offTRISTATE FIRE SPRINK INC03/03/2023
DOB NOWPlumbingSigned-offPLBG P & H INC03/03/2023
DOB NOWGeneral ConstructionPermit IssuedTWIN GROUP ASSOCIATES INC01/13/2023
DOB NOWPlumbingSigned-offPLBG P & H INC12/15/2022
DOB NOWStructuralSigned-offTWIN GROUP ASSOCIATES INC10/24/2022
DOB NOWMechanical SystemsSigned-offTWIN GROUP ASSOCIATES INC10/07/2022
DOB NOWFoundationSigned-offTWIN GROUP ASSOCIATES INC06/09/2022
DOB NOWFoundationSigned-offTWIN GROUP ASSOCIATES INC06/02/2022
DOB NOWConstruction FenceSigned-offTWIN GROUP ASSOCIATES INC05/19/2022
BIS—ISSUEDDAWNY CONSTRUCTION LTD06/15/2018
BIS—ISSUEDDAWNY CONSTRUCTION LTD06/15/2018
BIS—ISSUEDDAWNY CONSTRUCTION LTD05/10/2018
BIS—ISSUEDDAWNY CONSTRUCTION LTD05/10/2018
BISEQISSUEDDAWNY CONSTRUCTION LTD05/04/2018
4 projects · most recent 01/27/2026
General Wiring
FiledStatusContractorScope
01/27/2026Permit IssuedSHTRAL ELECT'L CONT'G CORGeneral Wiring
10/17/2023CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
02/20/2023CompletePOWER DIRECT ELECTRIC INC—
10/26/2022CompleteVILLAGE ELECTL CONTRS INCGeneral Wiring
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
10/24/2023Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
10/24/2023Pass-Final SP - Up to 9 Requested FloorsPassView ↗
10/13/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/13/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/07/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
08/18/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
07/05/2023Pass-Final CND-Occupancy InspectionPassView ↗
01/19/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/19/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/22/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/22/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 120
DateRequirementInspectorRole
12/20/2023Fenestration and door U-factor and product ratingsSoorjbally Harilallenergy_progress
12/20/2023Lighting in dwelling unitsSoorjbally Harilallenergy_progress
12/20/2023Exterior lighting powerSoorjbally Harilallenergy_progress
12/20/2023Protection of exposed foundation insulationSoorjbally Harilallenergy_progress
12/20/2023Lighting controlsSoorjbally Harilallenergy_progress
12/20/2023Insulation placement and R valuesSoorjbally Harilallenergy_progress
12/20/2023Interior lighting powerSoorjbally Harilallenergy_progress
12/20/2023Electrical motors and elevatorsSoorjbally Harilallenergy_progress
12/20/2023Air barrier — testing Soorjbally Harilallenergy_progress
12/20/2023Maintenance informationSoorjbally Harilallenergy_progress
12/20/2023MeteringSoorjbally Harilallenergy_progress
12/20/2023Exterior Insulation and Finish Systems (EIFS)Soorjbally Harilallspecial
12/20/2023Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
12/20/2023Energy Code Compliance InspectionsSoorjbally Harilallprogress
12/20/2023Fire-Resistance Rated ConstructionSoorjbally Harilallprogress
12/20/2023Fenestration air leakageSoorjbally Harilallenergy_progress
12/20/2023Fenestration areasSoorjbally Harilallenergy_progress
12/20/2023Air barrier - visual inspectionSoorjbally Harilallenergy_progress
12/04/2023Exterior Insulation and Finish Systems (EIFS)Soorjbally Harilallspecial
12/04/2023Fenestration air leakageSoorjbally Harilallenergy_progress
12/04/2023Protection of exposed foundation insulationSoorjbally Harilallenergy_progress
12/04/2023Air barrier - visual inspectionSoorjbally Harilallenergy_progress
12/04/2023Air barrier — testing Soorjbally Harilallenergy_progress
12/04/2023Fenestration and door U-factor and product ratingsSoorjbally Harilallenergy_progress
12/04/2023Maintenance informationSoorjbally Harilallenergy_progress
Latest 25 of 120.
▾Documents — 248 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch20
08/26/2026B00712457-A4Request digital key ↗
08/26/2026B00712457-A3Request digital key ↗
08/26/2026B00712457-A2Request digital key ↗
Showing 3 of 20 on file for this type
▸Applications & Permits26
▸BISPLAN / WORK APPROVAL APPLICATION15
03/30/2023340487440Open ↗
03/29/2023321184838Open ↗
12/01/2022340854472Open ↗
Showing 3 of 15 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation6
11/02/2022340854472Open ↗
08/22/2022340854472Open ↗
08/18/2022340854472Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION4
05/10/2018321184838Open ↗
05/10/2018321184838Open ↗
05/10/2018321184838Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
05/04/2018321612117Open ↗
▸Zoning, Tax Lot & Property Records16
▸DOB NOWZD1: DOB Zoning Diagram4
08/26/2026B00712457-I1Open ↗
08/13/2026B00712457-P4Open ↗
08/13/2026B00712457-A4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/26/2026B00712457-I1Open ↗
08/13/2026B00712457-P9Open ↗
08/13/2026B00712457-P4Open ↗
Showing 3 of 4 on file for this type
▸BISZONING DIAGRAM2
01/24/2018321184838Open ↗
08/07/2017321184838Open ↗
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
08/07/2017321184838Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
08/07/2017321184838Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
08/07/2017321184838Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
08/01/2017321184838Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
08/07/2017321184838Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00712457-I1Open ↗
▸Seals & Professional Certifications67
▸DOB NOWProgress Inspector Seal & Signature22
09/12/2026B00712457-S3Open ↗
09/03/2026B00712457-P9Open ↗
09/03/2026B00712457-P9Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/12/2026B00712457-S3Open ↗
09/03/2026B00712457-P9Open ↗
09/03/2026B00712457-P9Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature20
08/26/2026B00712457-P9Open ↗
08/26/2026B00712457-P8Open ↗
08/26/2026B00712457-P7Open ↗
Showing 3 of 20 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
05/27/2022340854472Open ↗
05/24/2017340487440Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
05/07/2018321184838Open ↗
05/07/2018321184838Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/27/2022340854472Open ↗
▸Trade Schedules & Equipment7
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/26/2026B00712457-I1Open ↗
08/13/2026B00712457-P9Open ↗
08/13/2026B00712457-P4Open ↗
Showing 3 of 4 on file for this type
▸BIS* SEWER CONNECTION: DEP SD1 & SD22
08/07/2017321184838Open ↗
08/01/2017321184838Open ↗
▸BISSCHEDULE B - PLUMBING1
06/23/2017321184838Open ↗
▸Safety & Tenant Protection15
▸BISSTREET TREE CHECKLIST4
05/27/2022340854472Open ↗
06/23/2017321184838Open ↗
06/23/2017321184838Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Tree Checklist4
08/26/2026B00712457-P9Open ↗
08/26/2026B00712457-P4Open ↗
08/26/2026B00712457-I1Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
08/18/2022340854472Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
06/23/2017321184838Open ↗
▸BISSTREET TREES SITE PLAN1
08/21/2017340487440Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
05/07/2018321184838Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00712457-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00712457-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00712457-I1Open ↗
▸Environmental & Asbestos24
▸DOB NOWOER: Notice to Proceed11
08/26/2026B00712457-S6Open ↗
08/26/2026B00712457-S5Open ↗
08/26/2026B00712457-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWOER: Notice of Satisfaction10
08/26/2026B00712457-I1Open ↗
08/13/2026B00712457-S2Open ↗
08/13/2026B00712457-S5Open ↗
Showing 3 of 10 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED3
08/22/2022340854472Open ↗
10/02/2017340487440Open ↗
08/01/2017321184838Open ↗
▸Energy Compliance5
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026B00712457-S5Open ↗
08/13/2026B00712457-S6Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
05/07/2018321184838Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
06/13/2017321184838Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00712457-I1Open ↗
▸Inspections & Test Reports18
▸BISTECHNICAL REPORT: RESPONSIBILITY6
03/19/2018321184838Open ↗
08/07/2017321184838Open ↗
08/07/2017321184838Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSOIL REPORT3
08/13/2026B00712457-S2Open ↗
08/13/2026B00712457-P3Open ↗
08/13/2026B00712457-P2Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
05/07/2018321184838Open ↗
▸BISHYDRO FLOW TEST LETTER1
08/07/2017321184838Open ↗
▸BISSOIL REPORT1
06/23/2017321184838Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
05/07/2018321184838Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
06/23/2017321184838Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
05/07/2018321184838Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
08/07/2017321184838Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00712457-S2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00712457-S2Open ↗
▸Approvals, Objections & Sign-offs2
▸BISSCHEDULE A - OCCUPANCY / USE2
06/28/2017321184838Open ↗
03/29/2017321184838Open ↗
▸Cost, Insurance & Ownership1
▸BISPROJECT-SPECIFIC GL INSURANCE1
05/07/2018321184838Open ↗
▸Filing & Intake Forms25
▸BISADDITIONAL INFORMATION16
09/12/2022340854472Open ↗
08/18/2022340854472Open ↗
07/09/2018321184838Open ↗
Showing 3 of 16 on file for this type
▸BISEFILING COVER SHEET6
06/30/2017321612117Open ↗
03/03/2017321184838Open ↗
03/03/2017321184838Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
05/27/2022340854472Open ↗
05/24/2017340487440Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
08/22/2022340854472Open ↗
▸Other Documents22
▸DOB NOWProperty Ownership Certification7
08/26/2026B00712457-P9Open ↗
08/26/2026B00712457-P4Open ↗
08/26/2026B00712457-S2Open ↗
Showing 3 of 7 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION4
09/15/2022340854472Open ↗
08/22/2022340854472Open ↗
08/22/2022340854472Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial4
08/26/2026B00712457-I1Open ↗
08/13/2026B00712457-A4Open ↗
08/13/2026B00712457-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/26/2026B00712457-I1Open ↗
08/13/2026B00712457-P4Open ↗
08/13/2026B00712457-A4Open ↗
Showing 3 of 4 on file for this type
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
05/27/2022340854472Open ↗
▸BISPLOT DIAGRAM1
05/24/2017340487440Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00712457-I1Open ↗