← Back
BuildNYC
Two family converted from one family
650 MARCY AVENUE
STATEN ISLAND · BIN 5084575
💬 Discuss this project
1960Year Built
1.67Stories
B3Building Class
R3XZoning
898 sfGross Floor Area
2Units
Two family converted from one family · 6,000 sf lot · 0.15 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofExisting 2 Family Residence1p · 1 filing · 20 docs
Floor 2Existing 2 Family Residence17p · 2 filings · 20 docs
Floor 1
CellarExisting 2 Family Residence17p · 2 filings · 20 docs
Site & exterior1p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ryan Design Architecture406/19/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Rising Sun ConstructionGeneral Contractor303/21/2026
Rising Sun ConstructionScaffold107/08/2026
Fine MechanicalPlumbing107/08/2026
JB Buzco PlumbingPlumbing108/06/2013
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ryan Design Architecture7159206/19/2023
Building Lifecycle
09/20/2023
Signed off — Alteration
NEW 5 '- 6'' EXTENSION ON RIGHT SIDE SECOND FLOOR EXISTING 2 FAMILY
S00750954-I1
09/19/2023
Signed off — Alteration
RELOCATE SECOND FLOOR KITCHEN NEW 1/2 BATH ON CELLAR
S00705944-I1
09/19/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/22/2023
Special inspection requirement — Fenestration areas
Daniel Ryan
07/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Daniel Ryan
30 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offFine Mechanical10/03/2022
DOB NOWGeneral ConstructionSigned-offRising Sun Construction08/05/2022
DOB NOWConstruction FenceSigned-offRising Sun Construction07/18/2022
BISPLISSUEDJB Buzco Plumbing08/06/2013
BIS—ISSUEDN/A09/26/2012
1 project · most recent 04/11/2023
General Wiring
FiledStatusContractorScope
04/11/2023CompleteNewline ElectricalGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
09/19/2023Pass-Final General Construction Non-Directive 14PassView ↗
06/12/2023Fail-Final General Construction Non-Directive 14FailView ↗
12/30/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/07/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/07/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/04/2022Pass-Final Fence Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
07/22/2023Fenestration areasDaniel Ryanenergy_progress
07/22/2023Fire-Resistant Penetrations and JointsDaniel Ryanspecial
07/22/2023Structural Stability – Alterations of existing buildingsDaniel Ryanspecial
07/22/2023Fire-Resistance Rated ConstructionDaniel Ryanprogress
07/22/2023Fenestration air leakageDaniel Ryanenergy_progress
07/22/2023Fenestration and door U-factor and product ratingsDaniel Ryanenergy_progress
07/22/2023Air barrier - visual inspectionDaniel Ryanenergy_progress
07/22/2023Interior lighting powerDaniel Ryanenergy_progress
03/24/2022Energy Code Compliance InspectionsDaniel Ryanprogress
62 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account