← Back
Church, synagogue, chapel
6501 6 AVENUE
BROOKLYN · BIN 3144228
💬 Discuss this project
1963Year Built
2Stories
M1Building Class
M1-1Zoning
29,816 sfGross Floor Area
0Units
LL97 Covered4 Open Violations 3 unresolved · 1 paperwork only ▸FDNY Report ↗
Church, synagogue, chapel · Owner of record: 1ST EVANG FREE CH BKL · 36,000 sf lot · 0.83 FAR built · Flood zone X
Locations of Work
Mechanical
Cellar1p · 1 filing · 7 docs
2 jobs · most recent 12/12/2018
General Wiring
FiledStatusContractorScope
12/12/2018CompleteWILLDAN ELECTRICAL OF NYGeneral Wiring
01/13/2018CompleteALEF ELEC'L CONTR'G INCGeneral Wiring
Building Lifecycle
All (21)Filed (1)Permit Issued (1)Signed Off (1)Violation (15)Inspection (2)Special Inspection (1)
05/03/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/10/2021
Signed off — Alteration
B00416850-I1
09/23/2021
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/17/2021
Inspection — No Access-Final Boiler Equipment Inspection
No Access
View inspection ↗
08/19/2021
Permit issued — Boiler Equipment
B00416850-I1-BE
08/09/2021
Filed — Alteration
B00416850-I1
08/09/2021
Special inspection requirement — HVAC and service water heating equipment
Joseph Bazini
08/06/2021
Violation issued (ECB, closed)
Boilers
08/06/2021
Violation issued (ECB, closed)
Boilers
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/24/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/18/2011
Violation issued (ECB, open)
Unknown
05/12/2011
Violation issued (ECB, closed)
Construction
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/27/1989
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/27/1989
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/27/1989
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1ST EVANG FREE CH BKLY503/22/2026
FIRST EVANGELICAL FREE CHURCH603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAZINI ENGINEERING, P.C.108/09/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offALL AMERICAN HEATING INC08/19/2021
BISMHISSUEDPRO AIRE DESIGN CONSULT09/25/2017
BISFBISSUEDEDWARD T. MINOR CO. INC.01/28/1992
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/23/2021Pass-Final Boiler Equipment InspectionPassView ↗
09/17/2021No Access-Final Boiler Equipment InspectionNo AccessView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
08/09/2021HVAC and service water heating equipment Joseph Bazinienergy_progress
▾Documents — 68 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch - Boiler Equipment1
09/01/2026B00416850-I1Request digital key ↗
▸Applications & Permits11
▸BISPLACE OF ASSEMBLY6
07/13/2015320697643Open ↗
06/02/2015320697670Open ↗
06/02/2015320697689Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
10/23/2017340546715Open ↗
09/21/2017340546715Open ↗
▸BISPLACE OF ASSEMBLY APPLICATION1
04/02/2013320697689Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
10/13/2017340546715Open ↗
▸BISWORK PERMIT APPLICATION1
09/21/2017340546715Open ↗
▸Seals & Professional Certifications17
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
07/13/2015320697643Open ↗
06/02/2015320697670Open ↗
06/02/2015320697689Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/21/2017340546715Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/23/2017340546715Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/21/2017340546715Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/21/2017340546715Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
09/01/2026B00416850-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/23/2026B00416850-I1Open ↗
▸Environmental & Asbestos6
▸BISASBESTOS-EXEMPTION (ASB4)5
01/03/2013320697689Open ↗
01/03/2013320697670Open ↗
01/03/2013320697661Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
09/01/2026B00416850-I1Open ↗
▸Energy Compliance9
▸BISEMERGENCY LIGHTING(IF NOT IN COMPLIANCE WITH MEMO 2/18/81)5
06/02/2015320697670Open ↗
06/02/2015320697689Open ↗
06/02/2015320697643Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/21/2017340546715Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/21/2017340546715Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/01/2026B00416850-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
09/01/2026B00416850-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/21/2017340546715Open ↗
▸Approvals, Objections & Sign-offs21
▸BISLETTERS - SUPPORTING DOCUMENTATION10
06/17/2015320697661Open ↗
06/17/2015320697661Open ↗
06/17/2015320697652Open ↗
Showing 3 of 10 on file for this type
▸BISFLAME SPREAD/FIRE LETTER5
06/02/2015320697670Open ↗
06/02/2015320697689Open ↗
06/02/2015320697643Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
01/03/2013320697652Open ↗
01/03/2013320697689Open ↗
01/03/2013320697670Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
09/01/2026B00416850-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
09/21/2017340546715Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
09/21/2017340546715Open ↗