← Back
Two family frame
6504 AVENUE N
BROOKLYN · BIN 3236476
💬 Discuss this project
1970Year Built
2Stories
B2Building Class
R3-2Zoning
2,240 sfGross Floor Area
2Units
Two family frame · 3,408 sf lot · 0.66 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR102/29/2024
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281102/29/2024
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (6)
03/26/2026
Signed off — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 13 Panels, 4.745 kW
B01012695-I1
03/04/2024
Permit issued — Solar
B01012695-I1-SL
02/29/2024
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 13 Panels, 4.745 kW
B01012695-I1
02/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
02/29/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
02/29/2024
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Mina Makar
02/29/2024
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
02/29/2024
Special inspection requirement — Final
Mina Makar
02/29/2024
Special inspection requirement — Air barrier - visual inspection
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR03/04/2024
1 project · most recent 01/06/2026
FiledStatusContractorScope
01/06/2026CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
02/29/2024Fire-Resistant Penetrations and JointsMina Makarspecial
02/29/2024Structural Stability – Alterations of existing buildingsMina Makarspecial
02/29/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Mina Makarspecial
02/29/2024Energy Code Compliance InspectionsMina Makarprogress
02/29/2024FinalMina Makarprogress
02/29/2024Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/25/2026B01012695-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026B01012695-I1Open ↗
08/24/2026B01012695-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/25/2026B01012695-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026B01012695-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/25/2026B01012695-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01012695-I1Open ↗