← Back
Three families
651 BRADFORD STREET
BROOKLYN · BIN 3096741
💬 Discuss this project
1930Year Built
2Stories
C0Building Class
R6Zoning
2,480 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · Owner of record: 651 BRADFORD LLC · 2,625 sf lot · 0.94 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof4p · 2 filings · 20 docs
Floor 22p · 2 filings · 20 docs
Floor 1
Cellar2p · 1 filing · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
USA DEVELOPMENT1707/08/2026
651 BRADFORD LLC203/22/2026
MTEK103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/28/2023$675K—Private party → MTEK BROOKLYN LLC$272/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
L&C ASSOCIATES604/25/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
L&C ASSOCIATES603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TURN KEY NYC LLCGeneral Contractor407/08/2026
HORBRIDGE PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LAM AND CO CONSULTING LLC8864404/25/2024
Building Lifecycle
All (100)Filed (6)Permit Issued (3)Signed Off (3)Violation (52)Inspection (6)Special Inspection (30)
05/01/2026
Violation issued (HPD, closed)
A
04/29/2026
Violation issued (HPD, closed)
B
04/29/2026
Violation issued (HPD, closed)
C
04/29/2026
Violation issued (HPD, closed)
A
04/29/2026
Violation issued (HPD, closed)
A
04/29/2026
Violation issued (HPD, closed)
A
04/29/2026
Violation issued (HPD, closed)
A
04/29/2026
Violation issued (HPD, closed)
B
04/29/2026
Violation issued (HPD, closed)
A
04/29/2026
Violation issued (HPD, closed)
A
04/29/2026
Violation issued (HPD, closed)
B
06/06/2025
Violation issued (HPD, closed)
A
11/26/2024
Violation issued (HPD, closed)
I
05/24/2024
Signed off — Alteration
INTERIOR RENOVATION IN EXISTING 3-FAMILY 2-STORY. RESIDENTIAL BUILDING WITH CELLAR. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00936485-I1
05/24/2024
Signed off — Alteration
MECHANICAL WORKS. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00939219-I1
05/24/2024
Signed off — Alteration
PLUMBING WORK. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00936530-I1
05/21/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/09/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/30/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/26/2024
Special inspection requirement — HVAC-R and service water heating system controls
JICHEN SUN
04/26/2024
Special inspection requirement — Mechanical Systems
JICHEN SUN
04/26/2024
Special inspection requirement — Heating Systems
JICHEN SUN
04/26/2024
Special inspection requirement — Shutoff dampers
JICHEN SUN
04/26/2024
Special inspection requirement — HVAC-R and service water heating equipment
JICHEN SUN
04/26/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JICHEN SUN
04/26/2024
Special inspection requirement — Maintenance information
JICHEN SUN
04/26/2024
Special inspection requirement — Energy Code Compliance Inspections
JICHEN SUN
04/26/2024
Special inspection requirement — Final
Chih Hsu
04/25/2024
Filed — Alteration
PLUMBING WORK. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00936530-P1
04/25/2024
Filed — Alteration
MECHANICAL WORKS. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00939219-P1
04/25/2024
Special inspection requirement — Energy Code Compliance Inspections
JICHEN SUN
04/25/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JICHEN SUN
04/25/2024
Special inspection requirement — HVAC-R and service water heating equipment
JICHEN SUN
04/25/2024
Special inspection requirement — HVAC-R and service water heating system controls
JICHEN SUN
04/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JICHEN SUN
04/24/2024
Special inspection requirement — Interior lighting power
JICHEN SUN
04/24/2024
Special inspection requirement — Energy Code Compliance Inspections
JICHEN SUN
04/22/2024
Filed — Alteration
INTERIOR RENOVATION IN EXISTING 3-FAMILY 2-STORY. RESIDENTIAL BUILDING WITH CELLAR. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00936485-P1
04/22/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JICHEN SUN
04/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JICHEN SUN
04/22/2024
Special inspection requirement — Energy Code Compliance Inspections
JICHEN SUN
04/22/2024
Special inspection requirement — Interior lighting power
JICHEN SUN
04/22/2024
Special inspection requirement — Energy Code Compliance Inspections
JICHEN SUN
04/22/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JICHEN SUN
04/22/2024
Special inspection requirement — HVAC-R and service water heating equipment
JICHEN SUN
04/22/2024
Special inspection requirement — HVAC-R and service water heating system controls
JICHEN SUN
04/22/2024
Special inspection requirement — Heating Systems
JICHEN SUN
04/22/2024
Special inspection requirement — Mechanical Systems
JICHEN SUN
04/22/2024
Special inspection requirement — Energy Code Compliance Inspections
JICHEN SUN
04/22/2024
Special inspection requirement — Final
Chih Hsu
04/22/2024
Special inspection requirement — Maintenance information
JICHEN SUN
04/22/2024
Special inspection requirement — HVAC-R and service water heating equipment
JICHEN SUN
04/09/2024
Violation issued (HPD, closed)
A
03/27/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/26/2024
Permit issued — Mechanical Systems
B00939219-I1-MS
01/23/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/23/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/18/2024
Permit issued — Plumbing
B00936530-I1-PL
01/08/2024
Permit issued — General Construction
B00936485-I1-GC
01/04/2024
Filed — Alteration
MECHANICAL WORKS. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00939219-I1
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offTURN KEY NYC LLC03/26/2024
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT01/18/2024
DOB NOWGeneral ConstructionSigned-offTURN KEY NYC LLC01/08/2024
1 project · most recent 10/31/2025
FiledStatusContractorScope
10/31/2025Permit IssuedK.A.B. ELECTRIC CORP4 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
05/21/2024Pass-Final General Construction Non-Directive 14PassView ↗
05/09/2024Fail-Final General Construction Non-Directive 14FailView ↗
04/30/2024Fail-Final General Construction Non-Directive 14FailView ↗
03/27/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/23/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/23/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
04/26/2024HVAC-R and service water heating system controlsJICHEN SUNenergy_progress
04/26/2024Mechanical SystemsJICHEN SUNspecial
04/26/2024Heating SystemsJICHEN SUNspecial
04/26/2024Shutoff dampersJICHEN SUNenergy_progress
04/26/2024HVAC-R and service water heating equipmentJICHEN SUNenergy_progress
04/26/2024HVAC-R and service water piping design and insulationJICHEN SUNenergy_progress
04/26/2024Maintenance informationJICHEN SUNenergy_progress
04/26/2024Energy Code Compliance InspectionsJICHEN SUNprogress
04/26/2024FinalChih Hsuprogress
04/25/2024Energy Code Compliance InspectionsJICHEN SUNprogress
04/25/2024HVAC-R and service water piping design and insulationJICHEN SUNenergy_progress
04/25/2024HVAC-R and service water heating equipmentJICHEN SUNenergy_progress
04/25/2024HVAC-R and service water heating system controlsJICHEN SUNenergy_progress
04/24/2024Fire-Resistant Penetrations and JointsJICHEN SUNspecial
04/24/2024Interior lighting powerJICHEN SUNenergy_progress
04/24/2024Energy Code Compliance InspectionsJICHEN SUNprogress
04/22/2024HVAC-R and service water piping design and insulationJICHEN SUNenergy_progress
04/22/2024Fire-Resistant Penetrations and JointsJICHEN SUNspecial
04/22/2024Energy Code Compliance InspectionsJICHEN SUNprogress
04/22/2024Interior lighting powerJICHEN SUNenergy_progress
04/22/2024Energy Code Compliance InspectionsJICHEN SUNprogress
04/22/2024HVAC-R and service water piping design and insulationJICHEN SUNenergy_progress
04/22/2024HVAC-R and service water heating equipmentJICHEN SUNenergy_progress
04/22/2024HVAC-R and service water heating system controlsJICHEN SUNenergy_progress
04/22/2024Heating SystemsJICHEN SUNspecial
Latest 25 of 32.
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/26/2026B00936485-P1Request digital key ↗
08/26/2026B00936485-I1Request digital key ↗
08/26/2026B00936530-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications24
▸DOB NOWProgress Inspector Seal & Signature14
08/31/2026B00936485-I1Open ↗
08/31/2026B00936485-I1Open ↗
08/30/2026B00939219-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/26/2026B00936485-I1Open ↗
08/26/2026B00936530-I1Open ↗
08/13/2026B00936485-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/31/2026B00936485-I1Open ↗
08/30/2026B00939219-I1Open ↗
08/28/2026B00939219-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/26/2026B00936485-I1Open ↗
08/26/2026B00936530-I1Open ↗
08/13/2026B00936485-P1Open ↗
Showing 3 of 6 on file for this type