1958Year Built
15Stories
T2Building Class
M3-1Zoning
7,058,736 sfGross Floor Area
1Units
LL97 Covered22 Open Violations 1 unresolved · 21 paperwork only ▸FDNY Report ↗
Pier, dock, bulkhead · Owner of record: NYC DEPARTMENT OF SMALL BUSINESS SERVICES · 6,429,961 sf lot · 1.1 FAR built · Flood zone X500
Locations of Work
ArchitectureStructural
Permit Issued — active, not yet Signed-off
RoofUnder Construction16p · 2 filings · 20 docs
Floor 2Under Construction11p · 1 filing · 20 docs
Floor 1Under Construction11p · 1 filing · 20 docs
1 job · most recent 05/19/2026
Gas
FiledStatusContractorScope
05/19/2026——Gas
1 job · most recent 03/30/2026
FiledStatusContractorScope
03/30/2026Permit IssuedRICHARD NEU—
1 job · most recent 06/10/2026
FiledStatusContractorScope
06/10/2026Permit IssuedPROBUILDERO CORP3 scope_items
4 jobs · most recent 03/31/2026
Sidewalk Shed Fence Scaffold
FiledStatusContractorScope
03/31/2026Permit IssuedJASCO, INCSidewalk Shed
03/19/2026——Sidewalk Shed
03/19/2026Permit IssuedPROBUILDERO CORPFence
03/19/2026Permit IssuedPROBUILDERO CORPScaffold
Building Lifecycle
All (36)Filed (9)Permit Issued (7)Inspection (3)Special Inspection (17)
09/22/2026
Permit issued — Sidewalk Shed
B01380299-I1-SH
09/01/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
09/01/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/02/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
06/30/2026
Permit issued — Sidewalk Shed
B01380299-I1-SH
06/23/2026
Permit issued — Structural
B01167067-S1-ST
06/11/2026
Special inspection requirement — Structural Steel - Details
GIORGI KHARDZEISHVILI
06/11/2026
Special inspection requirement — Structural Steel - High Strength Bolting
GIORGI KHARDZEISHVILI
06/11/2026
Special inspection requirement — Structural Cold-Formed Steel
GIORGI KHARDZEISHVILI
06/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
GIORGI KHARDZEISHVILI
06/11/2026
Special inspection requirement — Final
Paul Millman
06/10/2026
Filed — Alteration
BNY Bldg 204 (Old Bldg132) Roof replacement per plans: Removal & replacement of existing roof gutters, downspouts & accessories.
B01167067-P2
05/19/2026
Filed — Alteration
REMOVE EXISTING GAS METER RIG SERVING THE BOILER PLANT AT 202 BROOKLYN NAVY YARD. INSTALL NEW GAS METER RIG IN THE SAME LOCATION TO SERVE THE NEW BOILER PLANT AT 203 BROOKLYN NAVY YARD. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01358703-I1
05/19/2026
Permit issued — Structural
B01167067-I1-GC-CX
04/01/2026
Permit issued — Sidewalk Shed
B01380299-I1-SH
03/31/2026
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01380299-I1
03/23/2026
Permit issued — Construction Fence
B01374570-I1-FN
03/23/2026
Permit issued — Supported Scaffold
B01374603-I1-SF
03/19/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD AT 204 BROOKLYN NAVY YARD, BROOKLYN, NY 11205 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01374603-I1
03/19/2026
Filed — Alteration
INSTALLATION OF THE TEMPORARY FENCE AT 204 BROOKLYN NAVY YARD, BROOKLYN, NY 11205 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01374570-I1
03/19/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AT 204 BROOKLYN NAVY YARD, BROOKLYN, NY 11205 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01374591-I1
03/18/2026
Special inspection requirement — Post-installed Anchors
MAHFUZAR RAHMAN
03/10/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
GIORGI KHARDZEISHVILI
03/10/2026
Special inspection requirement — Post-installed Anchors
GIORGI KHARDZEISHVILI
03/10/2026
Special inspection requirement — Final
David May
03/10/2026
Special inspection requirement — Insulation placement and R values
David May
03/06/2026
Filed — Alteration
BNY Bldg 204 (Old Bldg132) Roof replacement per plans: Removal & replacement of existing roof gutters, downspouts & accessories.
B01167067-P1
03/04/2026
Special inspection requirement — Post-installed Anchors
03/04/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/04/2026
Special inspection requirement — Final
David May
03/04/2026
Special inspection requirement — Insulation placement and R values
David May
03/03/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
03/03/2026
Special inspection requirement — High-Pressure Fuel-Gas Piping (Welding)
03/03/2026
Special inspection requirement — Post-installed Anchors
02/28/2025
Filed — Alteration
BNY Bldg 204 (Old Bldg132) Roof replacement per plans: Removal & replacement of existing roof gutters, downspouts & accessories.
B01167067-I1
02/28/2025
Filed — Alteration
BNY Bldg 204 (Old Bldg132) Roof replacement per plans: Removal & replacement of existing roof gutters, downspouts & accessories.
B01167067-S1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JASCO309/23/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUPERSTRUCTURES ENG + ARCH303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PROBUILDERO CORPGeneral Contractor407/08/2026
JASCO, INCGeneral Contractor309/23/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HUDSON PEAKS CONSULTING L8381306/10/2026
AK CONSULTING SERVICES, I6198103/19/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedJASCO, INC09/22/2026
DOB NOWSidewalk ShedPermit IssuedJASCO, INC06/30/2026
DOB NOWStructuralPermit IssuedPROBUILDERO CORP06/23/2026
DOB NOWStructuralPermit IssuedPROBUILDERO CORP05/19/2026
DOB NOWSidewalk ShedPermit IssuedJASCO, INC04/01/2026
DOB NOWConstruction FencePermit IssuedPROBUILDERO CORP03/23/2026
DOB NOWSupported ScaffoldPermit IssuedPROBUILDERO CORP03/23/2026
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/01/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
09/01/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/02/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
06/11/2026Structural Steel - DetailsGIORGI KHARDZEISHVILIspecial
06/11/2026Structural Steel - High Strength BoltingGIORGI KHARDZEISHVILIspecial
06/11/2026Structural Cold-Formed SteelGIORGI KHARDZEISHVILIspecial
06/11/2026Structural Stability – Alterations of existing buildingsGIORGI KHARDZEISHVILIspecial
06/11/2026FinalPaul Millmanprogress
03/18/2026Post-installed AnchorsMAHFUZAR RAHMANspecial
03/10/2026Structural Stability – Alterations of existing buildingsGIORGI KHARDZEISHVILIspecial
03/10/2026Post-installed AnchorsGIORGI KHARDZEISHVILIspecial
03/10/2026FinalDavid Mayprogress
03/10/2026Insulation placement and R valuesDavid Mayenergy_progress
03/04/2026Post-installed Anchors—special
03/04/2026Structural Stability – Alterations of existing buildings—special
03/04/2026FinalDavid Mayprogress
03/04/2026Insulation placement and R valuesDavid Mayenergy_progress
03/03/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)—special
03/03/2026High-Pressure Fuel-Gas Piping (Welding)—special
03/03/2026Post-installed Anchors—special
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
09/03/2026B01374603-I1Request digital key ↗
09/03/2026B01374570-I1Request digital key ↗
08/17/2026B01374591-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/03/2026B01374603-I1Open ↗
09/03/2026B01374570-I1Open ↗
08/17/2026B01374591-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026B01167067-S1Open ↗
08/30/2026B01167067-I1Open ↗
08/30/2026B01167067-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B01167067-S1Open ↗
08/30/2026B01167067-I1Open ↗
08/29/2026B01374603-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/16/2026B01167067-S1Open ↗
08/16/2026B01167067-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026B01358703-I1Open ↗
▸Approvals, Objections & Sign-offs9
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter9
08/16/2026B01358703-I1Open ↗
08/16/2026B01167067-I1Open ↗
08/16/2026B01167067-P2Open ↗
Showing 3 of 9 on file for this type
▸Other Documents2
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/16/2026B01167067-I1Open ↗
08/13/2026B01167067-P1Open ↗