← Back
BuildNYC
Elevator apt, fireproof with stores
653 10TH AVENUE
MANHATTAN · BIN 1026966
💬 Discuss this project
2012Year Built
8Stories
D6Building Class
R8Zoning
25,617 sfGross Floor Area
21Units
LL97 CoveredRent Stabilized6 Active Violations 4 unresolved · 2 paperwork only 2 old, status unconfirmed ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: 653 Tenth Avenue · 5,021 sf lot · 5.1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofGrocery and convenience retailer with commercial kitchen2p · 2 filings · 20 docs
Floor 1Grocery and convenience retailer with commercial kitchen39p · 1 filing · 20 docs
CellarGrocery and convenience retailer with commercial kitchen2p · 1 filing · 20 docs
Site & exteriorHeavy duty sidewalk shed installation18p · 5 filings · 20 docs
Filed — no permit issuedNasa Cafe'1p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
653 Tenth Ave2703/22/2026
Dyanatec Contracting703/21/2026
Clinton Recording Studios303/21/2026
760 West End Ave Owners103/22/2026
653 10th Avenue103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Sotir Associates609/10/2025
Ashraf209/05/2025
Kamen Tall Architects106/06/2025
Korman Design & Build104/15/2025
MSM Engineering Services103/15/2025
Skyline Rigging102/24/2025
Enthink Engineers106/30/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Kenny Lee Architect103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Andamio ScaffoldingScaffold1007/08/2026
Katan P & HPlumbing407/08/2026
Sham Construction GroupGeneral Contractor204/09/2026
WCK ElectricElectrical103/21/2026
East Coast FacadesGeneral Contractor104/09/2026
Everest ScaffoldingScaffold104/08/2026
Windham RestorationScaffold107/08/2026
Century Electric CoElectrical103/22/2026
Doria ScaffoldingScaffold104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Sotir Associates7473609/10/2025
Christian L. Martos Engineering5965106/06/2025
Studio Nyandak Architectu8378106/06/2025
Skyline Rigging7880102/24/2025
Building Lifecycle
All (132)Filed (13)Permit Issued (16)Signed Off (7)Facade (FISP) (12)Violation (53)Inspection (4)Objection (6)Special Inspection (21)
08/17/2026
Signed off — Alteration
M01187122-I1
08/13/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLDS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
M01173352-I1
08/05/2026
Cycle 9 facade report signed — SAFE
07/21/2026
Cycle 9 facade inspection completed
07/02/2026
Cycle 9 facade report submitted
05/20/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01193671-I1
04/29/2026
Cycle 9 facade report submitted
04/27/2026
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01193672-I1
04/16/2026
Cycle 9 facade report signed — UNSAFE
04/14/2026
Cycle 9 facade inspection completed
03/11/2026
Permit issued — Supported Scaffold
M01193672-I1-SF
03/11/2026
Permit issued — Sidewalk Shed
M01193671-I1-SH
10/27/2025
Signed off — Alteration
PLUMBING WORK IN 1ST FLOOR COMMERCIAL SPACE IN CONJUNCTION WITH RENOVATIONS FILED UNDER M01120308-I1. NEW COMMERCIAL COOKING EQUIPMENT & NEW PLUMBING FIXTURES & BACKFLOW PREVENTER.
M01120308-S1
10/17/2025
Signed off — Alteration
PLUMBING WORK IN 1ST FLOOR COMMERCIAL SPACE IN CONJUNCTION WITH RENOVATIONS FILED UNDER M01120308-I1. NEW COMMERCIAL COOKING EQUIPMENT & NEW PLUMBING FIXTURES & BACKFLOW PREVENTER.
M01120308-I1
10/08/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/06/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/30/2025
Objection resolved — Addressed
09/25/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00549842-I1
09/10/2025
Filed — Alteration
PLUMBING WORK IN 1ST FLOOR COMMERCIAL SPACE IN CONJUNCTION WITH RENOVATIONS FILED UNDER M01120308-I1. NEW COMMERCIAL COOKING EQUIPMENT & NEW PLUMBING FIXTURES & BACKFLOW PREVENTER.
M01120308-P4
09/05/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01193672-P1
08/01/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/28/2025
Objection raised — Structural
07/23/2025
Filed — Alteration
PLUMBING WORK IN 1ST FLOOR COMMERCIAL SPACE IN CONJUNCTION WITH RENOVATIONS FILED UNDER M01120308-I1. NEW COMMERCIAL COOKING EQUIPMENT & NEW PLUMBING FIXTURES & BACKFLOW PREVENTER.
M01120308-P3
07/23/2025
Filed — Alteration
PLUMBING WORK IN 1ST FLOOR COMMERCIAL SPACE IN CONJUNCTION WITH RENOVATIONS FILED UNDER M01120308-I1. NEW COMMERCIAL COOKING EQUIPMENT & NEW PLUMBING FIXTURES & BACKFLOW PREVENTER.
M01120308-P1
07/17/2025
Permit issued — General Construction
M01187122-I1-GC
07/17/2025
Special inspection requirement — Tenant Protection Plan Compliance
07/17/2025
Special inspection requirement — Tenant Protection Plan Compliance
06/11/2025
Permit issued — Suspended Scaffold
M01173352-I1-SC
06/06/2025
Filed — Alteration
M01187122-I1
05/14/2025
Special inspection requirement — Energy Code Compliance Inspections
Hany Demetry
05/14/2025
Special inspection requirement — HVAC-R and service water heating equipment
Hany Demetry
05/14/2025
Special inspection requirement — Fire-Resistance Rated Construction
Hany Demetry
05/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hany Demetry
05/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hany Demetry
05/14/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Hany Demetry
05/14/2025
Special inspection requirement — Energy Code Compliance Inspections
Hany Demetry
04/15/2025
Filed — Alteration
INSTALLATION OF NON-ADVERTISING, NON-FLASHING AND ILLUMINATED BUSINESS ACCESSORY SIGN ON FRONT FACADE OF EXISTING OFFICE AT 1ST FLOOR LEVEL AS TENANT FIT-OUT SIGN.
M01179119-I1
04/14/2025
Special inspection requirement — Final
04/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/01/2025
Permit issued — Suspended Scaffold
M01173352-I1-SC
03/17/2025
Permit issued — Sidewalk Shed
M01193671-I1-SH
03/17/2025
Permit issued — Supported Scaffold
M01193672-I1-SF
03/15/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01193671-I1
03/15/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01193672-I1
02/25/2025
Permit issued — Suspended Scaffold
M01173352-I1-SC
02/24/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLDS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
M01173352-I1
01/29/2025
Special inspection requirement — Post-installed Anchors
ZELJKO STEVANOVIC
01/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/04/2024
Permit issued — Plumbing
M01120308-S2-PL
12/04/2024
Violation issued (ECB, closed)
Unknown
12/04/2024
Violation issued (ECB, closed)
Construction
10/21/2024
Permit issued — General Construction
M01120308-I1-GC
10/18/2024
Permit issued — Mechanical Systems
M01120308-S1-MS
10/15/2024
Objection resolved — Addressed
10/11/2024
Objection resolved — Addressed
10/10/2024
Filed — Alteration
PLUMBING WORK IN 1ST FLOOR COMMERCIAL SPACE IN CONJUNCTION WITH RENOVATIONS FILED UNDER M01120308-I1. NEW COMMERCIAL COOKING EQUIPMENT & NEW PLUMBING FIXTURES & BACKFLOW PREVENTER.
M01120308-S1
10/10/2024
Filed — Alteration
PLUMBING WORK IN 1ST FLOOR COMMERCIAL SPACE IN CONJUNCTION WITH RENOVATIONS FILED UNDER M01120308-I1. NEW COMMERCIAL COOKING EQUIPMENT & NEW PLUMBING FIXTURES & BACKFLOW PREVENTER.
M01120308-I1
10/10/2024
Filed — Alteration
PLUMBING WORK IN 1ST FLOOR COMMERCIAL SPACE IN CONJUNCTION WITH RENOVATIONS FILED UNDER M01120308-I1. NEW COMMERCIAL COOKING EQUIPMENT & NEW PLUMBING FIXTURES & BACKFLOW PREVENTER.
M01120308-S2
10/10/2024
Objection raised — Other
10/10/2024
Objection raised — Other
Latest 60 of 132 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding03/11/2026
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding03/11/2026
DOB NOWGeneral ConstructionSigned-offEast Coast Facades07/17/2025
DOB NOWSuspended ScaffoldPermit IssuedDoria Scaffolding06/11/2025
DOB NOWSuspended ScaffoldPermit IssuedWindham Restoration04/01/2025
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding03/17/2025
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding03/17/2025
DOB NOWSuspended ScaffoldPermit IssuedDoria02/25/2025
DOB NOWPlumbingPermit IssuedKatan P & H12/04/2024
DOB NOWGeneral ConstructionSigned-offSham Construction Group10/21/2024
DOB NOWMechanical SystemsSigned-offSham Construction Group10/18/2024
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding09/05/2024
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding09/08/2023
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding09/12/2022
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding09/20/2021
DOB NOWSidewalk ShedSigned-offEverest Scaffolding06/30/2021
BIS—ISSUEDDynatec Contracting07/09/2013
BISEQISSUEDRock Group NY04/23/2013
BISEQISSUEDRock Group NY04/16/2013
BISSPISSUEDT.N.T. Plumbing & Heating04/05/2013
BISPLISSUEDT.N.T. Plumbing & Heating04/01/2013
BISBLISSUEDT.N.T. Plumbing & Heating03/13/2013
BISOTISSUEDDynatec Contracting09/26/2012
BISEQISSUEDDynatec Contracting07/10/2012
BIS—ISSUEDDynatec Contracting07/10/2012
BISEQISSUEDRock Scaffolding06/06/2012
BISEQISSUEDRock Scaffolding04/13/2012
BISSPISSUEDT.N.T. Plumbing & Heating02/10/2012
BISSDISSUEDT.N.T. Plumbing & Heating01/31/2012
BISPLISSUEDT.N.T. Plumbing & Heating01/31/2012
BISPLISSUEDDelta-Sigma Mechanical10/18/2011
BIS—ISSUEDDynatec Contracting10/17/2011
BISOTISSUEDDynatec Contracting10/12/2011
BISEQISSUEDDynatec Contracting10/12/2011
BISSDISSUEDFlint Mechanical09/14/2011
BISEQISSUEDDynatec Contracting08/18/2011
BISEQISSUEDBreeze National06/09/2011
BIS—ISSUEDBreeze National06/09/2011
BISEQISSUEDBreeze National04/11/2011
BIS—ISSUEDBreeze National04/11/2011
+ 5 more permits on file
1 project · most recent 09/10/2025
Air Conditioning Systems Refrigeration Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/10/2025Signed-offSham Construction GroupAir Conditioning Systems, Refrigeration Systems, Ventilation Systems
Cooling
Daikin RXYQ144XATJA 69,000 BTU · Vrf Outdoor ×1
Ventilation
Air Quality Engineering AUTOCLEAN 4000 / MODEL 00531 4,000 CFM · Kitchen Exhaust ×1
Greenheck BSQ-240 4,000 CFM · Makeup Air ×1
Refrigeration
Copeland XFAM 015Z TFC 081 17,700 BTU · Refrigeration Unit ×1
XFAM 020Z TFC 081 9,680 BTU · Refrigeration Unit ×1
XFAM 025Z TFC 081 28,800 BTU · Refrigeration Unit ×1
1 project · most recent 09/10/2025
Gas Water/Sanitary
FiledStatusContractorScope
09/10/2025Permit IssuedKatan P & HGas, Water/Sanitary
3 projects · most recent 12/04/2024
General Wiring
FiledStatusContractorScope
12/04/2024Permit IssuedWCK ElectricGeneral Wiring
02/03/2023CancelledCentury ElectricGeneral Wiring
07/01/2021CompleteBorowide Elect'l Contractors—
2 projects · most recent 09/05/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
09/05/2025Signed-offAndamio ScaffoldingScaffold
03/15/2025Signed-offAndamio ScaffoldingSidewalk Shed
1 project · most recent 02/24/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
02/24/2025Permit IssuedDoria ScaffoldingSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/08/2025Pass-Final General Construction Non-Directive 14PassView ↗
10/06/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
07/17/2025Tenant Protection Plan Compliance—special
07/17/2025Tenant Protection Plan Compliance—special
05/14/2025Energy Code Compliance InspectionsHany Demetryprogress
05/14/2025HVAC-R and service water heating equipmentHany Demetryenergy_progress
05/14/2025Fire-Resistance Rated ConstructionHany Demetryprogress
05/14/2025Fire-Resistant Penetrations and JointsHany Demetryspecial
05/14/2025Fire-Resistant Penetrations and JointsHany Demetryspecial
05/14/2025Structural Stability – Alterations of existing buildingsHany Demetryspecial
05/14/2025Energy Code Compliance InspectionsHany Demetryprogress
04/14/2025Final—progress
04/11/2025Fire-Resistant Penetrations and Joints—special
01/29/2025Post-installed AnchorsZELJKO STEVANOVICspecial
10/01/2024Shutoff dampersHany Demetryenergy_progress
10/01/2024HVAC-R and service water heating system controlsHany Demetryenergy_progress
10/01/2024HVAC-R and service water heating equipmentHany Demetryenergy_progress
10/01/2024HVAC-R and service water piping design and insulationHany Demetryenergy_progress
10/01/2024Post-installed AnchorsHany Demetryspecial
10/01/2024Tenant Protection Plan ComplianceHany Demetryspecial
10/01/2024Mechanical SystemsHany Demetryspecial
10/01/2024Energy Code Compliance InspectionsHany Demetryprogress
10/01/2024FinalMagdy Youssefprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Nasa Cafe'Restaurant / Food ServiceFloor 1
Project M01179119 Alteration · Approved · 04/15/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 362 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
09/03/2026M00549842-I1Request digital key ↗
08/26/2026M01120308-S1Request digital key ↗
08/26/2026M01120308-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits74
▸BISPLAN / WORK APPROVAL APPLICATION46
09/18/2013120809811Open ↗
06/07/2013120809811Open ↗
06/06/2013120809811Open ↗
Showing 3 of 46 on file for this type
▸BISWORK PERMIT APPLICATION23
05/01/2013121047107Open ↗
04/19/2013121045458Open ↗
04/11/2013120477750Open ↗
Showing 3 of 23 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
06/12/2012120477741Open ↗
04/26/2012120477741Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
04/19/2013120477741Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
09/20/2013121045458Open ↗
▸DOB NOWHPD Certification Letter or CPC Special Permit1
08/13/2026M01187122-I1Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISZoning Diagram (ZD1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING EXHIBIT III- DESC & OWNERSHIP STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZRD1-Zoning Resolution Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
09/15/2017120477741Open ↗
▸Seals & Professional Certifications89
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION43
09/20/2013121045458Open ↗
09/20/2013120796923Open ↗
09/19/2013120809811Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/24/2026M01173352-I1Open ↗
08/24/2026M01193671-I1Open ↗
08/23/2026M01187122-I1Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST10
06/07/2012121047107Open ↗
06/07/2012121047107Open ↗
04/19/2012121047107Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/02/2026M01179119-I1Open ↗
09/02/2026M01120308-S1Open ↗
09/02/2026M01120308-S1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
04/19/2012121047107Open ↗
04/18/2012121045458Open ↗
10/21/2011120834400Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026M01179119-I1Open ↗
09/02/2026M01120308-S1Open ↗
08/30/2026M01120308-P5Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment32
▸BISSCHEDULE B - PLUMBING14
06/14/2013120477741Open ↗
06/06/2013120477741Open ↗
05/21/2013120477750Open ↗
Showing 3 of 14 on file for this type
▸BISSELF-CERT PLUMBING NOTICE11
10/10/2013120809811Open ↗
07/03/2013120477741Open ↗
06/18/2013120477741Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
03/12/2013121398790Open ↗
10/18/2012121398790Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
05/14/2013120477750Open ↗
▸BISEQUIPMENT USE PERMITS1
05/15/2013120477741Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
05/08/2014120477821Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
01/23/2013121398790Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
03/31/2016120477741Open ↗
▸Safety & Tenant Protection23
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist12
08/13/2026M01193671-I1Open ↗
08/13/2026M01120308-I1Open ↗
08/13/2026M01120308-P3Open ↗
Showing 3 of 12 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE3
10/24/2011120477741Open ↗
10/24/2011120477741Open ↗
10/13/2011120477741Open ↗
▸BISSTREET TREE CHECKLIST2
06/25/2014120477741Open ↗
Showing 1 of 2 on file for this type
▸BISHPD-2 - Clinton Special district Anti-Harassment Checklist2
10/06/2011120834400Open ↗
Showing 1 of 2 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCertificate of No Harassment1
08/13/2026M01187122-I1Open ↗
▸Environmental & Asbestos9
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER7
10/21/2011120834400Open ↗
09/20/2011120809811Open ↗
Showing 2 of 7 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/23/2026M01187122-I1Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections1
08/29/2013120477741Open ↗
▸BISEN2 - As Built Energy Analysis1
08/29/2013120477741Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX5
12/06/2011120477741Open ↗
12/06/2011120477741Open ↗
12/06/2011120477741Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
05/13/2013120477741Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs54
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST22
09/15/2017120477741Open ↗
09/15/2017120477741Open ↗
03/31/2016120477741Open ↗
Showing 3 of 22 on file for this type
▸BISADMINISTRATIVE OBJECTIONS13
10/18/2012121398790Open ↗
04/19/2012121047107Open ↗
04/18/2012121045458Open ↗
Showing 3 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
09/20/2013121045458Open ↗
08/01/2013121047107Open ↗
04/19/2013121045458Open ↗
Showing 3 of 7 on file for this type
▸BISSHED LETTER3
04/17/2014120568554Open ↗
04/19/2013121045458Open ↗
Showing 2 of 3 on file for this type
▸BISTRANSIT AUTHORITY APPROVAL2
04/17/2014120568554Open ↗
04/17/2014120568554Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCCD1-Construction Code Determination2
10/13/2011120580326Open ↗
Showing 1 of 2 on file for this type
▸BISFA LETTER OF DEFECT : FD-FALD1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
04/17/2014120568554Open ↗
▸BISSUPERSEDING LETTER1
05/01/2013121047107Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT13
05/08/2014120477821Open ↗
02/10/2014120809811Open ↗
08/03/2013120834400Open ↗
Showing 3 of 13 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE1
10/13/2011120477741Open ↗
▸Filing & Intake Forms25
▸BISEFILING COVER SHEET16
10/18/2012121398790Open ↗
04/19/2012121047107Open ↗
04/18/2012121045458Open ↗
Showing 3 of 16 on file for this type
▸BISADDITIONAL INFORMATION9
04/29/2014120477741Open ↗
06/11/2013120809811Open ↗
05/21/2013120477750Open ↗
Showing 3 of 9 on file for this type
▸Other Documents12
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
09/28/2012120568554Open ↗
10/24/2011120477741Open ↗
Showing 2 of 6 on file for this type
▸BISSupporting Document: Fee Exempt3
06/25/2014120477741Open ↗
10/04/2011120477741Open ↗
Showing 2 of 3 on file for this type
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
08/13/2026M01173352-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01173352-I1Open ↗