RoofUnder Construction3p · 4 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Structural
temporary 8' high plywood construction fence
On file for this project
67 documents · 1 drawing sheet
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE.
On file for this project
2 documents · 1 drawing sheet
PARTIALLY DEMOLISH ABOVE-GROUND PORTION. REMAIN ALL FOUNDATION STRUCTURE ELEMENTS. ALL UTILITY SERVICE DISCONNECTION BY CONTRACTOR (SEPARATE JOB TO BE FILED BY OTHERS)
On file for this project
2 documents
Latest 3 of 4 filings on this floor.
Floor 8Under Construction1p · 2 filings · 20 docs
Architecture
Issued Permit Scope
General Construction · Protection and Mechanical Methods
temporary 8' high plywood construction fence
On file for this project
67 documents
INSTALLATION OF SINGLE MATERIAL HOIST IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
2 documents
Floor 7Under Construction1p · 2 filings · 20 docs
Architecture
Issued Permit Scope
General Construction · Protection and Mechanical Methods
temporary 8' high plywood construction fence
On file for this project
67 documents
INSTALLATION OF SINGLE MATERIAL HOIST IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
2 documents
Floor 6Under Construction34p · 2 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Structural
temporary 8' high plywood construction fence
On file for this project
67 documents
INSTALLATION OF SINGLE MATERIAL HOIST IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
2 documents
Floor 5Under Construction34p · 2 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Structural
temporary 8' high plywood construction fence
On file for this project
67 documents
INSTALLATION OF SINGLE MATERIAL HOIST IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
2 documents
Floor 4Under Construction34p · 2 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Structural
temporary 8' high plywood construction fence
On file for this project
67 documents
INSTALLATION OF SINGLE MATERIAL HOIST IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
2 documents
Floor 3Under Construction35p · 5 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Structural
temporary 8' high plywood construction fence
On file for this project
67 documents
PARTIALLY DEMOLISH ABOVE-GROUND PORTION. REMAIN ALL FOUNDATION STRUCTURE ELEMENTS. ALL UTILITY SERVICE DISCONNECTION BY CONTRACTOR (SEPARATE JOB TO BE FILED BY OTHERS)
On file for this project
2 documents
INSTALLATION OF SINGLE MATERIAL HOIST IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 2Under Construction34p · 4 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Structural
temporary 8' high plywood construction fence
On file for this project
67 documents
PARTIALLY DEMOLISH ABOVE-GROUND PORTION. REMAIN ALL FOUNDATION STRUCTURE ELEMENTS. ALL UTILITY SERVICE DISCONNECTION BY CONTRACTOR (SEPARATE JOB TO BE FILED BY OTHERS)
On file for this project
2 documents
INSTALLATION OF SINGLE MATERIAL HOIST IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
2 documents
Latest 3 of 4 filings on this floor.
Floor 1Under Construction1p · 4 filings · 20 docs
ArchitectureStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Structural
temporary 8' high plywood construction fence
On file for this project
67 documents
PARTIALLY DEMOLISH ABOVE-GROUND PORTION. REMAIN ALL FOUNDATION STRUCTURE ELEMENTS. ALL UTILITY SERVICE DISCONNECTION BY CONTRACTOR (SEPARATE JOB TO BE FILED BY OTHERS)
On file for this project
2 documents
INSTALLATION OF SINGLE MATERIAL HOIST IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
2 documents
Latest 3 of 4 filings on this floor.
CellarUnder Construction19p · 3 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
Foundation · General Construction · Protection and Mechanical Methods · Support of Excavation
temporary 8' high plywood construction fence
On file for this project
67 documents · 2 drawing sheets
INSTALLATION OF SINGLE MATERIAL HOIST IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
2 documents
Application filed to propose the installation of (2) two PTAC direct vent wall furnaces (Suburban Dynaline DL3-1220) at second floor and third floor and the removal of the gas boiler at cellar floor.
On file for this project
30 documents · 1 drawing sheet