← Back
Walk-up apt, over six families with stores
653 LENOX AVENUE
MANHATTAN · BIN 1060118
💬 Discuss this project
1920Year Built
6Stories
C7Building Class
R7-2Zoning
16,002 sfGross Floor Area
18Units
Rent Stabilized12 Open Violations ▸
Walk-up apt, over six families with stores · Owner of record: AMSTERDAM GARVEY HOUSING DEVELOPMENT FUN D CORP. · 3,992 sf lot · 4.01 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof1p · 1 filing · 9 docs
Floor 11p · 1 filing · 12 docs
Cellar3p · 1 filing · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WEST HARLEM GROUP ASSISTANCE2907/08/2026
AMSTERDAM GARVEY HOUSING DEVELOPMENT FUN D CORP.203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
P. M. ARCHITECTURE, PC1106/11/2026
ASHRAF CORP106/23/2025
MSM ENGINEERING SERVICES, PLLC104/15/2025
SYNERGIC DESIGN ARCHITECTS101/13/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PM ARCHITECTURE PC2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMERICAN STANDARD P&H CORORP.Plumbing407/08/2026
HORIZON CONSTRUCTION INCGeneral Contractor304/09/2026
ALPHA SCAFFOLDING INCGeneral Contractor204/09/2026
RICHARD NEUElectrical103/22/2026
ACCORD POWER INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING49831009/24/2025
SYNERGIC DESIGN LLC8561101/13/2025
Building Lifecycle
All (140)Filed (14)Permit Issued (10)Signed Off (8)Violation (60)Inspection (6)Objection (12)Special Inspection (30)
08/10/2026
Signed off — Alteration
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
M01047615-S1
06/11/2026
Filed — Alteration
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
M01047615-P3
06/11/2026
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
06/08/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/28/2026
Signed off — Alteration
Replace and relocate plumbing fixtures at kitchen and bath per revised layout at apt 1A. No change in use egress or occupancy.
M01285265-I1
05/01/2026
Signed off — Alteration
Replace and relocate plumbing fixtures at kitchen and bath per revised layout at apt 1A. No change in use egress or occupancy.
M01285265-S1
04/29/2026
Violation issued (HPD, closed)
A
02/12/2026
Signed off — Alteration
Interior work at common space of building and roof. All Exterior work is as per plan. No change to use, egress, or occupancy under this filing.
M00826978-I1
02/12/2026
Signed off — Alteration
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
M01047615-S2
01/16/2026
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
10/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/16/2025
Permit issued — General Construction
M00826978-I1-GC
10/16/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/11/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01208201-I1
10/11/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01244290-I1
10/09/2025
Permit issued — Plumbing
M01285265-S1-PL
10/06/2025
Permit issued — General Construction
M01285265-I1-GC
10/02/2025
Violation issued (HPD, open)
C
10/02/2025
Violation issued (HPD, closed)
C
10/02/2025
Violation issued (HPD, open)
C
09/24/2025
Filed — Alteration
Replace and relocate plumbing fixtures at kitchen and bath per revised layout at apt 1A. No change in use egress or occupancy.
M01285265-I1
09/24/2025
Filed — Alteration
Replace and relocate plumbing fixtures at kitchen and bath per revised layout at apt 1A. No change in use egress or occupancy.
M01285265-S1
09/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
09/23/2025
Special inspection requirement — Energy Code Compliance Inspections
ALEXIS SCHLESSINGERMAN
09/23/2025
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
09/10/2025
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
09/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
09/02/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
08/12/2025
Violation issued (HPD, open)
B
08/12/2025
Violation issued (HPD, open)
C
08/12/2025
Violation issued (HPD, open)
B
08/12/2025
Violation issued (HPD, open)
B
08/12/2025
Violation issued (HPD, open)
B
08/08/2025
Permit issued — Boiler Equipment
M01047615-S2-BE
07/25/2025
Filed — Alteration
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
M01047615-P2
07/15/2025
Filed — Alteration
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
M01047615-S2
07/15/2025
Filed — Alteration
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
M01047615-P1
07/15/2025
Special inspection requirement — HVAC-R and service water heating equipment
ALEXIS SCHLESSINGERMAN
07/15/2025
Special inspection requirement — Heating Systems
ALEXIS SCHLESSINGERMAN
07/15/2025
Special inspection requirement — Heating Systems
ALEXIS SCHLESSINGERMAN
07/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
07/15/2025
Special inspection requirement — HVAC-R and service water heating system controls
ALEXIS SCHLESSINGERMAN
07/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXIS SCHLESSINGERMAN
07/14/2025
Special inspection requirement — Heating Systems
ALEXIS SCHLESSINGERMAN
07/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
ALEXIS SCHLESSINGERMAN
07/03/2025
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
07/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXIS SCHLESSINGERMAN
07/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
ALEXIS SCHLESSINGERMAN
06/30/2025
Signed off — Alteration
Installation of 9.6 kw solar energy system on roof. No change of occupancy, use or egress.
M01128089-I1
06/25/2025
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
06/24/2025
Permit issued — Sidewalk Shed
M01244290-I1-SH
06/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXIS SCHLESSINGERMAN
06/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
ALEXIS SCHLESSINGERMAN
06/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
ALEXIS SCHLESSINGERMAN
06/24/2025
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
06/23/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01244290-I1
04/21/2025
Permit issued — Sidewalk Shed
M01208201-I1-SH
04/15/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01208201-I1
03/21/2025
Permit issued — Boiler Equipment
M01047615-I1-BE
03/21/2025
Permit issued — Plumbing
M01047615-S1-PL
Latest 60 of 140 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offHORIZON CONSTRUCTION INC10/16/2025
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.10/09/2025
DOB NOWGeneral ConstructionSigned-offHORIZON CONSTRUCTION INC10/06/2025
DOB NOWBoiler EquipmentSigned-offAMERICAN STANDARD P&H CORORP.08/08/2025
DOB NOWSidewalk ShedSigned-offALPHA SCAFFOLDING INC06/24/2025
DOB NOWSidewalk ShedSigned-offALPHA SCAFFOLDING INC04/21/2025
DOB NOWBoiler EquipmentSigned-offAMERICAN STANDARD P&H CORORP.03/21/2025
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.03/21/2025
DOB NOWSolarSigned-offACCORD POWER INC02/13/2025
DOB NOWGeneral ConstructionSigned-offHORIZON CONSTRUCTION INC11/04/2024
BIS—ISSUEDPYTHAGORAS GENERAL CONTRACTING04/27/2004
BISEQISSUEDPYTHAGORAS GENERAL CONTRACTING04/21/2004
BISEQISSUEDPYTHAGORAS GENERAL CONTRACTING01/07/2004
BISPLISSUEDPVTHAGORAS GENE. CONTR. CORP.09/17/2003
BISEQISSUEDPYTHAGORAS GENERAL CONTRACTING06/23/2003
BIS—ISSUEDPYTHAGORAS GENERAL CONTRACTING06/23/2003
BISEQISSUEDPATTI CONSTRUCTION CORP08/29/2001
BISOTISSUEDKOSANGEO CONSTRUCTION CORP11/20/1991
BISOTISSUEDST MARKS PLUMBING CO07/18/1991
BISPLISSUEDST MARKS PLUMBING CO07/18/1991
BISPLISSUEDA.G. CONSTRUCTION INC11/28/1990
BISOTISSUEDA.G. CONSTRUCTION INC11/28/1990
BISFBISSUEDBROOK FUEL OIL CORP.08/14/1990
2 projects · most recent 06/11/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/11/2026Signed-offAMERICAN STANDARD P&H CORGas
09/24/2025Signed-offAMERICAN STANDARD P&H CORGas, Water/Sanitary
2 projects · most recent 04/22/2025
FiledStatusContractorScope
04/22/2025CompleteRICHARD NEU—
01/13/2025CompleteACCORD POWER ELECTRIC LLC—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
01/16/2026No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
10/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/02/2025Pass-Final Boiler Equipment InspectionPassView ↗
04/06/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/03/2023Fail-Final PL - Up to 9 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
06/11/2026Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
06/08/2026Tenant Protection Plan Compliance—special
09/23/2025Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
09/23/2025Energy Code Compliance InspectionsALEXIS SCHLESSINGERMANprogress
09/23/2025Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
09/10/2025FinalALEXIS SCHLESSINGERMANprogress
09/10/2025Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
07/15/2025HVAC-R and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
07/15/2025Heating SystemsALEXIS SCHLESSINGERMANspecial
07/15/2025Heating SystemsALEXIS SCHLESSINGERMANspecial
07/15/2025Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
07/15/2025HVAC-R and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
07/15/2025HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
07/14/2025Heating SystemsALEXIS SCHLESSINGERMANspecial
07/03/2025HVAC-R and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
07/03/2025Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
07/03/2025HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
07/03/2025HVAC-R and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
06/25/2025Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
06/24/2025HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
06/24/2025HVAC-R and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
06/24/2025HVAC-R and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
06/24/2025Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
10/16/2024Air barrier - visual inspectionMalathi Ananthakrishnanenergy_progress
10/16/2024Structural Stability – Alterations of existing buildingsMalathi Ananthakrishnanspecial
Latest 25 of 55.
▾Documents — 78 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/27/2026M00826978-I1Request digital key ↗
08/27/2026M00826978-P1Request digital key ↗
08/27/2026M01055946-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Seals & Professional Certifications38
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/27/2026M00826978-I1Open ↗
08/27/2026M00826978-P1Open ↗
08/27/2026M01055946-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/23/2026M01047615-I1Open ↗
09/23/2026M01047615-S2Open ↗
08/31/2026M00826978-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/23/2026M01047615-I1Open ↗
09/23/2026M01047615-S2Open ↗
09/23/2026M01047615-I1Open ↗
Showing 3 of 12 on file for this type
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/27/2026M00826978-I1Open ↗
08/27/2026M00826978-P1Open ↗
08/27/2026M01055946-I1Open ↗
Showing 3 of 11 on file for this type
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/22/2026M01047615-I1Open ↗
▸Approvals, Objections & Sign-offs12
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter11
08/22/2026M01047615-P3Open ↗
08/13/2026M01047615-S2Open ↗
08/13/2026M01285265-S1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026M01128089-I1Open ↗
▸Other Documents2
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026M00826978-P1Open ↗
08/13/2026M00826978-I1Open ↗