Office, 20+ stories, with or without commercial
5 Grand Central East
655 3RD AVENUE · BIN 1037545
💬 Discuss this project
1958Year Built
28Stories
O4Building Class
C5-3Zoning
380,000 sfGross Floor Area
92Units
LL97 Covered0 Active ViolationsFISP: SWARMP
Office, 20+ stories, with or without commercial · Owner of record: Dolp 655 Properties II · 18,993 sf lot · 20.01 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsScaffold platform installation3 filings
RoofBuilding infrastructure upgrades and HVACUnder Construction7p · 3 filings · 13 docs
Floor 29Building infrastructure upgrades and HVACUnder Construction12p · 5 filings · 13 docs
Floor 28
Floor 27
Floor 26Shinkin Central Bank1 filing · 3 docs
Floor 25Emergency generator and infrastructure work alterationUnder Construction1 filing · 8 docs
Floor 24Sprinkler system modification4p · 2 filings · 17 docs
Floor 23
Floor 22Emergency generator and infrastructure work alterationUnder Construction1 filing · 8 docs
Floor 21Sprinkler system modification3p · 2 filings · 17 docs
Floor 20Golden ARC, Marketing floor 20Under Construction4 filings · 12 docs
Floor 19Marketing floor 20Under Construction9p · 6 filings · 20 docs
Floor 18
Floor 17
Floor 16The Durst Organization Pre-builtUnder Construction4 filings · 17 docs
Floor 15Marketing floor 16Under Construction6p · 5 filings · 13 docs
Floor 14Kastle SystemsUnder Construction1p · 5 filings · 10 docs
Floor 13Mitsubishi Chemical Holdings AmericaUnder Construction2 filings · 10 docs
Floor 12Savasta, Mitsubishi Chemical Holdings America7p · 4 filings · 10 docs
Floor 11Electrical energy code compliance2p · 2 filings · 9 docs
Floor 10Durst14p · 8 filings · 13 docs
Floor 9AB american BusinessUnder Construction11p · 7 filings · 13 docs
Floor 8Building infrastructure upgrades and HVACUnder Construction1 filing · 13 docs
Floor 7
Floor 6Sprinkler work for ESD buildout9p · 9 filings · 17 docs
Floor 5Sprinkler work for ESD buildout7p · 9 filings · 17 docs
Floor 4Building infrastructure upgrades and HVACUnder Construction6p · 11 filings · 20 docs
Floor 3Mitsubishi Chemical Holdings America9p · 11 filings · 17 docs
Floor 2Sprinkler work for ESD buildout6p · 9 filings · 17 docs
Floor 1OceanFirst Bank3 filings · 12 docs
CellarMechanical system work1p · 1 filing · 8 docs
Sub-CellarAutomatic sprinkler system installation6p · 4 filings · 15 docs
Site & exteriorPret A Manger9 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Dolp 655 Properties II64903/22/2026
The Durst Organization24910/04/2026
Durst Partners4503/21/2026
Royal Realty3607/08/2026
Dolp 655 Leasehold3403/21/2026
Dolp 1133 Properties703/21/2026
Dolp 655 L503/21/2026
Durst Building403/21/2026
1133 Building203/21/2026
Starbucks103/21/2026
1133 BLD103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J.A.M. Associates10203/21/2026
Design 2147803/21/2026
D R Brown203/21/2026
DVA Advisors203/21/2026
A1 Expediting Service403/21/2026
Project Tactical Solutions1603/21/2026
Municipal Building Consultants203/21/2026
Custodio Consulting203/21/2026
Kazam Consultants1003/21/2026
New York Sign Consultants203/21/2026
Preemptive Solutions & Consulting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Fulcrum FacilitiesGeneral Contractor1507/08/2026
Icon InteriorsGeneral Contractor1307/08/2026
Clune Construction CoGeneral Contractor1007/08/2026
John Gallin & SonGeneral Contractor607/08/2026
James E FitzgeraldGeneral Contractor607/08/2026
Structure ToneGeneral Contractor507/08/2026
Balaton ConsultingSign hanger507/08/2026
Synergy ConstructionGeneral Contractor403/21/2026
Taurino ManagementGeneral Contractor303/21/2026
Safway AtlanticScaffold304/08/2026
A&A PlumbingPlumbing307/08/2026
Abco-Peerless SprinklerFire Protection307/08/2026
SPK/Lewis ConstructionGeneral Contractor303/21/2026
PSI PartnersFire Protection307/08/2026
Lab Plumbing & Heating CoPlumbing307/08/2026
A + SprinklerFire Protection207/08/2026
LhotseGeneral Contractor203/21/2026
Par Fire ProtectionFire Protection207/08/2026
Par Plumbing CoPlumbing207/08/2026
Armon MechanicalFire Protection207/08/2026
Core Four ConstructionGeneral Contractor207/08/2026
Armon MechanicalPlumbing207/08/2026
JT Magen & CompanyGeneral Contractor203/21/2026
Sirina Fire ProtectionFire Protection107/08/2026
Fred Geller ElectricalElectrical103/22/2026
Walton Electrical ConstructionElectrical103/21/2026
Celtic Services NYCGeneral Contractor107/08/2026
Conditioning Control SystemsGeneral Contractor108/13/2026
Schimenti Construction CoScaffold107/08/2026
Spring ScaffoldingScaffold107/08/2026
Mauceri Sign CoSign hanger107/08/2026
N.Y. Sign ArtSign hanger107/08/2026
A&M Warshaw ServicesFire Protection107/08/2026
Bedrock MechanicalFire Protection106/28/2026
Bedrock Plumbing & HeatingPlumbing107/08/2026
Donato PlumbingPlumbing107/08/2026
Full Capacity FireFire Protection107/08/2026
Miller Plumbing & HeatingPlumbing107/08/2026
Miller Plumbing & HeatingFire Protection107/08/2026
S.B.A. PlumbingPlumbing107/08/2026
Fleetwood Electric CoElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Sag Engineering & Consulting608509/29/2026
EC Special Inspections8355106/26/2026
Project Tactical Solution58594505/29/2026
AK Engineering678711/06/2024
MG Engineering8546104/02/2024
Caseworks Architects, PLL1912212/12/2023
Special Inspection Services1200809/09/2021
Building Lifecycle
All (300)Filed (80)Permit Issued (80)Signed Off (45)Facade (FISP) (3)Violation (15)Inspection (47)Special Inspection (30)
09/29/2026
Filed — Alteration
Interior demo and construction for building infrastructure upgrades
M01008784-P1
09/03/2026
Special inspection requirement — Final
THOMAS LOPES
09/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chester Kowalski
09/03/2026
Special inspection requirement — Sprayed fire-resistant materials
Chester Kowalski
09/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
Chester Kowalski
08/12/2026
Permit issued — Mechanical Systems
M01388535-I1-MS
08/04/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/02/2026
Permit issued — Plumbing
M01396272-I1-PL
06/26/2026
Filed — Alteration
REMOVE AND REPLACE EXISTING WATER SOURCE HEAT PUMP WITH A LIKE FOR LIKE UNIT. REPLACE EXISTING STEAM COIL WITH A STEAM COIL OF SIMILAR CAPACITY . PROVIDE NEW DUCT CONNECTION TO NEW WSHP AND RECONNECT TO EXISTING DUCT WORK.
M01388535-I1
06/09/2026
Permit issued — Sprinklers
M01396286-I1-EW-SP
06/09/2026
Special inspection requirement — Maintenance information
Steven Bendoraitis
06/09/2026
Special inspection requirement — Heating Systems
ABDALLAH ELCHERBINI
06/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Bendoraitis
06/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
Steven Bendoraitis
06/09/2026
Special inspection requirement — High-Pressure Steam Piping (Welding)
06/08/2026
Permit issued — General Construction
M01396243-I1-GC
06/04/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/02/2026
Permit issued — Mechanical Systems
M01396250-I1-MS
05/29/2026
Filed — Alteration
Plumbing work on marketing floor 20 (construction floor 19)
M01396272-I1
05/29/2026
Filed — Alteration
Sprinkler work on marketing floor 20 (construction floor 19)
M01396286-I1
05/29/2026
Filed — Alteration
Mechanical work on marketing floor 20 (construction floor 19)
M01396250-I1
05/29/2026
Filed — Alteration
General construction work on marketing floor 20 (construction floor 19)
M01396243-I1
05/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Max Lee
05/26/2026
Permit issued — General Construction
M01008784-I1-GC
05/26/2026
Permit issued — Mechanical Systems
M01008830-I1-MS
05/26/2026
Permit issued — Structural
M01008797-I1-ST
05/07/2026
Special inspection requirement — Final
Timothy Miron
05/07/2026
Special inspection requirement — Interior lighting power
Max Lee
05/07/2026
Special inspection requirement — Post-installed Anchors
Max Lee
05/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Max Lee
05/07/2026
Special inspection requirement — Metering
Max Lee
05/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
Max Lee
05/07/2026
Special inspection requirement — Duct leakage testing, insulation and design
Max Lee
05/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Max Lee
05/07/2026
Special inspection requirement — Energy Code Compliance Inspections
Max Lee
05/07/2026
Special inspection requirement — Maintenance information
Max Lee
05/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
Max Lee
05/07/2026
Special inspection requirement — Lighting controls
Max Lee
05/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Max Lee
05/07/2026
Special inspection requirement — Post-installed Anchors
Max Lee
05/01/2026
Special inspection requirement — Mechanical Systems
Max Lee
05/01/2026
Special inspection requirement — Final
Max Lee
04/16/2026
Special inspection requirement — Mechanical Systems
ABDALLAH ELCHERBINI
04/16/2026
Special inspection requirement — Final
Steven Bendoraitis
03/27/2026
Permit issued — Suspended Scaffold
M01376494-I1-SC
03/23/2026
Filed — Alteration
INSTALLATION OF INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS.
M01376494-I1
02/04/2026
Permit issued — General Construction
M01008784-I1-GC
02/04/2026
Permit issued — Structural
M01008797-I1-ST
02/04/2026
Permit issued — Mechanical Systems
M01008830-I1-MS
01/27/2026
Signed off — Alteration
FILING HEREWITH MODIFICATION OF EXISTING SPRINKLER SYSTEM AND INSTALLATION OF TCSP AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01168163-I1
01/14/2026
Signed off — Alteration
Erect non illuminated non advertising sign on wall.- 5 Grand Central East- No change of use, egress or occupancy
M01312812-I1
11/13/2025
Permit issued — Sign
M01312812-I1-SG
11/07/2025
Filed — Alteration
Erect non illuminated non advertising sign on wall.- 5 Grand Central East- No change of use, egress or occupancy
M01312812-I1
11/03/2025
Special inspection requirement — Final
Richard Wainer
10/20/2025
Signed off — Alteration
M01155092-I1
10/03/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/23/2025
Signed off — Alteration
M01155096-I1
09/23/2025
Signed off — Alteration
Mechanical work for PMO on construction floor subcellar (marketing C2 level)
M01155083-I1
09/23/2025
Signed off — Alteration
M01155202-I1
09/04/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedConditioning Control Systems08/12/2026
DOB NOWPlumbingPermit IssuedA&A Plumbing07/02/2026
DOB NOWSprinklersPermit IssuedPSI Partners06/09/2026
DOB NOWGeneral ConstructionPermit IssuedClune Construction Co06/08/2026
DOB NOWMechanical SystemsPermit IssuedClune Construction Co06/02/2026
DOB NOWGeneral ConstructionPermit IssuedFulcrum Facilities05/26/2026
DOB NOWMechanical SystemsPermit IssuedFulcrum Facilities05/26/2026
DOB NOWStructuralPermit IssuedFulcrum Facilities05/26/2026
DOB NOWSuspended ScaffoldPermit IssuedCentral Construction Management03/27/2026
DOB NOWGeneral ConstructionPermit IssuedFulcrum Facilities02/04/2026
DOB NOWStructuralPermit IssuedFulcrum Facilities02/04/2026
DOB NOWMechanical SystemsPermit IssuedFulcrum Facilities02/04/2026
DOB NOWSignSigned-offSkanska Building11/13/2025
DOB NOWSprinklersSigned-offFull Capacity Fire03/17/2025
DOB NOWGeneral ConstructionPermit IssuedJohn Gallin Son03/14/2025
DOB NOWSprinklersPermit IssuedBedrock Mechanical03/14/2025
DOB NOWMechanical SystemsPermit IssuedJohn Gallin Son03/13/2025
DOB NOWGeneral ConstructionPermit IssuedJohn Gallin Son03/04/2025
DOB NOWPlumbingSigned-offA&A Plumbing02/18/2025
DOB NOWSprinklersSigned-offA + Sprinkler02/12/2025
DOB NOWGeneral ConstructionPermit IssuedCeltic Services NYC02/07/2025
DOB NOWMechanical SystemsSigned-offCore Four Construction01/23/2025
DOB NOWGeneral ConstructionSigned-offCore Four Construction01/21/2025
DOB NOWSupported ScaffoldPermit IssuedSafway Atlantic12/06/2024
DOB NOWGeneral ConstructionSigned-offSPK/Lewis Construction06/28/2024
DOB NOWGeneral ConstructionPermit IssuedFulcrum Facilities06/04/2024
DOB NOWMechanical SystemsPermit IssuedFulcrum Facilities06/04/2024
DOB NOWStructuralPermit IssuedFulcrum Facilities06/04/2024
DOB NOWPlumbingSigned-offDonato Plumbing04/26/2024
DOB NOWSprinklersSigned-offA + Sprinkler04/16/2024
DOB NOWMechanical SystemsSigned-offClune Construction Co04/15/2024
DOB NOWGeneral ConstructionSigned-offClune Construction Co04/12/2024
DOB NOWSprinklersSigned-offMora Fire Protection04/01/2024
DOB NOWGeneral ConstructionSigned-offClune Construction Co03/26/2024
DOB NOWMechanical SystemsSigned-offClune Construction Co03/22/2024
DOB NOWSupported ScaffoldPermit IssuedSafway Atlantic02/13/2024
DOB NOWSprinklersSigned-offA&M Warshaw Services10/06/2023
DOB NOWPlumbingPermit IssuedMiller Plumbing & Heating09/07/2023
DOB NOWSprinklersPermit IssuedMiller Plumbing & Heating09/07/2023
DOB NOWGeneral ConstructionSigned-offSynergy Construction09/05/2023
+ 60 more permits on file
2 projects · most recent 06/26/2026
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
06/26/2026Permit IssuedConditioning Control SystemsAir Conditioning Systems, Heating Systems
Cooling
Bosch WSHP-6/ CL070-3HZC 67,000 BTU · Heat Pump Outdoor ×1
Heating
Bosch WSHP-6/ CL070-3HZC 80,700 BTU · Heat Pump Outdoor ×1
02/24/2025Permit IssuedJohn Gallin & SonAir Conditioning Systems
Cooling
Water Furnace V5AH024BS3AG1DERBANR010SSS 25,610 BTU · Wshp ×1
4 projects · most recent 05/29/2026
FiledStatusContractorScope
05/29/2026Permit IssuedPSI Partners52 heads
02/24/2025Permit IssuedBedrock Mechanical16 heads
08/28/2023Permit IssuedMiller Plumbing & Heating108 heads
09/09/2021Permit IssuedSirina Fire Protection184 heads
2 projects · most recent 05/29/2026
Water/Sanitary
FiledStatusContractorScope
05/29/2026Permit IssuedA&A PlumbingWater/Sanitary
05/20/2024——Water/Sanitary
25 projects · most recent 06/05/2026
General Wiring
FiledStatusContractorScope
06/05/2026Permit IssuedCloonagh ElectricalGeneral Wiring
05/29/2026Permit IssuedJam Electrical—
12/05/2025Permit IssuedFred Geller ElectricalGeneral Wiring
03/20/2025CompleteEnnell Group ElectricGeneral Wiring
03/12/2025CompleteMRD Electrical ServicesGeneral Wiring
01/08/2025CompleteRX ElectricGeneral Wiring
05/03/2024CompleteM.C. Electrical NYGeneral Wiring
03/25/2024CompleteEpic ElectricGeneral Wiring
08/23/2023CompleteRX Electric—
07/19/2023Permit IssuedUnited Electric & Lighting CoGeneral Wiring
06/05/2023CompleteTop Shelf Electric—
09/15/2022CompleteCrosswire ElectricalGeneral Wiring
09/10/2021CompleteP.E. StoneGeneral Wiring
05/27/2021CompleteFred Geller ElectricalGeneral Wiring
05/21/2021CompleteFred Geller ElectricalGeneral Wiring
1 project · most recent 03/23/2026
FiledStatusContractorScope
03/23/2026Permit IssuedCentral Construction Management—
▾Field Inspections (DOB CAP) — 49
DateTypeResultReport
08/04/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/04/2026Pass-Final PL - UndergroundPassView ↗
10/03/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/04/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/02/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/13/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/09/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/29/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/24/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/06/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/02/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/18/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/18/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/22/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/21/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/14/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/05/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/05/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/31/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/09/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/05/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/15/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/09/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
Latest 25 of 49.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
09/03/2026Fire-Resistance Rated ConstructionChester Kowalskiprogress
09/03/2026FinalTHOMAS LOPESprogress
09/03/2026Sprayed fire-resistant materialsChester Kowalskispecial
09/03/2026Fire-Resistant Penetrations and JointsChester Kowalskispecial
06/09/2026HVAC-R and service water piping design and insulationSteven Bendoraitisenergy_progress
06/09/2026Heating SystemsABDALLAH ELCHERBINIspecial
06/09/2026Maintenance informationSteven Bendoraitisenergy_progress
06/09/2026High-Pressure Steam Piping (Welding)—special
06/09/2026HVAC-R and service water heating equipmentSteven Bendoraitisenergy_progress
05/28/2026Fire-Resistant Penetrations and JointsMax Leespecial
05/07/2026Post-installed AnchorsMax Leespecial
05/07/2026FinalTimothy Mironprogress
05/07/2026Post-installed AnchorsMax Leespecial
05/07/2026Fire-Resistant Penetrations and JointsMax Leespecial
05/07/2026HVAC-R and service water piping design and insulationMax Leeenergy_progress
05/07/2026HVAC-R and service water heating equipmentMax Leeenergy_progress
05/07/2026HVAC-R and service water heating system controlsMax Leeenergy_progress
05/07/2026Duct leakage testing, insulation and designMax Leeenergy_progress
05/07/2026Maintenance informationMax Leeenergy_progress
05/07/2026MeteringMax Leeenergy_progress
05/07/2026Lighting controlsMax Leeenergy_progress
05/07/2026Interior lighting powerMax Leeenergy_progress
05/07/2026Energy Code Compliance InspectionsMax Leeprogress
05/07/2026Fire-Resistant Penetrations and JointsMax Leespecial
05/01/2026Mechanical SystemsMax Leespecial
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Shinkin Central BankOfficeFloor 26
Project M01065649 Alteration · LOC Issued · 06/21/2024
Golden ARCOfficeFloor 20
Project M01002084 Alteration · LOC Issued · 03/19/2024
Project M01002104 Alteration · LOC Issued · 03/19/2024
Project M01002166 Alteration · LOC Issued · 03/19/2024
Kastle SystemsOfficeFloor 14
Project M00887760 Alteration · LOC Issued · 07/05/2023
Project M00887765 Alteration · LOC Issued · 07/05/2023
Project M00887771 Alteration · LOC Issued · 07/05/2023
Project M00898218 Alteration · LOC Issued · 07/05/2023
OceanFirst BankBank / Financial branchFloor 1
Project M00812025 Alteration · LOC Issued · 01/19/2023
Project M00388615 Alteration · Permit Entire · 11/13/2020
DurstOfficeFloor 10
Project M00572633 Alteration · Permit Entire · 09/09/2021
Project M00572634 Alteration · Permit Entire · 09/09/2021
Project M00572635 Alteration · Permit Entire · 09/09/2021
Project M00572632 Alteration · Permit Entire · 09/08/2021
SavastaOfficeFloor 12
Project M00397918 Alteration · LOC Issued · 09/17/2020
Mitsubishi Chemical Holdings AmericaOfficeFloors 3, 12
Project M00368972 Alteration · LOC Issued · 08/03/2020
Project M00368981 Alteration · LOC Issued · 08/03/2020
Project M07995610 Alteration · LOC Issued · 10/11/2022
Project M07995625 Alteration · LOC Issued · 10/11/2022
AB american BusinessOfficeFloor 9
Project M00208511 Alteration · LOC Issued · 09/20/2019
Project M00208524 Alteration · LOC Issued · 09/19/2019
Pret A MangerRestaurant / Food ServiceFloor 1
Project M00031888 Alteration · LOC Issued · 04/17/2018
Project M00031891 Alteration · LOC Issued · 04/17/2018
Project M00031897 Alteration · LOC Issued · 04/17/2018
Project M00031898 Alteration · LOC Issued · 04/17/2018
Project M00031901 Alteration · LOC Issued · 04/17/2018
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 2,654 on file (BIS + DOB NOW)
▸Plans & Drawings98
▸DOB NOWPlans/Sketch81
09/06/2026M00022504-I1Request digital key ↗
09/06/2026M00031891-I1Request digital key ↗
09/06/2026M00031898-I1Request digital key ↗
Showing 3 of 81 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
09/05/2026M00208524-I1Request digital key ↗
09/05/2026M00216091-I1Request digital key ↗
09/04/2026M00368981-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
09/05/2026M00216082-I1Request digital key ↗
09/04/2026M00368972-I1Request digital key ↗
09/04/2026M00208511-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
09/05/2026M00208524-I1Request digital key ↗
09/05/2026M00216091-I1Request digital key ↗
09/04/2026M00368981-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural2
09/04/2026M00375155-I1Request digital key ↗
09/04/2026M00375155-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
09/04/2026M00388615-I1Request digital key ↗
▸Applications & Permits478
▸BISPLAN / WORK APPROVAL APPLICATION258
10/30/2024123152550Open ↗
10/24/2024123152550Open ↗
10/24/2024123152550Open ↗
Showing 3 of 258 on file for this type
▸BISWORK PERMIT APPLICATION218
09/22/2020140953966Open ↗
08/18/2020140928897Open ↗
11/06/2019123490873Open ↗
Showing 3 of 218 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications725
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION296
05/01/2020123544619Open ↗
03/11/2020123544619Open ↗
03/02/2020123490873Open ↗
Showing 3 of 296 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature93
10/05/2026M01008784-P1Open ↗
09/06/2026M00031888-I1Open ↗
09/06/2026M00031901-I1Open ↗
Showing 3 of 93 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST91
09/04/2019123770749Open ↗
09/03/2019123799498Open ↗
Showing 2 of 91 on file for this type
▸DOB NOWProgress Inspector Seal & Signature67
10/05/2026M01008784-P1Open ↗
10/05/2026M01008784-P1Open ↗
09/17/2026M00906774-I1Open ↗
Showing 3 of 67 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature61
10/05/2026M01008784-P1Open ↗
10/05/2026M01008784-P1Open ↗
09/23/2026M00368981-I1Open ↗
Showing 3 of 61 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT57
09/17/2020140953966Open ↗
07/23/2020140928897Open ↗
09/04/2019123770749Open ↗
Showing 3 of 57 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM51
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 51 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
09/17/2020140953966Open ↗
07/23/2020140928897Open ↗
Showing 2 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
09/17/2020140953966Open ↗
07/23/2020140928897Open ↗
Showing 2 of 3 on file for this type
▸BISPC FULL REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Trade Schedules & Equipment261
▸BISSELF-CERT PLUMBING NOTICE84
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 84 on file for this type
▸BISSCHEDULE B - PLUMBING55
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 55 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE44
08/30/2019123508203Open ↗
08/28/2019123508203Open ↗
02/21/2019123544619Open ↗
Showing 3 of 44 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA37
12/14/2021122880392Open ↗
08/11/2021123414359Open ↗
08/11/2021123235347Open ↗
Showing 3 of 37 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISEQUIPMENT USE PERMITS12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8511
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection18
▸BISTenant Protection Plan and Notes17
09/04/2019123770749Open ↗
09/03/2019123799498Open ↗
Showing 2 of 17 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos239
▸BISASBESTOS: CERTIFICATION (DEP ACP5)90
09/17/2020140953966Open ↗
09/04/2019123770749Open ↗
09/03/2019123799498Open ↗
Showing 3 of 90 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report85
10/05/2026M01008784-P1Open ↗
09/06/2026M00031888-I1Open ↗
09/06/2026M00031901-I1Open ↗
Showing 3 of 85 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'52
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 52 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
09/04/2026M00368972-I1Open ↗
09/04/2026M00375155-I1Open ↗
Showing 2 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance141
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS78
05/01/2020123544619Open ↗
03/02/2020123490873Open ↗
03/02/2020123490873Open ↗
Showing 3 of 78 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS29
04/22/2021140953966Open ↗
02/26/2021140928897Open ↗
12/24/2020123799498Open ↗
Showing 3 of 29 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY11
04/22/2021140953966Open ↗
02/26/2021140928897Open ↗
12/24/2020123799498Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISTR8: Energy Code Progress Inspections6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISNYCECC ANALYSIS2
09/17/2020140953966Open ↗
07/23/2020140928897Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
09/17/2020140953966Open ↗
07/23/2020140928897Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/06/2020123508276Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports24
▸BISTECHNICAL REPORT: RESPONSIBILITY19
04/22/2021140953966Open ↗
02/26/2021140928897Open ↗
12/24/2020123799498Open ↗
Showing 3 of 19 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs170
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST98
08/13/2021123414359Open ↗
08/13/2021123235347Open ↗
04/22/2021140953966Open ↗
Showing 3 of 98 on file for this type
▸BISADMINISTRATIVE OBJECTIONS62
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 62 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSUPERSEDING LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership245
▸BISCOST AFFIDAVIT241
08/13/2021123414359Open ↗
08/13/2021123235347Open ↗
04/22/2021140953966Open ↗
Showing 3 of 241 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
09/17/2020123770749Open ↗
08/13/2020123545333Open ↗
07/06/2020123508276Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE (PGLI)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms244
▸BISEFILING COVER SHEET166
09/04/2019123770749Open ↗
09/03/2019123799498Open ↗
Showing 2 of 166 on file for this type
▸BISBOROUGH INTAKE FORM43
05/01/2020123544619Open ↗
05/01/2020123235329Open ↗
04/20/2020123235329Open ↗
Showing 3 of 43 on file for this type
▸BISADDITIONAL INFORMATION29
11/09/2020140928897Open ↗
08/30/2019123508203Open ↗
04/24/2019123480517Open ↗
Showing 3 of 29 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
09/17/2020140953966Open ↗
07/23/2020140928897Open ↗
Showing 2 of 6 on file for this type
▸Other Documents9
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISUnknown3
10/24/2019123508203Open ↗
10/24/2019123508203Open ↗
10/24/2019123508203Open ↗
▸BISTEMPORARY FLOOD SHIELDS: EMERGENCY FLOOD PLAN2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWIRA Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type