Condo, residential tower (mixed-use, multi-family elevator) [derived]
The Hutwelker Condominium
655 5 AVENUE · BIN 3330251
💬 Discuss this project
1931Year Built
4Stories
RMBuilding Class
R6AZoning
13,797 sfGross Floor Area
17Units
Rent Stabilized1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 4,567 sf lot · 3.02 FAR built · Flood zone X
Locations of Work
StructuralMechanical
Roof2p · 2 filings · 8 docs
Floor 21p · 1 filing · 4 docs
Floor 11p · 1 filing · 4 docs
Cellar2p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
50 WEST STREET CONDOMINIUM2307/08/2026
TIME EQUITIES2107/08/2026
JERRICK ASSOCIATES507/08/2026
KAJ NY CONSTRUCTION INC503/22/2026
HUTWELKER CONDOMINIUM1203/22/2026
655 FIFTH DUTCH EQUITIES, LLC2903/22/2026
LEXXUS CONTRACTING403/22/2026
EQUITIES TIME303/22/2026
SUKHMANY CONSTRUCTION INC103/21/2026
SILVER CUP SCAFFOLDING 1 LLC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS1403/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
AE DESIGN SOLUTION203/21/2026
UNITED SAFETY CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AV BRAD CONSTRUCTION LLCGeneral Contractor1107/08/2026
VOLTAGE ELECTRIC CORPElectrical303/22/2026
G.P. MECHANICAL CORPPlumbing307/08/2026
KAJ NY CONSTRUCTION INCGeneral Contractor303/21/2026
HI COOL INCGeneral Contractor207/08/2026
TROADIO MENENDEZElectrical103/21/2026
4IR IDEAL INCGeneral Contractor107/08/2026
ISTVAN DANCSElectrical103/21/2026
BOROWIDE ELECT'L CONTR'SElectrical103/22/2026
JERRICK ASSOCIATES INCGeneral Contractor107/08/2026
IRVING BAPTISTEElectrical103/21/2026
MOHAMMED S ISLAMGeneral Contractor107/08/2026
QUINTUNA SERVICE CORPGeneral Contractor107/08/2026
SPRING SCAFFOLDING LLCGeneral Contractor107/08/2026
VOLTAGE ELECTRIC CORP 003532General Contractor103/22/2026
CHAIM GOLDRINGElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOLOMON ROSENZWEIG P.E. P1801207/28/2023
RICHARD H. BALSER ENGINEE30281211/02/2022
JOSEPH BOTTA, PE, PC1139208/22/2021
OBAID MIAN849107/29/2019
Building Lifecycle
All (177)Filed (22)Permit Issued (18)Signed Off (12)Violation (36)Inspection (9)Objection (50)Special Inspection (30)
06/12/2024
Signed off — Alteration
Installation of pipe scaffold as indicated on the attached drawings. There are no changes in use, egress or occupancy.
B00882013-I1
12/12/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/30/2023
Signed off — Alteration
B00568413-I1
10/27/2023
Filed — Alteration
Installation of pipe scaffold as indicated on the attached drawings. There are no changes in use, egress or occupancy.
B00882013-P1
10/04/2023
Signed off — Alteration
RESTORATION OF THREE DOORS OF ACCESSORY STORAGES AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B08026356-I1
09/06/2023
Permit issued — General Construction
B00908237-I1-GC
08/03/2023
Objection raised — Scope
08/03/2023
Objection resolved — Addressed
08/03/2023
Objection raised — Other
08/03/2023
Objection resolved — Addressed
08/03/2023
Objection raised — Scope
08/03/2023
Objection resolved — Addressed
07/28/2023
Filed — Alteration
Exterior Facade restoration upon observed condition. Brick pointing and rebuilding
B00908237-I1
06/07/2023
Filed — Alteration
Installation of pipe scaffold as indicated on the attached drawings. There are no changes in use, egress or occupancy.
B00882013-I1
06/07/2023
Permit issued — Supported Scaffold
B00882013-I1-SF
05/02/2023
Permit issued — General Construction
B08026356-I1-GC
12/15/2022
Permit issued — General Construction
B08026356-I1-GC
11/09/2022
Objection raised — Structural
11/09/2022
Objection resolved — Addressed
11/09/2022
Objection raised — Scope
11/09/2022
Objection resolved — Addressed
11/07/2022
Violation issued (ECB, closed)
Construction
11/02/2022
Filed — Alteration
RESTORATION OF THREE DOORS OF ACCESSORY STORAGES AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B08026356-I1
10/24/2022
Special inspection requirement — Final
JACOB BUKSBAUM
10/24/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Balser Richard
10/24/2022
Special inspection requirement — Energy Code Compliance Inspections
JACOB BUKSBAUM
09/06/2022
Signed off — Alteration
PLUMBING WORK FOR RENOVATION OF EXISTING APARTMENT SPACE 1D AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00508861-I1
09/06/2022
Signed off — Alteration
B00508133-I1
08/18/2022
Permit issued — General Construction
B00508133-I1-GC
08/17/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/03/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/20/2022
Signed off — Alteration
PLUMBING WORK FOR RENOVATION OF EXISTING APARTMENT SPACE 1C, AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B00498405-I1
04/12/2022
Signed off — Alteration
Removal of non load bearing partitions and door between bedroom and living room. Path, repair and repaint. Relocate two split wall unit AC to adjacent walls.
B00600776-I1
03/24/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/17/2022
Filed — Alteration
PLUMBING WORK FOR RENOVATION OF EXISTING APARTMENT SPACE 1C, AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B00498405-P2
03/17/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Balser Richard
03/17/2022
Special inspection requirement — Energy Code Compliance Inspections
JACOB BUKSBAUM
03/17/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
JACOB BUKSBAUM
03/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Balser Richard
03/16/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
JACOB BUKSBAUM
03/16/2022
Special inspection requirement — Energy Code Compliance Inspections
JACOB BUKSBAUM
03/09/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/07/2022
Permit issued — General Construction
B00600776-I1-GC
03/02/2022
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING APARTMENT SPACE #1C, AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B00498349-I1
02/24/2022
Special inspection requirement — Energy Code Compliance Inspections
JACOB BUKSBAUM
02/24/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
JACOB BUKSBAUM
02/24/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Balser Richard
02/17/2022
Special inspection requirement — Fire-Resistance Rated Construction
JACOB BUKSBAUM
02/17/2022
Special inspection requirement — Final
JACOB BUKSBAUM
02/17/2022
Special inspection requirement — Energy Code Compliance Inspections
JACOB BUKSBAUM
02/17/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Balser Richard
02/17/2022
Special inspection requirement — Lighting controls
JACOB BUKSBAUM
02/17/2022
Special inspection requirement — Lighting in dwelling units
JACOB BUKSBAUM
02/16/2022
Filed — Alteration
PLUMBING WORK FOR RENOVATION OF EXISTING APARTMENT SPACE 1D AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00508861-P2
02/16/2022
Filed — Alteration
B00508133-P1
02/16/2022
Special inspection requirement — Energy Code Compliance Inspections
JACOB BUKSBAUM
02/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Balser Richard
02/16/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
JACOB BUKSBAUM
02/11/2022
Violation issued (ECB, closed)
Elevators
01/31/2022
Violation issued (ECB, open)
Construction
Latest 60 of 177 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offQUINTUNA SERVICE CORP09/06/2023
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC06/07/2023
DOB NOWGeneral ConstructionSigned-offAV BRAD CONSTRUCTION05/02/2023
DOB NOWGeneral ConstructionSigned-offAV BRAD CONSTRUCTION12/15/2022
DOB NOWGeneral ConstructionSigned-offAV BRAD CONSTRUCTION08/18/2022
DOB NOWGeneral ConstructionSigned-offMOHAMMED S ISLAM03/07/2022
DOB NOWPlumbingSigned-offG.P. MECHANICAL CORP12/10/2021
DOB NOWMechanical SystemsSigned-offHI COOL INC11/08/2021
DOB NOWStructuralSigned-offAV BRAD CONSTRUCTION11/01/2021
DOB NOWGeneral ConstructionSigned-offAV BRAD CONSTRUCTION07/20/2021
DOB NOWGeneral ConstructionSigned-offAV BRAD CONSTRUCTION07/19/2021
DOB NOWPlumbingSigned-offG.P. MECHANICAL CORP06/11/2021
DOB NOWGeneral ConstructionSigned-offAV BRAD CONSTRUCTION05/25/2021
DOB NOWPlumbingSigned-offG.P. MECHANICAL CORP03/26/2021
DOB NOWMechanical SystemsPermit IssuedHI COOL INC03/12/2021
DOB NOWSidewalk ShedPermit IssuedKAJ NY CONSTRUCTION INC11/10/2020
DOB NOWMechanical SystemsSigned-off4IR IDEAL08/13/2019
DOB NOWSidewalk ShedSigned-offGE 2A CONSTRUCTION12/14/2017
BISSPISSUEDKAPNAG HEATING & PLBG COR09/13/2022
BISSPISSUEDKAPNAG HEATING & PLBG COR09/13/2022
BISSPISSUEDKAPNAG HEATING & PLBG COR09/13/2022
BISOTISSUEDLEXXUS CONTRACTING AND DE03/24/2021
BISEQISSUEDLEXXUS CONTRACTING AND DE12/08/2020
BISOTISSUEDLEXXUS CONTRACTING AND DE11/13/2020
BISOTISSUEDAV BRAD CONSTRUCTION LLC02/13/2020
BISOTISSUEDJERRICK ASSOCIATES INC10/02/2019
BISMHISSUEDICE AGE MECHANICAL CORP09/25/2019
BISPLISSUEDRRP PLUMBING CORP12/11/2018
BISOTISSUEDV B BRAD CONSTRUCTION LLC10/17/2018
BISPLISSUEDDOVAL PLBG & HTG CORP12/22/2017
BISSPISSUEDDOVAL PLBG & HTG CORP12/22/2017
BISPLISSUEDTOP DOG PLBG & HTG CORP04/17/2017
BISSPISSUEDCASE PLUMBING LLC01/11/2017
BISOTISSUEDV B BRAD CONSTRUCTION LLC11/15/2016
BISOTISSUEDV B BRAD CONSTRUCTION LLC11/15/2016
BISPLISSUEDTW PLUMBING & HEATING INC09/20/2016
BISOTISSUEDV B BRAD CONSTRUCTION LLC08/30/2016
BISOTISSUEDV B BRAD CONSTRUCTION LLC08/30/2016
BISPLISSUEDDOVAL PLBG & HTG CORP03/23/2016
BISSPISSUEDDOVAL PLBG & HTG CORP03/07/2016
+ 11 more permits on file
13 projects · most recent 07/09/2025
General Wiring
FiledStatusContractorScope
07/09/2025CancelledPLATINUM PWR ELECTL CONT5 meters, 1 new_meters
07/31/2023CompleteVOLTAGE ELECTRIC CORP—
11/29/2022CompleteVOLTAGE ELECTRIC CORPGeneral Wiring
06/08/2022CompleteVOLTAGE ELECTRIC CORPGeneral Wiring
03/07/2022CompleteVOLTAGE ELECTRIC CORP—
11/29/2021CompleteVOLTAGE ELECTRIC CORP—
11/10/2021CompleteVOLTAGE ELECTRIC CORPGeneral Wiring
06/01/2021CompleteVOLTAGE ELECTRIC CORP—
04/20/2021CompleteVOLTAGE ELECTRIC CORP—
11/11/2020Permit IssuedRICHARD NEU—
02/21/2019CompleteVOLTAGE ELECTRIC CORP—
12/14/2018Permit IssuedVOLTAGE ELECTRIC CORPGeneral Wiring
12/08/2017CompleteBOROWIDE ELECT'L CONTR'S—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
12/12/2023Pass-Final General Construction Non-Directive 14PassView ↗
08/17/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/03/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/24/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/09/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/17/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/17/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/24/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/24/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
10/24/2022FinalJACOB BUKSBAUMprogress
10/24/2022Fire-Resistant Penetrations and JointsBalser Richardspecial
10/24/2022Energy Code Compliance InspectionsJACOB BUKSBAUMprogress
03/17/2022Fire-Resistant Penetrations and JointsBalser Richardspecial
03/17/2022Energy Code Compliance InspectionsJACOB BUKSBAUMprogress
03/17/2022HVAC-R and service water piping design and insulationJACOB BUKSBAUMenergy_progress
03/16/2022Fire-Resistant Penetrations and JointsBalser Richardspecial
03/16/2022HVAC-R and service water piping design and insulationJACOB BUKSBAUMenergy_progress
03/16/2022Energy Code Compliance InspectionsJACOB BUKSBAUMprogress
02/24/2022Energy Code Compliance InspectionsJACOB BUKSBAUMprogress
02/24/2022HVAC-R and service water piping design and insulationJACOB BUKSBAUMenergy_progress
02/24/2022Fire-Resistant Penetrations and JointsBalser Richardspecial
02/17/2022Fire-Resistance Rated ConstructionJACOB BUKSBAUMprogress
02/17/2022FinalJACOB BUKSBAUMprogress
02/17/2022Energy Code Compliance InspectionsJACOB BUKSBAUMprogress
02/17/2022Fire-Resistant Penetrations and JointsBalser Richardspecial
02/17/2022Lighting controlsJACOB BUKSBAUMenergy_progress
02/17/2022Lighting in dwelling unitsJACOB BUKSBAUMenergy_progress
02/16/2022Energy Code Compliance InspectionsJACOB BUKSBAUMprogress
02/16/2022Fire-Resistant Penetrations and JointsBalser Richardspecial
02/16/2022HVAC-R and service water piping design and insulationJACOB BUKSBAUMenergy_progress
10/15/2021HVAC-R and service water piping design and insulationJACOB BUKSBAUMenergy_progress
10/15/2021Fire-Resistant Penetrations and JointsBalser Richardspecial
10/15/2021Energy Code Compliance InspectionsJACOB BUKSBAUMprogress
09/27/2021FinalWILLIAM ROSENBLUMprogress
Latest 25 of 36.
▾Documents — 491 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch17
09/03/2026B00003623-I1Request digital key ↗
09/01/2026B00498405-P1Request digital key ↗
09/01/2026B00498405-P2Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00405037-P1Request digital key ↗
08/14/2026B00405037-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026B00189664-I1Request digital key ↗
09/01/2026B00463455-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00425491-I1Request digital key ↗
▸Applications & Permits86
▸BISPLAN / WORK APPROVAL APPLICATION47
05/23/2025321435559Open ↗
05/16/2025321435559Open ↗
06/20/2024321995640Open ↗
Showing 3 of 47 on file for this type
▸BISWORK PERMIT APPLICATION31
09/16/2022321435443Open ↗
09/16/2022321463340Open ↗
09/16/2022321283767Open ↗
Showing 3 of 31 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION7
11/13/2020340777270Open ↗
09/20/2019321629092Open ↗
03/04/2019321827412Open ↗
Showing 3 of 7 on file for this type
▸BISLimited Alteration Application (LAA1)1
07/05/2019321827412Open ↗
▸Seals & Professional Certifications124
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION39
04/09/2020340686323Open ↗
04/09/2020340686323Open ↗
03/27/2020321629092Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature22
09/03/2026B00003623-I1Open ↗
09/02/2026B00405037-I1Open ↗
09/02/2026B00405037-P1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature21
09/21/2026B00498405-P2Open ↗
09/21/2026B00498405-P2Open ↗
09/01/2026B00003623-I1Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
10/19/2018321827412Open ↗
Showing 1 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
12/03/2020340792663Open ↗
10/19/2018321827412Open ↗
Showing 2 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/21/2026B00498405-P2Open ↗
08/29/2026B00498405-P1Open ↗
08/28/2026B00498349-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
12/03/2020340792663Open ↗
11/06/2020340782674Open ↗
Showing 2 of 4 on file for this type
▸BISProfessional and Owner Certification (POC3)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
12/03/2020340792663Open ↗
Showing 1 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
11/06/2020340782674Open ↗
10/30/2020340777270Open ↗
07/10/2019340686323Open ↗
▸BISPROFESSIONAL/OWNER SIGNATURES1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment21
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE12
10/19/2018321827412Open ↗
09/10/2018321629092Open ↗
Showing 2 of 12 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION5
09/20/2019321629092Open ↗
Showing 1 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE PERMITS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSPRINKLER SYSTEMS1
07/21/2022321283767Open ↗
▸Safety & Tenant Protection17
▸BISTenant Protection Plan and Notes13
06/21/2019321967662Open ↗
04/18/2019321956460Open ↗
10/19/2018321827412Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWTenant Protection Plan4
09/02/2026B00405037-P1Open ↗
08/14/2026B00405037-I1Open ↗
08/13/2026B00425491-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos34
▸DOB NOWDEP ACP-5: Asbestos Assessment Report18
09/02/2026B00405037-P1Open ↗
09/01/2026B00463455-I1Open ↗
09/01/2026B00498405-I1Open ↗
Showing 3 of 18 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)14
11/06/2020340782674Open ↗
06/21/2019321967662Open ↗
04/18/2019321956460Open ↗
Showing 3 of 14 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
11/13/2020340777270Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance42
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS14
03/27/2020321629092Open ↗
08/28/2019321967662Open ↗
08/01/2019321956460Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY10
06/03/2025321435559Open ↗
11/09/2021340782674Open ↗
06/29/2021340777270Open ↗
Showing 3 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
06/03/2025321435559Open ↗
11/09/2021340782674Open ↗
04/09/2020340686323Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.6
08/15/2026B00498349-I1Open ↗
08/14/2026B00405037-I1Open ↗
08/14/2026B00508861-I1Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
02/28/2023321967662Open ↗
06/16/2021340777270Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/24/2023321967662Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/06/2020340782674Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports24
▸BISTECHNICAL REPORT: RESPONSIBILITY19
06/03/2025321435559Open ↗
06/03/2025321435559Open ↗
06/03/2025321435559Open ↗
Showing 3 of 19 on file for this type
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS2
02/24/2023321967662Open ↗
02/24/2023321967662Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
02/24/2023321967662Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
03/27/2020321629092Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
02/24/2023321967662Open ↗
▸Approvals, Objections & Sign-offs26
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST18
02/28/2023321967662Open ↗
09/22/2022321283767Open ↗
09/20/2022321463340Open ↗
Showing 3 of 18 on file for this type
▸BISFINAL2
02/24/2023321967662Open ↗
02/24/2023321967662Open ↗
▸BISSUPERSEDING LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/13/2026B00882013-P1Open ↗
08/13/2026B00882013-I1Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership36
▸BISCOST AFFIDAVIT30
06/04/2025321435559Open ↗
06/04/2025321435559Open ↗
06/03/2025321435559Open ↗
Showing 3 of 30 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW35
02/24/2023321967662Open ↗
07/21/2022321435443Open ↗
07/21/2022321463340Open ↗
Showing 3 of 5 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms52
▸BISEFILING COVER SHEET19
06/17/2024321995640Open ↗
06/21/2019321967662Open ↗
04/18/2019321956460Open ↗
Showing 3 of 19 on file for this type
▸BISADDITIONAL INFORMATION15
03/31/2021340782674Open ↗
11/25/2020340777270Open ↗
03/18/2020321629092Open ↗
Showing 3 of 15 on file for this type
▸BISBOROUGH INTAKE FORM12
09/16/2022321463340Open ↗
04/09/2020340686323Open ↗
03/27/2020321629092Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
12/03/2020340792663Open ↗
11/13/2020340777270Open ↗
11/06/2020340782674Open ↗
Showing 3 of 6 on file for this type
▸Other Documents7
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
06/17/2024321995640Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWDHCR Document2
08/13/2026B00568413-I1Open ↗
08/13/2026B00463455-I1Open ↗
▸BISDHCR DOCUMENT1
08/25/2022321463340Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type