| Owner | Filings | Most Recent |
|---|---|---|
| CHELSEA SOUTH ASSOCIATES LLC | 26 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| GEORGE SIGALOS P.E. | 6 | 03/06/2025 |
| SANNA & LOCCISANO ARCHITECTS, P.C. | 4 | 11/23/2022 |
| ALNOV ENGINEERING, P.C. | 2 | 11/04/2022 |
| Representative | Filings | Most Recent |
|---|---|---|
| SANNA LOCCISANO ARCHITECTS P C | 24 | 03/21/2026 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 03/06/2025 | — | — | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Mitsubishi Electric PVFY-P12NAMU-E1 12,000 BTU · Vrf Indoor ×36 PURY-EP196YNU-A(-BS) 168,000 BTU · Vrf Outdoor ×2 MUZ-GS24NAHZ 24,000 BTU · Condensing Unit ×1 Ventilation Mitsubishi Electric LGH-F600RVX2-E 600 CFM · Erv ×16 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/06/2025 | — | — | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/06/2025 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/06/2025 | — | — | Steel, Concrete, Masonry |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 03/07/2025 | Final | — | progress |
| 03/07/2025 | HVAC-R and service water heating equipment | George Sigalos | energy_progress |
| 03/07/2025 | Ventilation and air distribution system | — | energy_progress |
| 03/07/2025 | Shutoff dampers | — | energy_progress |
| 03/07/2025 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 03/07/2025 | HVAC-R and service water heating system controls | — | energy_progress |
| 03/07/2025 | Interior lighting power | — | energy_progress |
| 03/07/2025 | HVAC-R and service water heating equipment | — | energy_progress |
| 03/07/2025 | Electrical motors and elevators | — | energy_progress |
| 03/07/2025 | Lighting controls | — | energy_progress |
| 03/07/2025 | Exterior lighting power | — | energy_progress |
| 03/07/2025 | Mechanical Systems | — | special |
| 03/07/2025 | Maintenance information | — | energy_progress |
| 01/09/2025 | Protection of exposed foundation insulation | — | energy_progress |
| 11/04/2022 | Structural Cold-Formed Steel | — | special |
| 11/04/2022 | Masonry | — | special |
| 11/04/2022 | Structural Steel - Details | — | special |
| 11/04/2022 | Concrete - Cast-In-Place | — | special |
| 11/04/2022 | Structural Steel - High Strength Bolting | — | special |
| 11/04/2022 | Structural Steel - Welding | — | special |
| 11/04/2022 | Final | — | progress |
| 11/02/2022 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | — | special |
| 11/02/2022 | Post-installed Anchors | — | special |
| 11/02/2022 | Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable) | — | special |
| 11/02/2022 | Fire-Resistant Penetrations and Joints | — | special |