← Back
Elevator cooperative
655 PARK AVENUE
MANHATTAN · BIN 1042467
💬 Discuss this project
1923Year Built
11Stories
D4Building Class
R10Zoning
160,890 sfGross Floor Area
54Units
LL97 CoveredRent Stabilized1 Open Violation ▸FISP: SAFE
Elevator cooperative · Owner of record: 655 PARK AVE INC · 25,104 sf lot · 6.41 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneralOther
Permit Issued — active, not yet Signed-off
Roof4p · 3 filings · 20 docs
Penthouse2p · 1 filing · 6 docs
Floor 101p · 1 filing · 18 docs
Floor 912p · 1 filing · 20 docs
Floor 86p · 5 filings · 20 docs
Floor 74p · 1 filing · 11 docs
Floor 6Under Construction14p · 1 filing · 17 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 12p · 1 filing · 18 docs
Basement3p · 1 filing · 4 docs
1 job · most recent 06/05/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/05/2025Permit IssuedENVISION DESIGN & CONST LHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Task TYC021TW-30K 29,900 BTU · Condensing Unit ×2
Ventilation
Greenheck SQ-70 100 CFM · Exhaust Fan ×2
SQ-60 50 CFM · Exhaust Fan ×1
SQ-70-VG 155 CFM · Exhaust Fan ×1
1 job · most recent 06/05/2025
Water/Sanitary
FiledStatusContractorScope
06/05/2025Permit IssuedHT PLUMBING & HEATING CORWater/Sanitary
20 jobs · most recent 02/12/2026
General Wiring Lighting HVAC Wiring
FiledStatusContractorScope
02/12/2026Permit IssuedSPICE ELECTRIC COMPANYGeneral Wiring
06/26/2025CompleteH. & L. ELECTRIC INCGeneral Wiring
10/08/2024CompleteDCE CORPORATIONGeneral Wiring
04/25/2024CompleteCONDUCTOR ELECL SVCS INC—
04/25/2024CompleteCONDUCTOR ELECL SVCS INCGeneral Wiring
07/24/2023CompleteFIU CORP DBA FIU ELECTRICGeneral Wiring
04/04/2023CompleteACCURATE ELEC'L CORP.General Wiring
01/09/2023CompleteHIGH QUALITY ELECTRIC OF—
11/08/2022CompleteACCURATE ELEC'L CONTR'S CGeneral Wiring
09/21/2022CompleteCENTURY ELECTRIC LLCGeneral Wiring
03/30/2022CompleteRESPONSE ELECTRIC INC.General Wiring
02/23/2022CompleteEINSTEIN ELEC'L CORPGeneral Wiring
09/15/2021CompleteWARREN OSTROFF ELEC., INC—
09/10/2021CompleteWARREN OSTROFF ELEC., INCGeneral Wiring, Lighting, HVAC Wiring
12/10/2020Permit IssuedROBERT CHIMENTIGeneral Wiring
1 job · most recent 06/09/2025
FiledStatusContractorScope
06/09/2025Signed-offTOWN & GARDENS LTD1 scope_items
1 job · most recent 12/02/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
12/02/2025Permit IssuedJ&S WATERPROOFING LLCSuspended Scaffold (SC)
Building Lifecycle
All (294)Filed (45)Permit Issued (49)Signed Off (27)Facade (FISP) (16)Violation (60)Inspection (20)Objection (47)Special Inspection (30)
07/13/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/07/2026
Filed — Alteration
RENOVATE OFFICE, UNIT 109 E 67th ST: REMOVE NON-LOAD BEARING PARTITIONS, DROP CEILING & FLOOR FINISHES. INSTALL NEW NON-LOAD BEARING PARTITIONS, FLOOR FINISHES, CEIL'GS, REPLACE WINDOWS/ENTRY DOOR AS PER PLANS FILED. NO CHANGE USE, EGRESS OR OCCUPANCY.
M01417055-I1
06/22/2026
Permit issued — Suspended Scaffold
M01326289-I1-SC
06/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/15/2026
Special inspection requirement — Final
06/15/2026
Special inspection requirement — Fenestration areas
06/15/2026
Special inspection requirement — Interior lighting power
06/15/2026
Special inspection requirement — Fenestration air leakage
06/15/2026
Special inspection requirement — Lighting controls
06/15/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
06/15/2026
Special inspection requirement — Energy Code Compliance Inspections
05/04/2026
Permit issued — Mechanical Systems
M01226094-S1-MS
04/29/2026
Permit issued — Plumbing
M01226094-S2-PL
04/21/2026
Permit issued — General Construction
M01226094-I1-GC
04/06/2026
Objection raised — Scope
03/25/2026
Permit issued — Suspended Scaffold
M01326289-I1-SC
03/18/2026
Filed — Alteration
Parapet reconstruction and facade masonry repairs to address leak repair as per filed plans herewith. No change in use, egress, or occupancy.
M01344442-I1
03/03/2026
Permit issued — General Construction
M08037352-I1-GC
03/03/2026
Permit issued — General Construction
M08037352-I1-ST
02/18/2026
Permit issued — Structural
M08037352-I1-ST
02/18/2026
Permit issued — Structural
M08037352-I1-GC
01/09/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
01/09/2026
Special inspection requirement — Final
Kenneth Santelli
01/09/2026
Special inspection requirement — Masonry
01/09/2026
Special inspection requirement — Tenant Protection Plan Compliance
12/16/2025
Permit issued — Suspended Scaffold
M01326289-I1-SC
12/02/2025
Filed — Alteration
INSTALLATION OF OUTRIGGER BEAM TO PERFORM FACADE REPAIRS AND FACADE INSPECTIONS
M01326289-I1
09/10/2025
Signed off — Alteration
Facade restoration as per plans filed herewith. No change in use, egress or occupancy.
M07995713-I1
08/20/2025
Signed off — Alteration
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
M00807741-I1
08/20/2025
Signed off — Alteration
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
M00807741-S1
08/19/2025
Special inspection requirement — Masonry
SEBASTIAN SETTEDUCATE JR., P.E
08/19/2025
Special inspection requirement — Tenant Protection Plan Compliance
SEBASTIAN SETTEDUCATE JR., P.E
08/19/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
SEBASTIAN SETTEDUCATE JR., P.E
08/19/2025
Special inspection requirement — Final
Kenneth Santelli
08/19/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SEBASTIAN SETTEDUCATE JR., P.E
08/07/2025
Objection resolved — Addressed
08/05/2025
Cycle 10 facade report signed — SAFE
07/29/2025
Objection resolved — Addressed
07/28/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/24/2025
Objection resolved — Addressed
07/24/2025
Objection resolved — Addressed
07/24/2025
Objection resolved — Addressed
07/22/2025
Signed off — Alteration
MODIFICATIONS OF INTERIOR MECHANICAL SYSTEMS IN EXISTING RESIDENTIAL UNIT AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
M00629118-I1
07/22/2025
Cycle 10 facade report submitted
07/21/2025
Filed — Alteration
Facade restoration as per plans filed herewith. No change in use, egress or occupancy.
M07995713-P1
07/17/2025
Special inspection requirement — Tenant Protection Plan Compliance
07/17/2025
Special inspection requirement — Final
Kenneth Santelli
07/17/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
SEBASTIAN SETTEDUCATE JR., P.E
07/17/2025
Special inspection requirement — Masonry
SEBASTIAN SETTEDUCATE JR., P.E
07/17/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SEBASTIAN SETTEDUCATE JR., P.E
07/16/2025
Signed off — Alteration
Installation of suspended scaffold during facade inspection / repair. Installation of Material Hoist.
M01000909-I1
07/16/2025
Cycle 9 facade report signed — SAFE
07/15/2025
Signed off — Alteration
M01117576-I1
06/30/2025
Objection resolved — Addressed
06/30/2025
Objection resolved — Addressed
06/24/2025
Cycle 10 facade inspection completed
06/24/2025
Cycle 9 facade inspection completed
06/23/2025
Objection raised — Scope
06/23/2025
Objection resolved — Addressed
06/23/2025
Objection raised — Scope
Latest 60 of 294 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KINGS GROUP NY1207/08/2026
834 FIFTH AVENUE2407/08/2026
J S WATERPROOFING LLC SUITE 21107/08/2026
655 PARK AVENUE8203/22/2026
655 PARK A403/22/2026
RICONDA MAINTAINENCE INC103/22/2026
INSIGINIA RESIDENTIAL GRO103/21/2026
BROWN HARRIS STEVENS MGMT LLC1103/21/2026
BROWN HARRIS STEVENS503/21/2026
BROWN HARRIS STEVENS RESIDENTIAL303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J&S WATERPROOFING LLCGeneral Contractor1007/08/2026
KINGS GROUP NY CORPGeneral Contractor607/08/2026
HITE CONSTRUCTION INCGeneral Contractor607/08/2026
CS BRIDGE CORPGeneral Contractor507/08/2026
STM INTERIORS LLCGeneral Contractor407/08/2026
TOWN & GARDENS LTDGeneral Contractor404/09/2026
FOLOR INCGeneral Contractor407/08/2026
NTS CONTRACTORS, CORPGeneral Contractor303/21/2026
HYDROKINETIC PLBG & HTG IPlumbing207/08/2026
ENVISION DESIGN & CONST LGeneral Contractor207/08/2026
LTB MECHANICAL CORPGeneral Contractor203/21/2026
THE RENOVATED HOME 1 LTDGeneral Contractor207/08/2026
DONATO PLUMBING, INCPlumbing207/08/2026
NASH ELECTRIC SERVICES INElectrical103/22/2026
JOSEPH SGROIElectrical103/21/2026
JEFFERSON NECKLESElectrical103/21/2026
GIRASAN PLBG & HTG CORPElectrical103/21/2026
ANTHONY RANIERIElectrical103/21/2026
FIU CORP DBA FIU ELECTRICElectrical103/22/2026
EINSTEIN ELEC'L CORPElectrical103/22/2026
HT PLUMBING & HEATING CORPlumbing106/27/2026
ASCHENDORF, JACKElectrical103/21/2026
ABSOLUTE PLBG & HTG CORPPlumbing107/08/2026
WARREN OSTROFF ELEC., INCElectrical103/22/2026
A & W CERTIFIED COOL SYSTGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SPECIAL TESTING & CONSULT1688207/21/2025
MURRAY ENGINEERING PC1434106/09/2025
NS ENGINEERING & CONSULTI3652306/05/2025
OEF CONSULTANTS LLC3735503/05/2025
KZ ENGINEERING, P.C.4665102/08/2024
ALAN MARGOLIN & ASSOC423101/24/2024
CHARLES G MICHEL ENGINEER2871101/24/2024
PIER, FINE ASSOCIATES1069101/24/2024
CES ENGINEERING LLC1277205/03/2022
A DEGREE OF FREEDOM STRUC925104/20/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedJ&S WATERPROOFING LLC06/22/2026
DOB NOWMechanical SystemsPermit IssuedENVISION DESIGN & CONST L05/04/2026
DOB NOWPlumbingPermit IssuedHT PLUMBING & HEATING COR04/29/2026
DOB NOWGeneral ConstructionPermit IssuedENVISION DESIGN & CONST L04/21/2026
DOB NOWSuspended ScaffoldPermit IssuedJ&S WATERPROOFING LLC03/25/2026
DOB NOWGeneral ConstructionSigned-offTOWN & GARDENS LTD03/03/2026
DOB NOWGeneral ConstructionSigned-offTOWN & GARDENS LTD03/03/2026
DOB NOWStructuralSigned-offTOWN & GARDENS LTD02/18/2026
DOB NOWStructuralSigned-offTOWN & GARDENS LTD02/18/2026
DOB NOWSuspended ScaffoldPermit IssuedJ&S WATERPROOFING LLC12/16/2025
DOB NOWSuspended ScaffoldSigned-offJ&S WATERPROOFING LLC01/30/2025
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP12/30/2024
DOB NOWProtection and Mechanical MethodsSigned-offJ&S WATERPROOFING LLC10/07/2024
DOB NOWSupported ScaffoldSigned-offKINGS GROUP NY CORP09/04/2024
DOB NOWGeneral ConstructionSigned-offHITE CONSTRUCTION08/08/2024
DOB NOWSuspended ScaffoldSigned-offB & H RESTORATION, INC07/02/2024
DOB NOWSupported ScaffoldSigned-offJ&S WATERPROOFING LLC06/17/2024
DOB NOWMechanical SystemsSigned-offHITE CONSTRUCTION06/11/2024
DOB NOWGeneral ConstructionSigned-offJ&S WATERPROOFING LLC05/31/2024
DOB NOWGeneral ConstructionSigned-offHITE CONSTRUCTION05/20/2024
DOB NOWPlumbingSigned-offHYDROKINETIC PLBG & HTG I05/10/2024
DOB NOWPlumbingSigned-offABSOLUTE PLBG & HTG CORP04/09/2024
DOB NOWSuspended ScaffoldSigned-offJ&S WATERPROOFING LLC02/13/2024
DOB NOWGeneral ConstructionSigned-offSTM INTERIORS LLC02/09/2024
DOB NOWMechanical SystemsSigned-offSTM INTERIORS LLC02/08/2024
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP01/04/2024
DOB NOWGeneral ConstructionSigned-offHITE CONSTRUCTION09/07/2023
DOB NOWGeneral ConstructionSigned-offTHE RENOVATED HOME 1 LTD06/26/2023
DOB NOWSupported ScaffoldSigned-offJ&S WATERPROOFING LLC06/23/2023
DOB NOWGeneral ConstructionSigned-offJ&S WATERPROOFING LLC06/09/2023
DOB NOWSupported ScaffoldSigned-offJ&S WATERPROOFING LLC04/06/2023
DOB NOWPlumbingSigned-offCBB PLUMBING CORP03/31/2023
DOB NOWGeneral ConstructionSigned-offTHE RENOVATED HOME 1 LTD03/27/2023
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP01/06/2023
DOB NOWGeneral ConstructionSigned-offJ&S WATERPROOFING LLC01/04/2023
DOB NOWMechanical SystemsSigned-offA & W CERTIFIED COOL SYST10/28/2022
DOB NOWGeneral ConstructionSigned-offNTS CONTRACTORS, CORP07/07/2022
DOB NOWPlumbingSigned-offHYDROKINETIC PLBG & HTG I06/29/2022
DOB NOWStructuralSigned-offFOLOR INC04/08/2022
DOB NOWMechanical SystemsSigned-offFOLOR INC04/08/2022
+ 59 more permits on file
▾Field Inspections (DOB CAP) — 20
DateTypeResultReport
07/13/2026Pass-Final General Construction Non-Directive 14PassView ↗
07/28/2025Fail-Final General Construction Non-Directive 14FailView ↗
03/10/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/28/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/10/2024Fail-Final CND-Occupancy InspectionFailView ↗
10/07/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/07/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/11/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/03/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/20/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/25/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/17/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/17/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/14/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/29/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/13/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/13/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/06/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 67
DateRequirementInspectorRole
06/15/2026Final—progress
06/15/2026Energy Code Compliance Inspections—progress
06/15/2026Fire-Resistant Penetrations and Joints—special
06/15/2026Fenestration areas—energy_progress
06/15/2026Lighting controls—energy_progress
06/15/2026Fenestration air leakage—energy_progress
06/15/2026Interior lighting power—energy_progress
06/15/2026Fenestration and door U-factor and product ratings—energy_progress
01/09/2026FinalKenneth Santelliprogress
01/09/2026Tenant Protection Plan Compliance—special
01/09/2026Structural Stability – Alterations of existing buildings—special
01/09/2026Masonry—special
08/19/2025Tenant Protection Plan ComplianceSEBASTIAN SETTEDUCATE JR., P.Especial
08/19/2025Construction Operations Influencing Adjacent StructuresSEBASTIAN SETTEDUCATE JR., P.Especial
08/19/2025MasonrySEBASTIAN SETTEDUCATE JR., P.Especial
08/19/2025Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
08/19/2025FinalKenneth Santelliprogress
07/17/2025Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
07/17/2025Construction Operations Influencing Adjacent StructuresSEBASTIAN SETTEDUCATE JR., P.Especial
07/17/2025Tenant Protection Plan Compliance—special
07/17/2025FinalKenneth Santelliprogress
07/17/2025MasonrySEBASTIAN SETTEDUCATE JR., P.Especial
05/19/2025Tenant Protection Plan ComplianceNARI MOTWANIspecial
05/19/2025Fire-Resistant Penetrations and JointsNARI MOTWANIspecial
05/15/2025Structural Steel - High Strength BoltingRobert Murrayspecial
Latest 25 of 67.
▾Documents — 1,327 on file (BIS + DOB NOW)
▸Plans & Drawings45
▸DOB NOWPlans/Sketch40
09/03/2026M00502471-I1Contact architect ↗
09/03/2026M00511939-P1Contact architect ↗
09/03/2026M00511939-I1Contact architect ↗
Showing 3 of 40 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00337342-I1Contact architect ↗
08/14/2026M00337342-P1Contact architect ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00373261-I1Contact architect ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00157843-I1Contact architect ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00157834-I1Contact architect ↗
▸Applications & Permits314
▸BISPLAN / WORK APPROVAL APPLICATION143
02/20/2026100420732Open ↗
02/20/2026100420732Open ↗
02/02/2024102619427Open ↗
Showing 3 of 143 on file for this type
▸BISWORK PERMIT APPLICATION135
10/22/2025100870942Open ↗
05/27/2021104296904Open ↗
03/24/2021123909128Open ↗
Showing 3 of 135 on file for this type
▸DOB NOWLPC Approval/Permit35
09/04/2026M00337342-I1Open ↗
09/04/2026M00373261-I1Open ↗
09/03/2026M00629118-I1Open ↗
Showing 3 of 35 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISZONING DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications261
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION139
07/21/2020123855952Open ↗
03/09/2020123855952Open ↗
07/29/2019123732531Open ↗
Showing 3 of 139 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature44
09/06/2026M00966035-I1Open ↗
09/04/2026M00337342-I1Open ↗
09/04/2026M00373261-I1Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
09/18/2026M08037352-I1Open ↗
09/10/2026M00373261-I1Open ↗
09/10/2026M00373261-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature22
09/22/2026M01344442-I1Open ↗
09/18/2026M08037352-I1Open ↗
09/10/2026M00373261-I1Open ↗
Showing 3 of 22 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Trade Schedules & Equipment91
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE31
12/31/2019123362994Open ↗
10/22/2019123302942Open ↗
09/26/2019123302942Open ↗
Showing 3 of 31 on file for this type
▸BISSCHEDULE B - PLUMBING29
04/26/2021104296904Open ↗
03/30/2020123362994Open ↗
Showing 2 of 29 on file for this type
▸BISSELF-CERT PLUMBING NOTICE25
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 25 on file for this type
▸BISEQUIPMENT USE PERMITS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection28
▸BISTenant Protection Plan and Notes18
03/09/2020123855952Open ↗
01/07/2020123362994Open ↗
08/19/2019123510058Open ↗
Showing 3 of 18 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWTenant Protection Plan3
09/04/2026M00337342-I1Open ↗
09/04/2026M00373261-I1Open ↗
08/13/2026M00337342-P1Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos78
▸DOB NOWDEP ACP-5: Asbestos Assessment Report35
09/04/2026M00337342-I1Open ↗
09/04/2026M00373261-I1Open ↗
09/03/2026M00629118-I1Open ↗
Showing 3 of 35 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)27
05/12/2020123909128Open ↗
03/09/2020123855952Open ↗
07/29/2019123510058Open ↗
Showing 3 of 27 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance45
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS21
07/21/2020123855952Open ↗
07/29/2019123510058Open ↗
Showing 2 of 21 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS9
11/05/2021123855952Open ↗
Showing 1 of 9 on file for this type
▸BISTR8: Energy Code Progress Inspections6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
11/05/2021123855952Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports29
▸BISTECHNICAL REPORT: RESPONSIBILITY28
02/20/2026100420732Open ↗
02/20/2026100420732Open ↗
06/21/2022100870942Open ↗
Showing 3 of 28 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs160
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST56
02/20/2026100420732Open ↗
06/23/2022100870942Open ↗
11/08/2021123855952Open ↗
Showing 3 of 56 on file for this type
▸BISLANDMARKS APPROVAL55
04/26/2022100870942Open ↗
07/10/2020123855952Open ↗
05/19/2020123909128Open ↗
Showing 3 of 55 on file for this type
▸BISADMINISTRATIVE OBJECTIONS16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION13
07/10/2020123855952Open ↗
05/19/2020123909128Open ↗
04/17/2019123732531Open ↗
Showing 3 of 13 on file for this type
▸BISLANDMARKS SIGNOFF8
11/08/2021123855952Open ↗
09/13/2021123909128Open ↗
06/14/2021104296904Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
12/31/2019123362994Open ↗
Showing 1 of 6 on file for this type
▸BISSUPERSEDING LETTER5
05/27/2021104296904Open ↗
05/15/2019123362994Open ↗
05/15/2019123362994Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY1
11/18/2021100853275Open ↗
▸Cost, Insurance & Ownership97
▸BISCOST AFFIDAVIT90
06/21/2022100870942Open ↗
11/05/2021123855952Open ↗
09/13/2021123909128Open ↗
Showing 3 of 90 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE4
11/09/2020123362994Open ↗
11/04/2019123362994Open ↗
Showing 2 of 4 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
10/27/2020104767799Open ↗
▸Filing & Intake Forms153
▸BISEFILING COVER SHEET57
05/08/2020123909128Open ↗
03/09/2020123855952Open ↗
07/29/2019123510058Open ↗
Showing 3 of 57 on file for this type
▸BISADDITIONAL INFORMATION50
05/07/2021104296904Open ↗
04/22/2021122119313Open ↗
03/30/2020123362994Open ↗
Showing 3 of 50 on file for this type
▸BISBOROUGH INTAKE FORM38
05/27/2021104296904Open ↗
07/21/2020123855952Open ↗
12/31/2019123362994Open ↗
Showing 3 of 38 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWAI1 Form1
08/13/2026M00815108-I1Open ↗
▸Other Documents24
▸DOB NOWProof of Historic Building7
08/14/2026M07995713-I1Open ↗
08/13/2026M00711766-I1Open ↗
08/13/2026M00992802-I1Open ↗
Showing 3 of 7 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
05/14/2019123732531Open ↗
Showing 1 of 5 on file for this type
▸DOB NOWCalculations3
08/13/2026M01000909-I1Open ↗
08/13/2026M01326289-I1Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWManufacturer's Specifications3
08/13/2026M01000909-I1Open ↗
08/13/2026M01326289-I1Open ↗
Showing 2 of 3 on file for this type
▸BISLAA - Supporting Documentation2
03/06/2020123362994Open ↗
Showing 1 of 2 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type