← Back
School or academy
Harlem Academy
655 ST NICHOLAS AVENUE · BIN 1061007
💬 Discuss this project
2021Year Built
5Stories
W3Building Class
R7AZoning
27,877 sfGross Floor Area
1Units
LL97 Covered0 Open Violations
School or academy · Owner of record: HARLEM ACADEMY · 19,858 sf lot · 1.4 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionFire Alarm
Roof14p · 5 filings · 20 docs
Bulkhead3p · 4 filings · 20 docs
Floor 56p · 3 filings · 20 docs
Floor 46p · 3 filings · 20 docs
Floor 35p · 3 filings · 20 docs
Floor 25p · 3 filings · 20 docs
Floor 110p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HARLEM ACADEMY6007/08/2026
TRI BOROUGH SCAFFOLDING507/08/2026
ST NICH 655 REALTY LLC403/22/2026
E.W. HOWELL CO, P.W LLC103/22/2026
MARCAL CONTRACTING603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
COSENTINI ASSOCIATES210/15/2025
PERKINS EASTMAN208/13/2025
M-E ENGINEERS1111/11/2021
TOHFAZ UDDIN PE PC1208/06/2021
FL&M ENGINEERING DESIGN &INSPECTION208/03/2021
THORNTON TOMASETTI207/21/2021
KZ ENGINEERING, P.C106/23/2021
SCALAR ARCHITECTURE PC205/13/2021
LANGAN ENGINEERING109/08/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SYNERGY BUILDING CONSULTANTS1303/21/2026
JAM CONSULTANTS, INC.2203/21/2026
AE DESIGN SOLUTION403/21/2026
Rigid Structural Design, LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRI BOROUGH SCAFFOLDINGGeneral Contractor1007/08/2026
COLGATE ENTERPRISE CORPGeneral Contractor907/08/2026
E.W. HOWELL CO, LLCGeneral Contractor504/09/2026
RAPTOR MECHANICAL,INCPlumbing307/08/2026
BRADFORD PERKINSElectrical203/21/2026
ACCURATE MECHANICAL INCFire Protection207/08/2026
A & M WARSHAW PLBG & HTGPlumbing207/08/2026
TOP DOG PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ATLANTIC ENGINEERINGLABOR13811610/15/2025
LANGAN ENG, ENV, SURVEYIN1265109/08/2020
Building Lifecycle
All (138)Filed (35)Permit Issued (22)Signed Off (15)Violation (19)Inspection (3)Objection (14)Special Inspection (30)
10/27/2025
Signed off — Alteration
Mechanical work for new building as shown on drawings filed herewith.
M00262746-I1
10/21/2025
Special inspection requirement — Heating Systems
Christopher O'Malley
10/21/2025
Special inspection requirement — HVAC insulation and sealing
Christopher O'Malley
10/21/2025
Special inspection requirement — Mechanical Systems
Christopher O'Malley
10/21/2025
Special inspection requirement — HVAC and service water heating system controls
Christopher O'Malley
10/21/2025
Special inspection requirement — Post-installed Anchors
Christopher O'Malley
10/21/2025
Special inspection requirement — HVAC and service water heating equipment
Christopher O'Malley
10/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher O'Malley
10/21/2025
Special inspection requirement — Chimneys and vents
Christopher O'Malley
10/21/2025
Special inspection requirement — Shutoff dampers
Christopher O'Malley
10/21/2025
Special inspection requirement — Energy Code Compliance Inspections
Christopher O'Malley
10/21/2025
Special inspection requirement — Duct leakage testing
Christopher O'Malley
10/21/2025
Special inspection requirement — Final
Christopher O'Malley
10/15/2025
Filed — Alteration
Mechanical work for new building as shown on drawings filed herewith.
M00262746-P2
08/28/2025
Special inspection requirement — Public Assembly Emergency Lighting
Christopher O'Malley
08/13/2025
Filed — No Work
M00553780-P2
07/22/2025
Special inspection requirement — Public Assembly Emergency Lighting
Christopher O'Malley
12/02/2024
Violation issued (ECB, closed)
Construction
12/01/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Signed off — Alteration
NEW PLUMBING, SPRINKLER AND STANDPIPE SYSTEM IN CONJUNCTION WITH NEW BUILDING #121206621 AS SHOWN ON DRAWINGS FILED HEREWITH.
M00348275-I1
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/21/2022
Special inspection requirement — Final
Christopher O'Malley
12/21/2022
Special inspection requirement — Energy Code Compliance Inspections
Christopher O'Malley
12/21/2022
Special inspection requirement — Post-installed Anchors
Christopher O'Malley
12/21/2022
Special inspection requirement — Heating Systems
Christopher O'Malley
12/21/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher O'Malley
12/21/2022
Special inspection requirement — Chimneys and vents
Christopher O'Malley
12/21/2022
Special inspection requirement — HVAC and service water heating equipment
Christopher O'Malley
12/21/2022
Special inspection requirement — Shutoff dampers
Christopher O'Malley
12/21/2022
Special inspection requirement — HVAC insulation and sealing
Christopher O'Malley
12/21/2022
Special inspection requirement — Duct leakage testing
Christopher O'Malley
12/21/2022
Special inspection requirement — HVAC and service water heating system controls
Christopher O'Malley
12/21/2022
Special inspection requirement — Mechanical Systems
Christopher O'Malley
04/11/2022
Signed off — Alteration
Filing for new boiler installation in conjunction with New Building #121206621.
M00262855-I1
04/11/2022
Signed off — Alteration
Filing for new boiler installation in conjunction with New Building #121206621.
M00262855-S1
02/17/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00366195-I1
02/08/2022
Signed off — Alteration
Installation of temporary system stair/system scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00453442-I1
02/08/2022
Signed off — Alteration
Installation of temporary roof protection per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00448134-I1
02/04/2022
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00447689-I1
02/04/2022
Signed off — Alteration
M00448136-I1
02/04/2022
Signed off — Alteration
Installation of temporary platform per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00544130-I1
02/04/2022
Signed off — Alteration
Installation of temporary material hoist per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00447713-I1
02/04/2022
Signed off — Alteration
Installation of temporary debris chute per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00447704-I1
01/24/2022
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS, SIDEWALK SHED LIVE LOAD WILL BE 300 PSF, SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00407264-I1
01/13/2022
Signed off — Alteration
Structural work for new building as shown on drawings filed herewith
M00265994-I1
11/16/2021
Permit issued — Plumbing
M00348275-I1-PL
11/16/2021
Special inspection requirement — Sprinkler Systems
Christopher O'Malley
11/16/2021
Special inspection requirement — Standpipe Systems
Christopher O'Malley
11/11/2021
Filed — Alteration
NEW PLUMBING, SPRINKLER AND STANDPIPE SYSTEM IN CONJUNCTION WITH NEW BUILDING #121206621 AS SHOWN ON DRAWINGS FILED HEREWITH.
M00348275-P6
11/01/2021
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/27/2021
Filed — Alteration
NEW PLUMBING, SPRINKLER AND STANDPIPE SYSTEM IN CONJUNCTION WITH NEW BUILDING #121206621 AS SHOWN ON DRAWINGS FILED HEREWITH.
M00348275-P5
10/27/2021
Permit issued — Boiler Equipment
M00262855-S1-BE
10/08/2021
Objection resolved — Addressed
10/08/2021
Special inspection requirement — Heating Systems
Christopher O'Malley
10/07/2021
Objection raised — Scope
10/04/2021
Filed — Alteration
Filing for new boiler installation in conjunction with New Building #121206621.
M00262855-S1
10/04/2021
Filed — Alteration
Filing for new boiler installation in conjunction with New Building #121206621.
M00262855-P2
10/04/2021
Special inspection requirement — Heating Systems
Christopher O'Malley
Latest 60 of 138 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offA & M WARSHAW PLBG & HTG11/16/2021
DOB NOWBoiler EquipmentSigned-offRAPTOR MECHANICAL, INC10/27/2021
DOB NOWBoiler EquipmentSigned-offRAPTOR MECHANICAL, INC08/09/2021
DOB NOWProtection and Mechanical MethodsSigned-offCOLGATE ENTERPRISE CORP06/24/2021
DOB NOWPlumbingSigned-offTOP DOG PLBG & HTG CORP06/21/2021
DOB NOWConstruction FenceSigned-offTRI BOROUGH SCAFFOLDING03/31/2021
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING03/31/2021
DOB NOWBoiler EquipmentSigned-offRAPTOR MECHANICAL, INC03/24/2021
DOB NOWMechanical SystemsSigned-offE.W. HOWELL CO, LLC02/04/2021
DOB NOWSupported ScaffoldSigned-offCOLGATE ENTERPRISE CORP01/15/2021
DOB NOWProtection and Mechanical MethodsSigned-offCOLGATE ENTERPRISE CORP01/07/2021
DOB NOWProtection and Mechanical MethodsSigned-offCOLGATE ENTERPRISE CORP01/07/2021
DOB NOWProtection and Mechanical MethodsSigned-offCOLGATE ENTERPRISE CORP01/07/2021
DOB NOWProtection and Mechanical MethodsSigned-offCOLGATE ENTERPRISE CORP01/07/2021
DOB NOWSupported ScaffoldSigned-offCOLGATE ENTERPRISE CORP01/07/2021
DOB NOWStructuralSigned-offE.W. HOWELL CO, LLC12/14/2020
DOB NOWStandpipeSigned-offACCURATE MECHANICAL INC12/04/2020
DOB NOWStandpipeSigned-offACCURATE MECHANICAL INC12/04/2020
DOB NOWStandpipeSigned-offA & M WARSHAW PLBG & HTG11/19/2020
DOB NOWStructuralSigned-offE.W. HOWELL CO, LLC10/20/2020
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING10/19/2020
DOB NOWConstruction FenceSigned-offTRI BOROUGH SCAFFOLDING07/17/2020
BIS—ISSUEDE.W. HOWELL CO, LLC12/09/2021
BIS—ISSUEDE.W. HOWELL CO, LLC09/02/2021
BIS—ISSUEDE.W. HOWELL CO, LLC12/10/2020
BISOTISSUEDE.W. HOWELL CO, LLC09/22/2020
BIS—ISSUEDE.W. HOWELL CO, LLC09/08/2020
BIS—ISSUEDE.W. HOWELL CO, LLC09/04/2020
BIS—ISSUEDE.W. HOWELL CO, LLC07/24/2020
BISEQISSUEDROCKLEDGE SCAFFOLD CORP12/12/2013
BISOTISSUEDMARCAL CONTRACTING CO LLC08/23/2013
BISEQISSUEDCITY LIMITS GROUP, INC05/21/2013
BIS—ISSUEDCITY LIMITS GROUP, INC05/21/2013
BIS—ISSUEDCITY LIMITS GROUP, INC04/23/2013
BISEQISSUEDCITY LIMITS GROUP, INC04/23/2013
BISEQISSUEDROCKLEDGE SCAFFOLD CORP01/03/2013
5 projects · most recent 04/04/2022
General Wiring Lighting
FiledStatusContractorScope
04/04/2022CompleteLMEC ELECTRIC INCGeneral Wiring
03/24/2022CompleteKNIGHT ELEC'L SERV. CORP.General Wiring
01/06/2021CompleteNASH ELECTRIC SERVICES IN—
12/10/2020CompleteLMEC ELECTRIC INCGeneral Wiring, Lighting
09/02/2020CompleteLMEC ELECTRIC INC1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/01/2021Pass-Final Boiler Equipment InspectionPassView ↗
08/11/2021Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/09/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 64
DateRequirementInspectorRole
10/21/2025Duct leakage testing Christopher O'Malleyenergy_progress
10/21/2025FinalChristopher O'Malleyprogress
10/21/2025Shutoff dampersChristopher O'Malleyenergy_progress
10/21/2025HVAC and service water heating system controls Christopher O'Malleyenergy_progress
10/21/2025HVAC and service water heating equipment Christopher O'Malleyenergy_progress
10/21/2025HVAC insulation and sealing Christopher O'Malleyenergy_progress
10/21/2025Chimneys and ventsChristopher O'Malleyspecial
10/21/2025Fire-Resistant Penetrations and JointsChristopher O'Malleyspecial
10/21/2025Heating SystemsChristopher O'Malleyspecial
10/21/2025Post-installed AnchorsChristopher O'Malleyspecial
10/21/2025Mechanical SystemsChristopher O'Malleyspecial
10/21/2025Energy Code Compliance InspectionsChristopher O'Malleyprogress
08/28/2025Public Assembly Emergency LightingChristopher O'Malleyprogress
07/22/2025Public Assembly Emergency LightingChristopher O'Malleyprogress
12/21/2022Fire-Resistant Penetrations and JointsChristopher O'Malleyspecial
12/21/2022Chimneys and ventsChristopher O'Malleyspecial
12/21/2022Heating SystemsChristopher O'Malleyspecial
12/21/2022Mechanical SystemsChristopher O'Malleyspecial
12/21/2022Post-installed AnchorsChristopher O'Malleyspecial
12/21/2022Energy Code Compliance InspectionsChristopher O'Malleyprogress
12/21/2022FinalChristopher O'Malleyprogress
12/21/2022HVAC and service water heating system controls Christopher O'Malleyenergy_progress
12/21/2022HVAC and service water heating equipment Christopher O'Malleyenergy_progress
12/21/2022Shutoff dampersChristopher O'Malleyenergy_progress
12/21/2022HVAC insulation and sealing Christopher O'Malleyenergy_progress
Latest 25 of 64.
▾Documents — 446 on file (BIS + DOB NOW)
▸Plans & Drawings45
▸DOB NOWPlans/Sketch - Supported Scaffold7
09/04/2026M00447689-P2Request digital key ↗
09/04/2026M00447689-P3Request digital key ↗
09/04/2026M00447689-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Plumbing7
09/04/2026M00391328-I1Request digital key ↗
09/03/2026M00348275-I1Request digital key ↗
09/03/2026M00348275-P6Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler6
09/03/2026M00348275-P5Request digital key ↗
09/03/2026M00348275-I1Request digital key ↗
08/15/2026M00348275-P6Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Standpipe6
09/03/2026M00348275-P6Request digital key ↗
09/03/2026M00348275-I1Request digital key ↗
09/03/2026M00348275-P5Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Protection of Mechanical Methods5
09/04/2026M00447704-I1Request digital key ↗
09/04/2026M00448134-I1Request digital key ↗
09/04/2026M00447713-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/04/2026M00262746-P1Request digital key ↗
09/04/2026M00262746-I1Request digital key ↗
08/15/2026M00262746-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment3
09/03/2026M00262855-P1Request digital key ↗
09/03/2026M00262855-I1Request digital key ↗
08/15/2026M00262855-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/04/2026M00407264-P1Request digital key ↗
09/04/2026M00407264-I1Request digital key ↗
▸DOB NOWPlans/Sketch2
09/03/2026M00544130-I1Request digital key ↗
09/03/2026M00262855-S1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
08/14/2026M00265994-P1Request digital key ↗
08/14/2026M00265994-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence2
09/04/2026M00366195-I1Request digital key ↗
08/15/2026M00366195-P1Request digital key ↗
▸Applications & Permits43
▸BISPLAN / WORK APPROVAL APPLICATION32
08/11/2025121206621Open ↗
12/03/2021121206621Open ↗
12/03/2021121206621Open ↗
Showing 3 of 32 on file for this type
▸BISWORK PERMIT APPLICATION11
12/10/2020121206621Open ↗
09/22/2020140945226Open ↗
07/24/2020121206621Open ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records6
▸BISZONING DIAGRAM2
08/26/2021121206621Open ↗
07/15/2020121206621Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
06/25/2020121206621Open ↗
▸BISVERIFY TAX LOT1
04/06/2022121206621Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
03/30/2022121206621Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
06/25/2020121206621Open ↗
▸Seals & Professional Certifications119
▸DOB NOWDPL-1: Design Professional Seal & Signature33
09/04/2026M00366195-I1Open ↗
09/04/2026M00366195-P1Open ↗
09/04/2026M00407264-P1Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature33
09/23/2026M00262855-S1Open ↗
09/23/2026M00262855-I1Open ↗
08/29/2026M00262746-I1Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWProgress Inspector Seal & Signature31
09/24/2026M00553780-P2Open ↗
09/01/2026M00448134-I1Open ↗
08/30/2026M00544130-I1Open ↗
Showing 3 of 31 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
07/22/2020121206621Open ↗
07/22/2020121206621Open ↗
02/13/2014121756581Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
11/18/2021141006266Open ↗
09/03/2020140945226Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
11/18/2021141006266Open ↗
09/03/2020140945226Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
11/18/2021141006266Open ↗
09/03/2020140945226Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
04/08/2020140893987Open ↗
▸Trade Schedules & Equipment4
▸BISGAS CUT-OFF2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
12/01/2021121206621Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
12/01/2021121206621Open ↗
▸Safety & Tenant Protection23
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE17
07/22/2020121206621Open ↗
07/22/2020121206621Open ↗
07/22/2020121206621Open ↗
Showing 3 of 17 on file for this type
▸BISSTREET TREE CHECKLIST3
08/26/2021121206621Open ↗
04/08/2020140893987Open ↗
01/13/2020121206621Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
11/23/2020121206621Open ↗
▸BISBPP: STREET TREES SITE PLAN1
07/14/2020140893987Open ↗
▸BISSTREET TREE SIGNOFF1
10/29/2025121206621Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
12/01/2021121206621Open ↗
12/01/2021121206621Open ↗
08/26/2021121206621Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026M00262855-S1Open ↗
08/13/2026M00262855-I1Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
12/01/2021121206621Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
12/01/2021121206621Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
12/01/2021121206621Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/01/2021121206621Open ↗
▸BISLIGHTING CONTROLS1
12/01/2021121206621Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/22/2020121206621Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00262746-I1Open ↗
▸Inspections & Test Reports32
▸BISTECHNICAL REPORT: RESPONSIBILITY21
12/01/2021121206621Open ↗
12/01/2021121206621Open ↗
12/01/2021121206621Open ↗
Showing 3 of 21 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
08/09/2021140945226Open ↗
09/14/2020140945226Open ↗
09/03/2020140945226Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
09/14/2020140945226Open ↗
09/03/2020140945226Open ↗
07/22/2020121206621Open ↗
▸BISMASONRY1
12/01/2021121206621Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
12/01/2021121206621Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
12/01/2021121206621Open ↗
▸BISSOIL REPORT1
06/25/2020121206621Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
12/01/2021121206621Open ↗
▸Approvals, Objections & Sign-offs62
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter31
09/04/2026M00366195-P1Open ↗
09/04/2026M00366195-I1Open ↗
09/04/2026M00448134-I1Open ↗
Showing 3 of 31 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION16
04/29/2025121206621Open ↗
11/03/2021121206621Open ↗
10/06/2021121206621Open ↗
Showing 3 of 16 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
08/11/2025121206621Open ↗
09/23/2021121206621Open ↗
08/20/2021121206621Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
08/09/2021140945226Open ↗
02/19/2014121756581Open ↗
01/08/2014121414488Open ↗
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL2
07/14/2020140893987Open ↗
06/25/2020121206621Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLANDMARKS APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT6
11/18/2021141006266Open ↗
08/06/2021140945226Open ↗
09/03/2020140945226Open ↗
Showing 3 of 6 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE4
12/10/2020121206621Open ↗
07/22/2020121206621Open ↗
Showing 2 of 4 on file for this type
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE (PGLI)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms35
▸BISADDITIONAL INFORMATION23
10/21/2025121206621Open ↗
11/03/2021121206621Open ↗
10/06/2021121206621Open ↗
Showing 3 of 23 on file for this type
▸BISEFILING COVER SHEET7
02/14/2020121206621Open ↗
02/13/2020121206621Open ↗
01/13/2020121206621Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
11/18/2021141006266Open ↗
09/03/2020140945226Open ↗
04/08/2020140893987Open ↗
▸BISBOROUGH INTAKE FORM2
07/24/2020121206621Open ↗
07/22/2020121206621Open ↗
▸Other Documents17
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION8
07/24/2020121206621Open ↗
07/22/2020121206621Open ↗
Showing 2 of 8 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
12/03/2021121206621Open ↗
08/20/2021140893987Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll2
08/13/2026M00553780-P2Open ↗
08/13/2026M00553780-I1Open ↗
▸BISVESTIBULES1
12/01/2021121206621Open ↗
▸BISFEE EXEMPTION DOCUMENTATION1
09/03/2020140945226Open ↗
▸BISMAINTENANCE INFORMATION1
12/01/2021121206621Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
12/01/2021121206621Open ↗
▸DOB NOWWaiver Document1
08/13/2026M00262746-I1Open ↗