← Back
Three families
656 HUMBOLDT STREET
BROOKLYN · BIN 3067091
💬 Discuss this project
1901Year Built
2Stories
C0Building Class
R6BZoning
2,538 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · 1,800 sf lot · 1.41 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbing
Floor 12p · 1 filing
Basement1p · 2 filings · 20 docs
1 job · most recent 01/18/2022
FiledStatusContractorScope
01/18/2022CompleteCROSS BROTHERS ELECTRIC3 meters
Building Lifecycle
All (49)Filed (7)Permit Issued (3)Signed Off (3)Violation (8)Inspection (5)Objection (8)Special Inspection (15)
09/20/2024
Signed off — Alteration
B00757328-I1
08/29/2023
Permit issued — General Construction
B00757328-I1-GC
02/06/2023
Filed — Alteration
B00757328-I1
06/02/2022
Signed off — Alteration
Install 1 Weil McLain hydronic boiler as per plans filed. Connect into existing hot-water heating system. Provide new venting for boiler and domestic-water heaters. No change in use, egress or occupancy.
B00524624-I1
05/17/2022
Signed off — Alteration
New gas piping and new gas meters to tie into new gas fixtures. Install new water heaters and circulation pumps to connect to existing domestic-water risers. New sump pump to be installed.
B00526141-I1
04/01/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAHFUZAR RAHMAN
03/31/2022
Filed — Alteration
New gas piping and new gas meters to tie into new gas fixtures. Install new water heaters and circulation pumps to connect to existing domestic-water risers. New sump pump to be installed.
B00526141-P3
03/28/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAHFUZAR RAHMAN
03/21/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/21/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/18/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/17/2022
Filed — Alteration
New gas piping and new gas meters to tie into new gas fixtures. Install new water heaters and circulation pumps to connect to existing domestic-water risers. New sump pump to be installed.
B00526141-P2
02/17/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAHFUZAR RAHMAN
02/02/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/27/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/05/2022
Filed — Alteration
Install 1 Weil McLain hydronic boiler as per plans filed. Connect into existing hot-water heating system. Provide new venting for boiler and domestic-water heaters. No change in use, egress or occupancy.
B00524624-P1
01/05/2022
Filed — Alteration
New gas piping and new gas meters to tie into new gas fixtures. Install new water heaters and circulation pumps to connect to existing domestic-water risers. New sump pump to be installed.
B00526141-P1
12/30/2021
Special inspection requirement — Heating Systems
MAHFUZAR RAHMAN
12/30/2021
Special inspection requirement — Mechanical Systems
MAHFUZAR RAHMAN
12/30/2021
Special inspection requirement — Energy Code Compliance Inspections
MAHFUZAR RAHMAN
12/30/2021
Special inspection requirement — Final
MAHFUZAR RAHMAN
12/30/2021
Special inspection requirement — HVAC-R and service water heating equipment
MAHFUZAR RAHMAN
12/30/2021
Special inspection requirement — HVAC-R and service water heating system controls
MAHFUZAR RAHMAN
12/30/2021
Special inspection requirement — Maintenance information
MAHFUZAR RAHMAN
12/30/2021
Special inspection requirement — Duct leakage testing, insulation and design
MAHFUZAR RAHMAN
12/30/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
MAHFUZAR RAHMAN
12/30/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAHFUZAR RAHMAN
12/30/2021
Special inspection requirement — Chimneys and vents
MAHFUZAR RAHMAN
12/30/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAHFUZAR RAHMAN
11/15/2021
Permit issued — Mechanical Systems
B00524624-I1-MS
09/30/2021
Permit issued — Plumbing
B00526141-I1-PL
07/07/2021
Objection resolved — Addressed
07/07/2021
Objection resolved — Addressed
07/07/2021
Objection resolved — Addressed
07/07/2021
Objection resolved — Addressed
06/28/2021
Objection raised — Admin
06/28/2021
Objection raised — Structural
06/28/2021
Objection raised — Scope
06/28/2021
Objection raised — Scope
06/23/2021
Filed — Alteration
Install 1 Weil McLain hydronic boiler as per plans filed. Connect into existing hot-water heating system. Provide new venting for boiler and domestic-water heaters. No change in use, egress or occupancy.
B00524624-I1
06/23/2021
Filed — Alteration
New gas piping and new gas meters to tie into new gas fixtures. Install new water heaters and circulation pumps to connect to existing domestic-water risers. New sump pump to be installed.
B00526141-I1
04/09/2021
Violation issued (HPD, closed)
A
10/30/2019
Violation issued (HPD, closed)
I
10/18/2018
Violation issued (HPD, closed)
I
11/24/2017
Violation issued (HPD, closed)
I
11/09/2016
Violation issued (HPD, closed)
I
10/09/2015
Violation issued (HPD, closed)
I
02/23/2015
Violation issued (HPD, closed)
I
03/27/1999
Violation issued (HPD, closed)
B
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/02/2021$2.5M—— → —$977/sf building
08/23/2016$1.6M—Private party → Private party$611/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PASTOR E MEDINA102/06/2023
VASILIOS ARTEMIOU PE603/31/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CSR EXPEDITERS603/21/2026
EFG CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JPM DECORATIONS, INCGeneral Contractor407/08/2026
G. & S. PLUMBING & HTG COPlumbing407/08/2026
G S PLUMBING HTGGeneral Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CONSTANT AND BROWN ENGINE7565102/06/2023
IP CONCRETE TESTING AND I6252102/06/2023
AK CONSULTING SERVICES, I6198603/31/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offJPM DECORATIONS, INC08/29/2023
DOB NOWMechanical SystemsSigned-offJPM DECORATIONS, INC11/15/2021
DOB NOWPlumbingSigned-offG. & S. PLUMBING & HTG CO09/30/2021
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/21/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/21/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/18/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/02/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/27/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
04/01/2022Fire-Resistant Penetrations and JointsMAHFUZAR RAHMANspecial
03/28/2022Fire-Resistant Penetrations and JointsMAHFUZAR RAHMANspecial
02/17/2022Fire-Resistant Penetrations and JointsMAHFUZAR RAHMANspecial
12/30/2021Heating SystemsMAHFUZAR RAHMANspecial
12/30/2021Mechanical SystemsMAHFUZAR RAHMANspecial
12/30/2021Energy Code Compliance InspectionsMAHFUZAR RAHMANprogress
12/30/2021FinalMAHFUZAR RAHMANprogress
12/30/2021HVAC-R and service water heating equipmentMAHFUZAR RAHMANenergy_progress
12/30/2021HVAC-R and service water heating system controlsMAHFUZAR RAHMANenergy_progress
12/30/2021Maintenance informationMAHFUZAR RAHMANenergy_progress
12/30/2021Duct leakage testing, insulation and designMAHFUZAR RAHMANenergy_progress
12/30/2021HVAC-R and service water piping design and insulationMAHFUZAR RAHMANenergy_progress
12/30/2021Fire-Resistant Penetrations and JointsMAHFUZAR RAHMANspecial
12/30/2021Chimneys and ventsMAHFUZAR RAHMANspecial
12/30/2021Fire-Resistant Penetrations and JointsMAHFUZAR RAHMANspecial
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/01/2026B00524624-P1Request digital key ↗
08/31/2026B00526141-P1Request digital key ↗
08/31/2026B00526141-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
05/11/2017321570732Open ↗
03/15/2017321507972Open ↗
▸Seals & Professional Certifications23
▸DOB NOWSpecial Inspector Seal & Signature8
09/19/2026B00526141-P1Open ↗
09/04/2026B00524624-P1Open ↗
09/04/2026B00524624-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/04/2026B00524624-P1Open ↗
09/04/2026B00524624-P1Open ↗
09/04/2026B00524624-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/01/2026B00524624-P1Open ↗
09/01/2026B00524624-I1Open ↗
08/31/2026B00526141-P2Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
05/11/2017321570732Open ↗
03/15/2017321507972Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
05/11/2017321570732Open ↗
03/15/2017321507972Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes3
05/11/2017321570732Open ↗
03/21/2017321507972Open ↗
03/15/2017321507972Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/01/2026B00524624-P1Open ↗
08/31/2026B00526141-I1Open ↗
08/31/2026B00526141-P3Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
05/11/2017321570732Open ↗
03/15/2017321507972Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
05/11/2017321570732Open ↗
03/15/2017321507972Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/15/2026B00524624-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
05/11/2017321570732Open ↗
03/15/2017321507972Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
05/11/2017321570732Open ↗
03/15/2017321507972Open ↗