← Back
Walk-up apt, over six families with stores
657 10 AVENUE
MANHATTAN · BIN 1026967
💬 Discuss this project
1901Year Built
6Stories
C7Building Class
R8Zoning
12,330 sfGross Floor Area
21Units
Rent Stabilized25 Open Violations ▸
Walk-up apt, over six families with stores · Owner of record: 657-10 LLC · 2,510 sf lot · 4.91 FAR built · Flood zone X
Locations of Work
StructuralPlumbing
Permit Issued — active, not yet Signed-off
Roof8p · 2 filings · 20 docs
Floor 6Under Construction1p · 1 filing · 12 docs
Floor 5Under Construction1p · 1 filing · 12 docs
Floor 4Under Construction1p · 1 filing · 12 docs
Floor 3Under Construction1p · 1 filing · 12 docs
Floor 2Under Construction1p · 1 filing · 12 docs
Floor 1
CellarUnder Construction1p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BEACH LANE MANAGEMENT1908/29/2026
657-10 LLC503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALSIEUX ARCHITECTURE, LLC.204/07/2026
JAMES H. FAHEY407/29/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSTRUCTION PERMIT SERVICES603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RC3 ELECTRIC, LLCGeneral Contractor204/09/2026
ANTHONY COSTANZOElectrical103/21/2026
JOHN LEEElectrical103/21/2026
OM ELECTRIC, INCElectrical103/22/2026
TELCOM ENGINEERING GP INCGeneral Contractor107/08/2026
C JAMES PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STRUCTURAL CONSULTING SER1919207/29/2025
Building Lifecycle
All (99)Filed (6)Permit Issued (4)Signed Off (3)Violation (60)Inspection (3)Objection (20)Special Inspection (3)
06/18/2026
Signed off — Alteration
Offset existing vent pipe on the roof as per plans. No change in use, egress, or occupancy.
M01194758-S1
06/18/2026
Signed off — Alteration
Offset existing vent pipe on the roof as per plans. No change in use, egress, or occupancy.
M01194758-I1
04/23/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
04/07/2026
Filed — Alteration
RELOCATION OF EXISTING GAS METERS FROM DWELLING UNITS TO CELLAR- NO CHANGE IN USE/OCCUPANCY, EGRESS, ROOM COUNT/DWELLING UNITS
M01323576-P1
02/17/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
01/29/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/26/2026
Violation issued (HPD, open)
B
01/26/2026
Violation issued (HPD, open)
C
01/26/2026
Violation issued (HPD, open)
B
01/26/2026
Violation issued (HPD, closed)
A
01/06/2026
Permit issued — Mechanical Systems
M01194758-S1-MS
01/06/2026
Permit issued — Antenna
M01194758-I1-AN
12/03/2025
Permit issued — Plumbing
M01323576-I1-PL
11/26/2025
Filed — Alteration
RELOCATION OF EXISTING GAS METERS FROM DWELLING UNITS TO CELLAR- NO CHANGE IN USE/OCCUPANCY, EGRESS, ROOM COUNT/DWELLING UNITS
M01323576-I1
07/29/2025
Filed — Alteration
Offset existing vent pipe on the roof as per plans. No change in use, egress, or occupancy.
M01194758-S1
07/22/2025
Filed — Alteration
Offset existing vent pipe on the roof as per plans. No change in use, egress, or occupancy.
M01194758-I1
03/13/2025
Special inspection requirement — Tenant Protection Plan Compliance
James Fahey
03/13/2025
Special inspection requirement — Mechanical Systems
James Fahey
03/13/2025
Special inspection requirement — Final
James Fahey
05/23/2024
Violation issued (HPD, open)
C
05/23/2024
Violation issued (HPD, open)
B
05/23/2024
Violation issued (HPD, open)
B
05/23/2024
Violation issued (HPD, open)
B
05/23/2024
Violation issued (HPD, open)
B
05/23/2024
Violation issued (HPD, open)
B
05/23/2024
Violation issued (HPD, open)
C
05/23/2024
Violation issued (HPD, open)
B
05/23/2024
Violation issued (HPD, open)
C
05/23/2024
Violation issued (HPD, open)
B
05/23/2024
Violation issued (HPD, open)
B
04/01/2024
Violation issued (HPD, closed)
A
11/15/2023
Violation issued (HPD, closed)
I
12/12/2022
Signed off — Alteration
Filing revised plans to demonstrate as-built conditions for Verizon modification in order to obtain sign off. Install 3 new antennas on roof.
M00225097-I1
12/08/2022
Filed — Alteration
Filing revised plans to demonstrate as-built conditions for Verizon modification in order to obtain sign off. Install 3 new antennas on roof.
M00225097-P1
08/25/2021
Violation issued (HPD, closed)
A
08/25/2021
Violation issued (HPD, closed)
A
08/25/2021
Violation issued (HPD, closed)
A
08/25/2021
Violation issued (HPD, closed)
A
08/25/2021
Violation issued (HPD, closed)
C
08/25/2021
Violation issued (HPD, closed)
A
08/25/2021
Violation issued (HPD, closed)
C
08/25/2021
Violation issued (HPD, closed)
A
06/16/2021
Violation issued (HPD, closed)
A
06/16/2021
Violation issued (HPD, closed)
C
06/16/2021
Violation issued (HPD, closed)
A
06/16/2021
Violation issued (HPD, closed)
A
06/16/2021
Violation issued (HPD, closed)
A
04/01/2021
Violation issued (HPD, closed)
I
04/01/2021
Violation issued (HPD, closed)
A
04/23/2020
Permit issued — Antenna
M00225097-I1-AN
04/23/2020
Objection resolved — Addressed
04/23/2020
Objection resolved — Addressed
04/23/2020
Objection resolved — Addressed
04/23/2020
Objection resolved — Addressed
04/23/2020
Objection resolved — Addressed
03/02/2020
Filed — Alteration
Filing revised plans to demonstrate as-built conditions for Verizon modification in order to obtain sign off. Install 3 new antennas on roof.
M00225097-I1
03/02/2020
Objection raised — Other
03/02/2020
Objection resolved — Addressed
03/02/2020
Objection raised — 1998-AN AC 28-103.14.1-Adminis
03/02/2020
Objection resolved — Addressed
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offRC3 ELECTRIC, LLC01/06/2026
DOB NOWAntennaSigned-offRC3 ELECTRIC, LLC01/06/2026
DOB NOWPlumbingPermit IssuedC JAMES PLBG & HTG INC12/03/2025
DOB NOWAntennaSigned-offLINED UP CONSTRUCTION04/23/2020
BISPLISSUEDHAY MECHANICAL SOLUTIONS06/06/2019
BISOTISSUEDBEACH LANE MANAGEMENT INC.04/25/2019
BISOTISSUEDACME AWNING CO. INC03/18/2019
BISOTISSUEDTELCOM ENGINEERING GP INC12/10/2014
BISBLISSUEDAGGRESSIVE HEATING INC03/28/2013
BISOTISSUEDDYNATEC CONTRACTING INC03/18/2013
BISOTISSUEDLPG ASSOCIATES A NJ CORP.01/07/1993
BISPLISSUEDT.M.J. PLUMBING & HEATING12/09/1991
BISOTISSUEDE Z CONSTRUCTION CORP08/14/1990
1 project · most recent 07/29/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/29/2025Signed-offRC3 ELECTRIC, LLCVentilation Systems
Ventilation
N/A n/a 1 BTU ×1
1 project · most recent 04/07/2026
Gas
FiledStatusContractorScope
04/07/2026Permit IssuedC JAMES PLBG & HTG INCGas
2 projects · most recent 10/31/2019
General Wiring
FiledStatusContractorScope
10/31/2019CompleteJ.A. LEE ELEC SVCS LLCGeneral Wiring
08/29/2019Permit IssuedOM ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/23/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/17/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/29/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
03/13/2025Tenant Protection Plan ComplianceJames Faheyspecial
03/13/2025Mechanical SystemsJames Faheyspecial
03/13/2025FinalJames Faheyprogress
▾Documents — 109 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch5
08/22/2026M01194758-I1Request digital key ↗
08/22/2026M01194758-S1Request digital key ↗
08/20/2026M01323576-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Antenna2
09/05/2026M00225097-P1Request digital key ↗
09/05/2026M00225097-I1Request digital key ↗
▸Applications & Permits13
▸BISWORK PERMIT APPLICATION7
06/07/2019140834863Open ↗
03/19/2019123825771Open ↗
02/28/2019140834863Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
03/05/2019123825771Open ↗
02/28/2019140834863Open ↗
10/29/2014122165977Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications26
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
09/27/2019140834863Open ↗
04/08/2019123825771Open ↗
03/05/2019123825771Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/20/2026M01323576-P2Open ↗
08/20/2026M01323576-P1Open ↗
08/13/2026M00225097-P1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
03/05/2019123825771Open ↗
02/28/2019140834863Open ↗
03/26/2013140061260Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
03/05/2019123825771Open ↗
03/11/2013121511453Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
02/28/2019140834863Open ↗
03/26/2013140061260Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
02/28/2019140834863Open ↗
03/26/2013140061260Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
03/11/2013121511453Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026M01194758-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/23/2026M01194758-S1Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
03/26/2013140061260Open ↗
▸BISSCHEDULE B - PLUMBING1
02/28/2019140834863Open ↗
▸Safety & Tenant Protection14
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist7
08/20/2026M01323576-P1Open ↗
08/20/2026M01323576-P2Open ↗
08/13/2026M01323576-I1Open ↗
Showing 3 of 7 on file for this type
▸BISANTI-HARASSMENT CHECKLIST: CLINTON2
03/05/2019123825771Open ↗
03/15/2013121511453Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES2
02/28/2019140834863Open ↗
03/11/2019123825771Open ↗
▸DOB NOWTenant Protection Plan2
08/13/2026M00225097-I1Open ↗
08/13/2026M00225097-P1Open ↗
▸BISCLINTON DISTRICT: ANTI-HARASSMENT CHECKLIST1
02/28/2019140834863Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/20/2026M01323576-P2Open ↗
08/20/2026M01323576-P1Open ↗
08/13/2026M01194758-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
03/05/2019123825771Open ↗
02/28/2019140834863Open ↗
03/26/2013140061260Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
09/27/2019140834863Open ↗
05/11/2017140061260Open ↗
05/15/2015122165977Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
09/27/2019140834863Open ↗
05/11/2017140061260Open ↗
05/15/2015122165977Open ↗
▸BISTR8: Energy Code Progress Inspections2
10/29/2014122165977Open ↗
03/08/2013121511453Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
02/28/2019140834863Open ↗
03/26/2013140061260Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
02/28/2019140834863Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
02/28/2019140834863Open ↗
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
09/27/2019140834863Open ↗
04/08/2019123825771Open ↗
05/11/2017140061260Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/26/2013140061260Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/08/2013121511453Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT8
09/27/2019140834863Open ↗
04/08/2019123825771Open ↗
03/05/2019123825771Open ↗
Showing 3 of 8 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
02/28/2019140834863Open ↗
▸BISCIVIL PENALTY AFFADAVIT/REQUEST1
04/25/2019140834863Open ↗
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET3
03/05/2019123825771Open ↗
10/29/2014122165977Open ↗
03/08/2013121511453Open ↗
▸BISBOROUGH INTAKE FORM2
09/27/2019140834863Open ↗
04/08/2019123825771Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
02/28/2019140834863Open ↗
03/26/2013140061260Open ↗
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
05/11/2017140061260Open ↗