Predominantly retail with other uses
658 FOREST AVENUE
STATEN ISLAND · West New Brighton-Silver Lake-Grymes Hill · BIN 5142673
💬 Discuss this project
1931Year Built
2Stories
K4Building Class
R3XZoning
7,280 sfGross Floor Area
8Units
1 Open Violation ▸FDNY Report ↗
Predominantly retail with other uses · 3,758 sf lot · 1.94 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbing
Floor 16p · 1 filing · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BASIC GROUPS CORP903/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIC 88 CORP209/12/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUBE BUILDERS GROUP NYGeneral Contractor303/21/2026
PIPESTYLISTS, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIC 88 CORP8371209/12/2023
Building Lifecycle
All (26)Filed (2)Permit Issued (2)Violation (3)Inspection (2)Special Inspection (17)
02/05/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/25/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/14/2023
Permit issued — Plumbing
S00928464-S1-PL
09/12/2023
Filed — Alteration
INSTALL NEW WASHER, HAND SINK AND F.D IN 1ST FLOOR OF THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
S00928464-S1
09/12/2023
Special inspection requirement — Tenant Protection Plan Compliance
Eric Sun
09/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
09/08/2023
Permit issued — General Construction
S00928464-I1-GC-CX
09/05/2023
Filed — Alteration
INSTALL NEW WASHER, HAND SINK AND F.D IN 1ST FLOOR OF THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
S00928464-I1
09/05/2023
Special inspection requirement — Tenant Protection Plan Compliance
Eric Sun
09/01/2023
Special inspection requirement — Mechanical Systems
Eric Sun
09/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
09/01/2023
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
09/01/2023
Special inspection requirement — Fire-Resistance Rated Construction
Eric Sun
09/01/2023
Special inspection requirement — Final
Eric Sun
09/01/2023
Special inspection requirement — Air barrier - visual inspection
Eric Sun
09/01/2023
Special inspection requirement — Duct leakage testing, insulation and design
Eric Sun
09/01/2023
Special inspection requirement — HVAC-R and service water heating system controls
Eric Sun
09/01/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Sun
09/01/2023
Special inspection requirement — HVAC-R and service water heating equipment
Eric Sun
09/01/2023
Special inspection requirement — Insulation placement and R values
Eric Sun
09/01/2023
Special inspection requirement — Interior lighting power
Eric Sun
09/01/2023
Special inspection requirement — Permanent certificate
Eric Sun
09/01/2023
Special inspection requirement — Maintenance information
Eric Sun
04/15/2013
Violation issued (ECB, closed)
Unknown
04/12/2013
Violation issued (ECB, closed)
Construction
06/29/1987
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedT & T PLUMBING INC09/14/2023
DOB NOWGeneral ConstructionPermit IssuedCUBE BUILDERS GROUP NY09/08/2023
1 project · most recent 09/12/2023
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/12/2023Permit IssuedCUBE BUILDERS GROUP NYAir Conditioning Systems
Cooling
Mitsubishi Electric MUZ-GL18NA-U1 18,000 BTU · Heat Pump Outdoor ×1
1 project · most recent 09/12/2023
Water/Sanitary
FiledStatusContractorScope
09/12/2023Permit IssuedT&T PLUMBING INCWater/Sanitary
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
02/05/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/25/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
09/12/2023Tenant Protection Plan ComplianceEric Sunspecial
09/12/2023Fire-Resistant Penetrations and JointsEric Sunspecial
09/05/2023Tenant Protection Plan ComplianceEric Sunspecial
09/01/2023Mechanical SystemsEric Sunspecial
09/01/2023Fire-Resistant Penetrations and JointsEric Sunspecial
09/01/2023Energy Code Compliance InspectionsEric Sunprogress
09/01/2023Fire-Resistance Rated ConstructionEric Sunprogress
09/01/2023FinalEric Sunprogress
09/01/2023Air barrier - visual inspectionEric Sunenergy_progress
09/01/2023Duct leakage testing, insulation and designEric Sunenergy_progress
09/01/2023HVAC-R and service water heating system controlsEric Sunenergy_progress
09/01/2023HVAC-R and service water piping design and insulationEric Sunenergy_progress
09/01/2023HVAC-R and service water heating equipmentEric Sunenergy_progress
09/01/2023Insulation placement and R valuesEric Sunenergy_progress
09/01/2023Interior lighting powerEric Sunenergy_progress
09/01/2023Permanent certificateEric Sunenergy_progress
09/01/2023Maintenance informationEric Sunenergy_progress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/22/2026S00928464-S1Request digital key ↗
08/22/2026S00928464-I1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWSpecial Inspector Seal & Signature3
08/27/2026S00928464-S1Open ↗
08/24/2026S00928464-I1Open ↗
08/24/2026S00928464-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/22/2026S00928464-S1Open ↗
08/22/2026S00928464-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026S00928464-I1Open ↗
08/24/2026S00928464-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/22/2026S00928464-S1Open ↗
08/22/2026S00928464-I1Open ↗