← Back
Two family brick
658 HENDRIX STREET
BROOKLYN · BIN 3090685
💬 Discuss this project
1899Year Built
2Stories
B1Building Class
R5Zoning
1,680 sfGross Floor Area
2Units
Rent Stabilized27 Open Violations ▸FDNY Report ↗
Two family brick · 1,000 sf lot · 1.68 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof1p · 1 filing · 9 docs
Floor 22p · 1 filing · 9 docs
Floor 12p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHARLES DIEHL ARCHITECT LLC208/26/2021
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASR ENGINEERING PC8404208/26/2021
Building Lifecycle
All (39)Filed (2)Violation (29)Special Inspection (8)
11/24/2025
Violation issued (HPD, open)
I
12/03/2024
Violation issued (HPD, open)
I
11/28/2023
Violation issued (HPD, open)
I
11/17/2022
Violation issued (HPD, open)
I
03/16/2022
Violation issued (HPD, open)
I
08/26/2021
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF AN EXISTING 2-STORY OVER CELLAR BRICK BUILDING. WORK INCLUDES INSTALLATION OF NEW AND REPLACEMENT OR RELOCATION OF EXISTING FIXTURES, FINISHES, CASEWORK, PARTITIONS, DOORS AND WINDOWS. WORK IS ON 1ST AND 2ND FLOORS ONLY.
B00564798-S2
08/24/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
AKM RAHMAN
08/24/2021
Special inspection requirement — Maintenance information
AKM RAHMAN
08/23/2021
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF AN EXISTING 2-STORY OVER CELLAR BRICK BUILDING. WORK INCLUDES INSTALLATION OF NEW AND REPLACEMENT OR RELOCATION OF EXISTING FIXTURES, FINISHES, CASEWORK, PARTITIONS, DOORS AND WINDOWS. WORK IS ON 1ST AND 2ND FLOORS ONLY.
B00564798-I1
07/27/2021
Special inspection requirement — Shutoff dampers
07/27/2021
Special inspection requirement — HVAC-R and service water heating equipment
07/27/2021
Special inspection requirement — HVAC-R and service water heating system controls
07/27/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
07/26/2021
Special inspection requirement — Mechanical Systems
AKM RAHMAN
07/26/2021
Special inspection requirement — Final
AKM RAHMAN
04/21/2021
Violation issued (HPD, open)
I
11/07/2019
Violation issued (HPD, open)
I
01/08/2018
Violation issued (HPD, open)
I
09/27/2015
Violation issued (HPD, closed)
C
09/27/2015
Violation issued (HPD, closed)
C
09/27/2015
Violation issued (HPD, open)
B
09/27/2015
Violation issued (HPD, open)
B
09/27/2015
Violation issued (HPD, open)
B
09/27/2015
Violation issued (HPD, open)
B
09/27/2015
Violation issued (HPD, open)
B
08/17/2010
Violation issued (HPD, open)
B
08/17/2010
Violation issued (HPD, open)
B
08/17/2010
Violation issued (HPD, open)
B
08/17/2010
Violation issued (HPD, open)
B
08/17/2010
Violation issued (HPD, open)
B
08/17/2010
Violation issued (HPD, open)
B
08/17/2010
Violation issued (HPD, open)
B
08/17/2010
Violation issued (HPD, open)
B
08/17/2010
Violation issued (HPD, open)
B
08/17/2010
Violation issued (HPD, open)
B
10/28/2004
Violation issued (HPD, open)
A
10/28/2004
Violation issued (HPD, open)
B
10/28/2004
Violation issued (HPD, open)
B
01/02/2003
Violation issued (HPD, open)
C
Nothing on file for this building.
1 project · most recent 08/26/2021
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/26/2021——Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric MXZ-8C48NAHZ2-U1 48,000 BTU · Condensing Unit ×1
Heating
Mitsubishi Electric MXZ-4C36NAHZ2-U1 36,000 BTU · Heat Pump Outdoor ×1
Ventilation
Panasonic FV-15VQ4 150 BTU · Exhaust Fan ×4
FV-08VQ3 80 CFM · Exhaust Fan ×3
1 project · most recent 08/26/2021
Water/Sanitary
FiledStatusContractorScope
08/26/2021——Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
08/24/2021Fire-Resistant Penetrations and JointsAKM RAHMANspecial
08/24/2021Maintenance informationAKM RAHMANenergy_progress
07/27/2021Shutoff dampers—energy_progress
07/27/2021HVAC-R and service water heating equipment—energy_progress
07/27/2021HVAC-R and service water heating system controls—energy_progress
07/27/2021HVAC-R and service water piping design and insulation—energy_progress
07/26/2021Mechanical SystemsAKM RAHMANspecial
07/26/2021FinalAKM RAHMANprogress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
09/01/2026B00564798-S2Request digital key ↗
09/01/2026B00564798-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/01/2026B00564798-S2Open ↗
09/01/2026B00564798-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026B00564798-S2Open ↗
08/22/2026B00564798-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/24/2026B00564798-S2Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/01/2026B00564798-S2Open ↗
09/01/2026B00564798-I1Open ↗