← Back
BuildNYC
Two family brick
658 LESTER STREET
BRONX · BIN 2054742
💬 Discuss this project
1930Year Built
2Stories
B1Building Class
R5Zoning
2,399 sfGross Floor Area
2Units
36 Active Violations 35 unresolved · 1 paperwork only ▸
Two family brick · 5,164 sf lot · 0.46 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing · 3 docs
Attic8p · 2 filings · 15 docs
Floor 215p · 3 filings · 20 docs
Floor 1Curb Cut18p · 6 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/07/2019$439K—U.S ROFF III LEGAL TITLE TRUST 2015-1 → Private party$183/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Colombo Architectural Studio711/03/2026
Jose A. Santos P.E.P.C.109/20/2024
Constscape403/07/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Gabriel Santos703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Doval Plumbing & Heatingspecialty_contractor407/08/2026
Symmetrical ConstructionScaffold107/08/2026
David JablonPlumbing107/08/2026
Symmetrical ConstructionGeneral Contractor207/16/2024
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616204/08/2026
Jose A Santos PE3292304/08/2026
Building Lifecycle
11/03/2026
Signed off — Alteration
INSTALLATION OF NEW AUTOMATIC SPRINKLER SYSTEM.
X00361446-S1
11/03/2026
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES ON 1st AND 2nd FLOOR
X00290361-P3
07/02/2026
Permit expired, never signed off — Plumbing
The city's record still shows this permit as issued, with no sign-off on its filing
X00290361-I1-PL
04/22/2026
Objection raised — Scope
04/08/2026
Filed — Alteration
INSTALLATION OF NEW AUTOMATIC SPRINKLER SYSTEM.
X00361446-P1
89 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offDoval Plumbing & Heating07/02/2025
DOB NOWPlumbingPermit IssuedDoval Plumbing & Heating07/02/2025
DOB NOWConstruction FenceSigned-offSymmetrical Construction07/15/2024
DOB NOWSprinklersSigned-offDoval Plumbing & Heating01/16/2024
DOB NOWPlumbingPermit IssuedDoval Plumbing & Heating01/10/2024
DOB NOWPlumbingPermit IssuedDavid Jablon10/07/2020
BIS—ISSUEDSymmetrical Construction07/16/2024
BIS—ISSUEDSymmetrical Construction07/16/2024
1 project · most recent 02/17/2020
Air Conditioning Systems Associated Ducts and Piping Heating Systems
FiledStatusContractorScope
02/17/2020——Air Conditioning Systems, Associated Ducts and Piping, Heating Systems
1 project · most recent 04/08/2026
FiledStatusContractorScope
04/08/2026Signed-offDoval Plumbing & Heating—
1 project · most recent 11/03/2026
Gas Water/Sanitary
FiledStatusContractorScope
11/03/2026Permit IssuedA&G General ContractorGas, Water/Sanitary
2 projects · most recent 03/10/2026
General Wiring
FiledStatusContractorScope
03/10/2026Permit IssuedTriple H ElectricalGeneral Wiring
01/29/2024Permit IssuedGilston Brothers Elect'lGeneral Wiring
1 project · most recent 05/27/2022
Steel Concrete
FiledStatusContractorScope
05/27/2022——Steel, Concrete
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/18/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/18/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
07/08/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
04/08/2026Fire-Resistant Penetrations and JointsJose Santosspecial
04/08/2026Sprinkler SystemsFAHAD FATEHspecial
08/30/2024Fire-Resistant Penetrations and JointsJose Santosspecial
05/14/2022Structural Stability – Alterations of existing buildings—special
04/18/2022Structural Steel - Details—special
04/18/2022Final—progress
03/29/2022Final—progress
03/29/2022Footing and Foundation—progress
09/26/2020Fire-Resistant Penetrations and JointsJose Santosspecial
06/22/2020Sprinkler SystemsFAHAD FATEHspecial
02/17/2020HVAC and service water heating equipment —energy_progress
01/12/2020Final—progress
01/12/2020Mechanical Systems—special
113 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account