← Back
Walk-up apt, over six families with stores
659 10 AVENUE
MANHATTAN · BIN 1026968
💬 Discuss this project
1910Year Built
4Stories
C7Building Class
R8Zoning
6,850 sfGross Floor Area
13Units
Rent Stabilized0 Open Violations
Walk-up apt, over six families with stores · Owner of record: ADAR 262626 INC. · 2,510 sf lot · 2.73 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Floor 41p · 1 filing · 20 docs
Floor 3
Floor 21p · 1 filing · 20 docs
Floor 12p · 1 filing · 13 docs
Mezzanine1p · 1 filing · 20 docs
Cellar2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ATOMIC CONTRACTING1807/08/2026
GSR CONTRACTOR INC.703/22/2026
ADAR 262626 INC.103/22/2026
A-1 RECORD SALES INC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/07/2022$4.2M—CHINA NATIONAL AVIATION HOLDING CORP. LIMITED → KP DEVELOPERS INC.$613/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SION CONSULTING ENGINEERING PC605/02/2023
ASR ENGINEERING PC108/19/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SION CONSULTING ENGINEERING1203/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ATOMIC CONTRACTING INCGeneral Contractor603/21/2026
GSR CONTRACTOR INCGeneral Contractor603/21/2026
RENEW PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SION CONSULTING ENG. PC1108605/02/2023
Building Lifecycle
All (66)Filed (7)Permit Issued (5)Signed Off (4)Violation (20)Inspection (5)Special Inspection (25)
06/04/2025
Violation issued (HPD, closed)
A
04/01/2024
Violation issued (HPD, closed)
A
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/30/2023
Signed off — Alteration
THIS APPLICATION IS FILED TO ADD PARTITION FOR A NEW TOILET, INSTALL VENTILATION FOR NEW TOILET ROOM AT FIRST FLOOR
M00866460-I1
05/22/2023
Signed off — Alteration
THIS APPLICATION IS FILED TO ADD PARTITION FOR A NEW TOILET, INSTALL VENTILATION FOR NEW TOILET ROOM AT FIRST FLOOR
M00866460-S1
05/22/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/17/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/10/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/05/2023
Permit issued — Plumbing
M00866460-S1-PL
05/03/2023
Permit issued — General Construction
M00866460-I1-GC-CX
05/02/2023
Filed — Alteration
THIS APPLICATION IS FILED TO ADD PARTITION FOR A NEW TOILET, INSTALL VENTILATION FOR NEW TOILET ROOM AT FIRST FLOOR
M00866460-I1
05/02/2023
Filed — Alteration
THIS APPLICATION IS FILED TO ADD PARTITION FOR A NEW TOILET, INSTALL VENTILATION FOR NEW TOILET ROOM AT FIRST FLOOR
M00866460-S1
04/27/2023
Special inspection requirement — Mechanical Systems
sion hourizadeh
04/27/2023
Special inspection requirement — Energy Code Compliance Inspections
sion hourizadeh
04/27/2023
Special inspection requirement — Final
sion hourizadeh
04/27/2023
Special inspection requirement — Ventilation and air distribution system
sion hourizadeh
03/15/2023
Violation issued (HPD, closed)
A
12/12/2022
Signed off — Alteration
General Construction to repoint parapet wall & Mechanical Work related to HVAC split units installed and change swing of doors
M00777513-I1
12/12/2022
Inspection — Pass-Final General Construction Directive 14
Pass
View inspection ↗
11/22/2022
Signed off — Alteration
PROPOSED INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00795453-I1
11/22/2022
Filed — Alteration
General Construction to repoint parapet wall & Mechanical Work related to HVAC split units installed and change swing of doors
M00777513-P5
11/22/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
sion hourizadeh
11/22/2022
Special inspection requirement — Mechanical Systems
sion hourizadeh
11/22/2022
Special inspection requirement — Final
sion hourizadeh
11/22/2022
Special inspection requirement — Maintenance information
sion hourizadeh
11/22/2022
Special inspection requirement — HVAC-R and service water heating equipment
sion hourizadeh
11/22/2022
Special inspection requirement — HVAC-R and service water heating system controls
sion hourizadeh
11/22/2022
Special inspection requirement — Permanent certificate
sion hourizadeh
11/21/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/03/2022
Violation issued (HPD, closed)
I
10/07/2022
Filed — Alteration
General Construction to repoint parapet wall & Mechanical Work related to HVAC split units installed and change swing of doors
M00777513-P2
10/04/2022
Special inspection requirement — Permanent certificate
sion hourizadeh
10/04/2022
Special inspection requirement — Mechanical Systems
sion hourizadeh
10/04/2022
Special inspection requirement — Final
sion hourizadeh
10/04/2022
Special inspection requirement — Maintenance information
sion hourizadeh
10/04/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
sion hourizadeh
10/04/2022
Special inspection requirement — HVAC-R and service water heating equipment
sion hourizadeh
10/04/2022
Special inspection requirement — HVAC-R and service water heating system controls
sion hourizadeh
08/22/2022
Permit issued — Supported Scaffold
M00795453-I1-SH
08/22/2022
Permit issued — Supported Scaffold
M00795453-I1-SF
08/19/2022
Filed — Alteration
PROPOSED INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00795453-I1
08/02/2022
Filed — Alteration
General Construction to repoint parapet wall & Mechanical Work related to HVAC split units installed and change swing of doors
M00777513-P1
08/02/2022
Permit issued — Mechanical Systems
M00777513-I1-GC-CX
08/02/2022
Special inspection requirement — Mechanical Systems
sion hourizadeh
08/02/2022
Special inspection requirement — Permanent certificate
sion hourizadeh
08/02/2022
Special inspection requirement — HVAC-R and service water heating equipment
sion hourizadeh
08/02/2022
Special inspection requirement — HVAC-R and service water heating system controls
sion hourizadeh
08/02/2022
Special inspection requirement — Maintenance information
sion hourizadeh
08/02/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
sion hourizadeh
08/02/2022
Special inspection requirement — Final
sion hourizadeh
07/27/2022
Filed — Alteration
General Construction to repoint parapet wall & Mechanical Work related to HVAC split units installed and change swing of doors
M00777513-I1
05/12/2022
Violation issued (ECB, closed)
Construction
04/01/2021
Violation issued (HPD, closed)
A
10/24/2016
Violation issued (HPD, closed)
I
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 66 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offRENEW PLUMBING CORP05/05/2023
DOB NOWGeneral ConstructionSigned-offATOMIC CONTRACTING INC05/03/2023
DOB NOWSupported ScaffoldSigned-offGSR CONTRACTOR INC08/22/2022
DOB NOWSupported ScaffoldSigned-offGSR CONTRACTOR INC08/22/2022
DOB NOWMechanical SystemsSigned-offATOMIC CONTRACTING INC08/02/2022
BIS—ISSUEDATOMIC CONTRACTING INC06/27/2022
BISPLISSUEDS & L PLUMBING INC07/07/2005
BIS—ISSUEDSKC CONSTRUCTION06/06/2005
3 projects · most recent 05/11/2023
General Wiring
FiledStatusContractorScope
05/11/2023CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
10/27/2022CompleteRICHARD NEU—
08/11/2022CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/22/2023Pass-Final General Construction Non-Directive 14PassView ↗
05/17/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/10/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/12/2022Pass-Final General Construction Directive 14PassView ↗
11/21/2022Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
04/27/2023Mechanical Systemssion hourizadehspecial
04/27/2023Energy Code Compliance Inspectionssion hourizadehprogress
04/27/2023Finalsion hourizadehprogress
04/27/2023Ventilation and air distribution systemsion hourizadehenergy_progress
11/22/2022HVAC-R and service water piping design and insulationsion hourizadehenergy_progress
11/22/2022Mechanical Systemssion hourizadehspecial
11/22/2022Finalsion hourizadehprogress
11/22/2022Maintenance informationsion hourizadehenergy_progress
11/22/2022HVAC-R and service water heating equipmentsion hourizadehenergy_progress
11/22/2022HVAC-R and service water heating system controlssion hourizadehenergy_progress
11/22/2022Permanent certificatesion hourizadehenergy_progress
10/04/2022Permanent certificatesion hourizadehenergy_progress
10/04/2022Mechanical Systemssion hourizadehspecial
10/04/2022Finalsion hourizadehprogress
10/04/2022Maintenance informationsion hourizadehenergy_progress
10/04/2022HVAC-R and service water piping design and insulationsion hourizadehenergy_progress
10/04/2022HVAC-R and service water heating equipmentsion hourizadehenergy_progress
10/04/2022HVAC-R and service water heating system controlssion hourizadehenergy_progress
08/02/2022Mechanical Systemssion hourizadehspecial
08/02/2022Permanent certificatesion hourizadehenergy_progress
08/02/2022HVAC-R and service water heating equipmentsion hourizadehenergy_progress
08/02/2022HVAC-R and service water heating system controlssion hourizadehenergy_progress
08/02/2022Maintenance informationsion hourizadehenergy_progress
08/02/2022HVAC-R and service water piping design and insulationsion hourizadehenergy_progress
08/02/2022Finalsion hourizadehprogress
▾Documents — 86 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/02/2026M00777513-P1Request digital key ↗
09/02/2026M00777513-P2Request digital key ↗
09/02/2026M00777513-P5Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits27
▸BISPLAN / WORK APPROVAL APPLICATION20
05/31/2023104124369Open ↗
04/24/2023104124369Open ↗
04/21/2023104124369Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit5
08/13/2026M00777513-P5Open ↗
08/13/2026M00866460-I1Open ↗
08/13/2026M00777513-P1Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION1
06/28/2022104124369Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
11/15/2022104124369Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
11/02/2022104124369Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
12/06/2022104124369Open ↗
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature8
09/28/2026M00777513-P5Open ↗
09/28/2026M00777513-P5Open ↗
08/31/2026M00777513-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/13/2026M00777513-P1Open ↗
08/13/2026M00795453-I1Open ↗
08/13/2026M00777513-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/28/2026M00777513-P5Open ↗
08/31/2026M00777513-P1Open ↗
08/28/2026M00866460-I1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment1
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
12/15/2022104124369Open ↗
▸Safety & Tenant Protection12
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist7
08/13/2026M00866460-I1Open ↗
08/13/2026M00795453-I1Open ↗
08/13/2026M00866460-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWCertificate of No Harassment5
08/13/2026M00777513-I1Open ↗
08/13/2026M00777513-P1Open ↗
08/13/2026M00777513-P2Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/13/2026M00866460-S1Open ↗
08/13/2026M00866460-I1Open ↗
08/13/2026M00777513-P5Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00777513-I1Open ↗
▸Approvals, Objections & Sign-offs5
▸BISSCHEDULE A - OCCUPANCY / USE4
01/03/2023104124369Open ↗
12/30/2022104124369Open ↗
12/29/2022104124369Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER1
06/28/2022104124369Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT (FINAL): PW31
11/02/2022104124369Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION3
05/31/2023104124369Open ↗
10/11/2022104124369Open ↗
07/19/2022104124369Open ↗
▸Other Documents2
▸BIS* FIRE STOPS 27-3451
11/02/2022104124369Open ↗
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7791
11/02/2022104124369Open ↗