← Back
BuildNYC
Three families
659 METROPOLITAN AVENUE
BROOKLYN · BIN 3068723
💬 Discuss this project
1899Year Built
3Stories
C0Building Class
R7AZoning
2,400 sfGross Floor Area
3Units
Rent Stabilized10 Active Violations ▸FDNY Report ↗
Three families · 1,720 sf lot · 1.4 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofBuilding RenovationUnder Construction2p · 1 filing · 20 docs
Floor 3Unit 3BUnder Construction32p · 1 filing · 20 docs
Floor 2Building RenovationUnder Construction28p · 1 filing · 20 docs
Floor 1Building RenovationUnder Construction28p · 1 filing · 20 docs
CellarBuilding RenovationUnder Construction24p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/20/2021$2.1M—Private party → Private party$896/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Office of Architecture707/27/2026
Joseph K. Blum105/14/2025
FBJ Technical Services205/09/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Anzalone Architecture1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
360 General Contracting Ispecialty_contractor303/21/2026
PipestylistsPlumbing207/08/2026
360 General Contracting IGeneral Contractor107/08/2026
Jem Fire PreventionFire Protection107/08/2026
W.R. Plumbing and HeatingPlumbing108/30/2026
YD ConstructionGeneral Contractor104/22/2005
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Joseph K. Blum1741507/27/2026
RHL Engineering712807/27/2026
Building Lifecycle
11/11/2026
Signed off — Alteration CO
Install new sprinkler system including new 4-inch sprinkler service. No change in use, occupancy or egress.
B00908725-S3
08/28/2026
Permit renewed — Plumbing
Renewed with changes
B00908725-S1-PL
08/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Vincent Gentile
08/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vincent Gentile
08/17/2026
Special inspection requirement — Energy Code Compliance Inspections
Vincent Gentile
95 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedW.R. Plumbing and Heating08/28/2026
DOB NOWStructuralSigned-off360 General Contracting I09/05/2025
DOB NOWPlumbingPermit IssuedT & T Plumbing03/21/2025
DOB NOWPlumbingSigned-offT & T Plumbing11/21/2024
DOB NOWSprinklersSigned-offJem Fire Prevention11/21/2024
DOB NOWMechanical SystemsPermit Issued360 General Contracting I07/12/2024
BISOTISSUEDYD Construction04/22/2005
1 project · most recent 07/27/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
07/27/2026Signed-off360 General Contracting IAir Conditioning Systems, Ventilation Systems
1 project · most recent 07/27/2026
Sprinkler System
FiledStatusContractorScope
07/27/2026Signed-offJem Fire PreventionSprinkler System
1 project · most recent 07/27/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/27/2026Permit IssuedEflow Plumbing & WatermainGas, Water/Sanitary
1 project · most recent 10/17/2026
General Wiring
FiledStatusContractorScope
10/17/2026Permit IssuedY ElectricGeneral Wiring
1 project · most recent 07/27/2026
Steel Masonry Wood
FiledStatusContractorScope
07/27/2026Permit IssuedEflow Plumbing & WatermainSteel, Masonry, Wood
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
05/01/2026Pass-Final CND-Occupancy InspectionPassView ↗
10/10/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/26/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/26/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/26/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/24/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/13/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/13/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
03/10/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
08/17/2026HVAC-R and service water piping design and insulationVincent Gentileenergy_progress
08/17/2026Fire-Resistant Penetrations and JointsVincent Gentilespecial
08/17/2026Energy Code Compliance InspectionsVincent Gentileprogress
07/10/2026Fire-Resistant Penetrations and JointsVincent Gentilespecial
07/10/2026Energy Code Compliance InspectionsVincent Gentileprogress
07/10/2026HVAC-R and service water piping design and insulationVincent Gentileenergy_progress
05/14/2025Fire-Resistant Penetrations and JointsVincent Gentilespecial
05/14/2025Sprinkler SystemsVincent Gentilespecial
04/25/2025Post-installed AnchorsWILLIAM DEGRAAFFspecial
04/09/2025Insulation placement and R valuesVincent Gentileenergy_progress
04/09/2025Fenestration and door U-factor and product ratingsVincent Gentileenergy_progress
04/09/2025Maintenance informationVincent Gentileenergy_progress
04/09/2025HVAC-R and service water heating equipmentVincent Gentileenergy_progress
04/09/2025Interior lighting powerVincent Gentileenergy_progress
04/09/2025HVAC-R and service water heating system controlsVincent Gentileenergy_progress
04/09/2025Shutoff dampersVincent Gentileenergy_progress
04/09/2025MeteringVincent Gentileenergy_progress
04/09/2025Permanent certificateVincent Gentileenergy_progress
04/09/2025Fire-Resistant Penetrations and JointsVincent Gentilespecial
04/09/2025Energy Code Compliance InspectionsVincent Gentileprogress
04/09/2025HVAC-R and service water piping design and insulationVincent Gentileenergy_progress
04/09/2025Fenestration areasVincent Gentileenergy_progress
04/09/2025Fire-Resistant Penetrations and JointsVincent Gentilespecial
04/09/2025Mechanical SystemsVincent Gentilespecial
04/09/2025Energy Code Compliance InspectionsVincent Gentileprogress
Latest 25 of 37.
55 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account