← Back
One family attached or semi-detached
66-05 BOOTH STREET
QUEENS · BIN 4074781
💬 Discuss this project
1945Year Built
2Stories
A5Building Class
R4BZoning
1,800 sfGross Floor Area
1Units
11 Open Violations ▸
One family attached or semi-detached · 2,000 sf lot · 0.9 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Floor 27p · 2 filings · 20 docs
Floor 17p · 2 filings · 20 docs
Cellar10p · 2 filings · 20 docs
1 job · most recent 03/04/2025
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
03/04/2025Permit IssuedNEFCO ENTERPRISES INCAir Conditioning Systems, Heating Systems
Cooling
Carrier 1080000btu 108,000 BTU · Exhaust Fan ×12
Heating
Navien 360000 720,000 BTU ×8
1 job · most recent 02/02/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
02/02/2024Permit IssuedA.M. SAGE PLG & HTG LLCGas, Storm, Water/Sanitary
1 job · most recent 04/06/2023
General Wiring
FiledStatusContractorScope
04/06/2023Permit IssuedSUPREME ELECTRIC CORPGeneral Wiring
1 job · most recent 03/04/2025
Steel Concrete Masonry
FiledStatusContractorScope
03/04/2025Permit IssuedNEFCO ENTERPRISES INCSteel, Concrete, Masonry
1 job · most recent 03/04/2025
Earthwork
FiledStatusContractorScope
03/04/2025Permit IssuedNEFCO ENTERPRISES INCEarthwork
Building Lifecycle
All (105)Filed (7)Permit Issued (3)Signed Off (1)Violation (12)Inspection (6)Objection (46)Special Inspection (30)
03/06/2026
Violation issued (ECB, open)
Construction
03/06/2026
Violation issued (ECB, open)
Construction
03/06/2026
Violation issued (ECB, open)
Zoning
07/08/2025
Special inspection requirement — Masonry
SYED RIZVI
07/08/2025
Special inspection requirement — Final
HAYM GROSS
07/08/2025
Special inspection requirement — Mechanical Systems
SYED RIZVI
07/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SYED RIZVI
07/08/2025
Special inspection requirement — Concrete - Cast-In-Place
SYED RIZVI
07/08/2025
Special inspection requirement — Structural Cold-Formed Steel
SYED RIZVI
07/08/2025
Special inspection requirement — Structural Steel - Details
SYED RIZVI
07/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SYED RIZVI
07/08/2025
Special inspection requirement — Structural Wood Frame
SYED RIZVI
07/08/2025
Special inspection requirement — Energy Code Compliance Inspections
SYED RIZVI
07/08/2025
Special inspection requirement — Footing and Foundation
SYED RIZVI
07/08/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
SYED RIZVI
07/08/2025
Special inspection requirement — Subgrade Inspections
SYED RIZVI
07/08/2025
Special inspection requirement — Fire-Resistance Rated Construction
SYED RIZVI
07/08/2025
Special inspection requirement — Air barrier - visual inspection
SYED RIZVI
07/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
07/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
SYED RIZVI
07/08/2025
Special inspection requirement — Interior lighting power
SYED RIZVI
07/08/2025
Special inspection requirement — Fenestration air leakage
SYED RIZVI
07/08/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
SYED RIZVI
07/08/2025
Special inspection requirement — HVAC-R and service water heating system controls
07/08/2025
Special inspection requirement — Fenestration areas
SYED RIZVI
07/08/2025
Special inspection requirement — Lighting in dwelling units
SYED RIZVI
07/08/2025
Special inspection requirement — Lighting controls
SYED RIZVI
07/08/2025
Special inspection requirement — Insulation placement and R values
SYED RIZVI
07/08/2025
Special inspection requirement — Preliminary
SYED RIZVI
03/18/2025
Violation issued (ECB, open)
Construction
03/04/2025
Filed — Alteration CO
application filed herewith to enlarge at rear and front, existing one family dwelling. gut rehab
Q00664962-P6
03/04/2025
Special inspection requirement — Concrete - Cast-In-Place
SYED RIZVI
03/04/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
SYED RIZVI
03/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SYED RIZVI
03/04/2025
Special inspection requirement — Masonry
SYED RIZVI
11/21/2024
Violation issued (ECB, open)
Construction
11/08/2024
Objection raised — Zoning
11/08/2024
Objection resolved — Addressed
11/01/2024
Objection resolved — Addressed
09/09/2024
Objection resolved — Addressed
09/09/2024
Objection resolved — Addressed
08/01/2024
Objection raised — Zoning
08/01/2024
Objection raised — Zoning
08/01/2024
Objection raised — Zoning
07/18/2024
Filed — Alteration CO
application filed herewith to enlarge at rear and front, existing one family dwelling. gut rehab
Q00664962-P2
07/12/2024
Violation issued (ECB, open)
Zoning
07/12/2024
Violation issued (ECB, open)
Construction
07/12/2024
Violation issued (ECB, open)
Construction
07/12/2024
Violation issued (ECB, open)
Construction
06/17/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/12/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/11/2024
Signed off — Alteration
INSTALLING AN 8 FT HIGH TEMPORARY CONSTRUCTION WOOD FENCE IN CONJUNCTION WITH ALTERATION #Q00664962-I1
Q00693890-I1
03/08/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/29/2024
Objection resolved — Addressed
02/29/2024
Objection resolved — Addressed
02/28/2024
Objection raised — Inspections
02/14/2024
Objection raised — Zoning
02/12/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/02/2024
Filed — Alteration
PLUMBING WORK THRU OUT; INCONJUNCTION WITH ALT Q00664962
Q00684173-P1
01/24/2024
Permit issued — Mechanical Systems
Q00664962-I1-GC-CX
Latest 60 of 105 events.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/28/2021$996K—Private party → Private party$553/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HAYM S. GROSS, ARCHITECT503/04/2025
RIKE TECH ASSOCIATES LLC202/02/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BRITZ ENTERPRISES INC.1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEFCO ENTERPRISES INCGeneral Contractor303/21/2026
SEVA PROPERTY DEVLOPMENTGeneral Contractor107/08/2026
A.M. SAGE PLG & HTG LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RIKE TECH ASSOCIATES LLC2965503/04/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedNEFCO ENTERPRISES INC01/24/2024
DOB NOWPlumbingPermit IssuedA.M. SAGE PLG & HTG LLC11/03/2022
DOB NOWConstruction FenceSigned-offSEVA PROPERTY DEVLOPMENT05/25/2022
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
06/17/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/12/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/08/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/12/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/27/2023Fail-Final General Construction Non-Directive 14FailView ↗
11/21/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 78
DateRequirementInspectorRole
07/08/2025Subgrade InspectionsSYED RIZVIspecial
07/08/2025MasonrySYED RIZVIspecial
07/08/2025Concrete - Cast-In-PlaceSYED RIZVIspecial
07/08/2025Mechanical SystemsSYED RIZVIspecial
07/08/2025Fire-Resistant Penetrations and JointsSYED RIZVIspecial
07/08/2025Excavations - Sheeting, Shoring, and BracingSYED RIZVIspecial
07/08/2025Structural Cold-Formed SteelSYED RIZVIspecial
07/08/2025Structural Steel - DetailsSYED RIZVIspecial
07/08/2025Structural Stability – Alterations of existing buildingsSYED RIZVIspecial
07/08/2025Structural Wood FrameSYED RIZVIprogress
07/08/2025Energy Code Compliance InspectionsSYED RIZVIprogress
07/08/2025Footing and FoundationSYED RIZVIprogress
07/08/2025PreliminarySYED RIZVIprogress
07/08/2025FinalHAYM GROSSprogress
07/08/2025Fire-Resistance Rated ConstructionSYED RIZVIprogress
07/08/2025Air barrier - visual inspectionSYED RIZVIenergy_progress
07/08/2025HVAC-R and service water piping design and insulation—energy_progress
07/08/2025HVAC-R and service water heating equipmentSYED RIZVIenergy_progress
07/08/2025Interior lighting powerSYED RIZVIenergy_progress
07/08/2025Fenestration air leakageSYED RIZVIenergy_progress
07/08/2025Fenestration and door U-factor and product ratingsSYED RIZVIenergy_progress
07/08/2025HVAC-R and service water heating system controls—energy_progress
07/08/2025Fenestration areasSYED RIZVIenergy_progress
07/08/2025Lighting in dwelling unitsSYED RIZVIenergy_progress
07/08/2025Lighting controlsSYED RIZVIenergy_progress
Latest 25 of 78.
▾Documents — 69 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/26/2026Q00693890-I1Request digital key ↗
08/23/2026Q00684173-I1Request digital key ↗
08/20/2026Q00664962-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026Q00664962-P1Open ↗
08/13/2026Q00664962-I1Open ↗
08/13/2026Q00664962-P6Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00664962-I1Open ↗
▸Seals & Professional Certifications27
▸DOB NOWProgress Inspector Seal & Signature12
08/29/2026Q00664962-P6Open ↗
08/29/2026Q00664962-P6Open ↗
08/29/2026Q00664962-P6Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/29/2026Q00664962-P6Open ↗
08/29/2026Q00664962-P6Open ↗
08/28/2026Q00664962-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/23/2026Q00684173-I1Open ↗
08/23/2026Q00684173-P1Open ↗
08/20/2026Q00664962-P2Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist4
08/13/2026Q00664962-P6Open ↗
08/13/2026Q00664962-I1Open ↗
08/13/2026Q00664962-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00664962-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00664962-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/23/2026Q00684173-I1Open ↗
08/20/2026Q00664962-P2Open ↗
08/20/2026Q00664962-P6Open ↗
Showing 3 of 6 on file for this type
▸Other Documents18
▸DOB NOWSite Survey: Initial4
08/13/2026Q00664962-P6Open ↗
08/13/2026Q00664962-P1Open ↗
08/13/2026Q00664962-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026Q00664962-P1Open ↗
08/13/2026Q00664962-P2Open ↗
08/13/2026Q00664962-P6Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlot Diagram4
08/13/2026Q00664962-P6Open ↗
08/13/2026Q00664962-P1Open ↗
08/13/2026Q00664962-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/20/2026Q00664962-P2Open ↗
08/20/2026Q00664962-P6Open ↗
08/15/2026Q00664962-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00664962-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026Q00664962-I1Open ↗